i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
posted on 23 Sep 2023
I was interviewed in Aug 2023.
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Total station errors can affect GPS to GPS measurements due to various factors.
Total station errors can include instrument calibration errors, atmospheric conditions, and human error.
Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.
Regular calibration and maintenance of the total station can
posted on 7 Oct 2024
posted on 3 Aug 2023
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
An auto level machine is a surveying instrument used to measure height differences and level surfaces.
Auto level machines use a compensator to ensure accurate readings.
They are commonly used in construction, land surveying, and civil engineering.
Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.
True north is the direction towards the geographic North Pole, while magnetic north is the direction towards the north magnetic pole.
True north is fixed and does not change over time, while magnetic north constantly shifts due to changes in the Earth's magnetic field.
True north is used for navigation on maps and charts, while magnetic north is used by compasses.
The angle between true north and magnetic north is called ...
The first surveyor in India is George Everest, who served as the Surveyor General of India from 1830 to 1843.
George Everest was appointed as the Surveyor General of India in 1830.
He is known for his work in mapping the Indian subcontinent, including the measurement of the height of Mount Everest which was later named after him.
Everest's tenure as Surveyor General of India laid the foundation for modern mapping and surv
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Aug 2021. There was 1 interview round.
posted on 1 Nov 2021
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Traverse is a method of surveying to determine the position and orientation of points on the ground.
Traverse involves measuring angles and distances between points
Accuracy depends on the precision of instruments used and the skill of the surveyor
Traverse can be closed or open depending on whether it returns to the starting point
Examples of traverse include boundary surveys and construction layout
Gradient is the rate of change of a function with respect to its variables.
Gradient is a measure of how steep a line or curve is at a particular point.
It is calculated by finding the slope of the tangent line to the curve at that point.
In calculus, gradient is used to find the direction of maximum increase of a function.
For example, the gradient of a hill represents the steepness of the slope.
In physics, gradient is us...
based on 14 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6 L/yr - ₹20 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Engineer
1.3k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹16.6 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹32 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra