I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Traverse is a method of surveying to determine the position and orientation of points on the ground.
Traverse involves measuring angles and distances between points
Accuracy depends on the precision of instruments used and the skill of the surveyor
Traverse can be closed or open depending on whether it returns to the starting point
Examples of traverse include boundary surveys and construction layout
Gradient is the rate of change of a function with respect to its variables.
Gradient is a measure of how steep a line or curve is at a particular point.
It is calculated by finding the slope of the tangent line to the curve at that point.
In calculus, gradient is used to find the direction of maximum increase of a function.
For example, the gradient of a hill represents the steepness of the slope.
In physics, gradient is us...
Top trending discussions
posted on 4 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 25 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
The properties of steel and concrete, PSC and RCC structures, execution strategy, and assisting the designer according to site conditions.
Steel has high tensile strength and is commonly used in construction for beams, columns, and reinforcement.
Concrete is a composite material made of cement, aggregates, and water, providing compressive strength and durability.
PSC (Prestressed Concrete) structures use pre-tensioning or...
posted on 30 Nov 2021
posted on 9 Nov 2023
The amount of steel a fitter can bind in a day depends on various factors such as the complexity of the job, the skill level of the fitter, and the tools/equipment available.
The amount of steel a fitter can bind in a day can vary based on the size and complexity of the project.
A skilled fitter with access to efficient tools and equipment may be able to bind more steel in a day compared to a less experienced fitter.
Fact...
They will ask you questions related your work like how many types of foundation you have done
posted on 2 Feb 2024
I applied via Campus Placement
posted on 6 Feb 2024
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
SF and BM diagram
SF stands for System Flow diagram, which represents the flow of data and processes within a system.
BM stands for Block Model diagram, which represents the components and their relationships in a system.
SF diagram focuses on the flow of data and processes, while BM diagram focuses on the structure and relationships of components.
SF diagram helps in understanding the sequence and dependencies of processe...
posted on 23 Mar 2024
I applied via Campus Placement and was interviewed before Mar 2023. There were 3 interview rounds.
Quant, Reasoning, English
posted on 24 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There were 4 interview rounds.
Arithmetic and logical reasoning
Selection of components is crucial for ensuring the performance and reliability of a system.
Consider the specifications and requirements of the system
Evaluate the quality, compatibility, and reliability of components
Ensure components are cost-effective and readily available
Test components for performance and durability
Consider factors like power consumption, size, and weight
Examples: selecting the right processor for a...
Share details of project challenges
posted on 12 Mar 2024
Project safety refers to the measures and protocols put in place to ensure the well-being and protection of individuals involved in a project.
Ensures the physical and mental well-being of workers and stakeholders
Reduces the risk of accidents, injuries, and fatalities
Compliance with safety regulations and standards
Enhances productivity and efficiency by minimizing disruptions
Builds trust and reputation with clients and ...
Project scheduling is the process of creating a timeline for completing tasks and milestones within a project.
Identifying project tasks and their dependencies
Estimating the time required for each task
Sequencing tasks in the most efficient order
Assigning resources to tasks
Monitoring progress and adjusting the schedule as needed
In a fire case situation at a project, it is crucial to follow safety protocols and evacuate all personnel immediately.
Ensure all personnel are aware of the emergency procedures and evacuation routes.
Contact emergency services and alert them of the situation.
Use fire extinguishers if safe to do so, but prioritize safety of personnel.
Account for all personnel after evacuation to ensure everyone is safe.
Investigate the c...
I have used project management tools such as Jira, Trello, and Asana in previous projects.
Jira
Trello
Asana
I have experience using CAD tools such as AutoCAD, SolidWorks, and CATIA for designing and modeling.
AutoCAD
SolidWorks
CATIA
based on 3 interviews
Interview experience
based on 49 reviews
Rating in categories
Engineer
898
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
878
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
501
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
412
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
345
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company