I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
Types of compactors include plate compactors, vibratory rollers, and rammer compactors.
Plate compactors are used for small-scale compaction of soil and asphalt.
Vibratory rollers are used for larger areas and provide a smooth finish.
Rammer compactors are used for compacting cohesive soils in confined spaces.
Density of soil refers to the mass of soil per unit volume.
Density of soil is typically measured in units of grams per cubic centimeter (g/cm^3) or kilograms per cubic meter (kg/m^3).
The density of soil can vary depending on factors such as composition, moisture content, and compaction.
For example, sandy soil tends to have a lower density compared to clayey soil.
Compacted soil generally has a higher density than loose ...
Types of rock commonly encountered in construction include sedimentary, igneous, and metamorphic. Blasting methods include controlled blasting, presplitting, smooth blasting, and line drilling.
Sedimentary rock is formed from sediment such as sand, silt, or clay. Examples include limestone and sandstone.
Igneous rock is formed from cooled and solidified magma or lava. Examples include granite and basalt.
Metamorphic rock ...
Safety during blasting is maintained through proper planning, communication, training, and monitoring.
Develop a detailed blasting plan that includes safety procedures and precautions.
Ensure all personnel involved in the blasting operation are properly trained and certified.
Implement exclusion zones to keep unauthorized personnel away from the blast site.
Use warning signals and alarms to alert workers before blasting.
Mo...
Sieve analysis is a method used to determine the particle size distribution of a granular material.
Sieve analysis involves passing a sample of material through a series of sieves with progressively smaller openings.
The size of the sieve openings varies, typically ranging from 3 inches to 3 microns.
The material retained on each sieve is weighed and the percentage of total material retained on each sieve is calculated.
Th...
I applied via Campus Placement and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 29 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
How to save inventry cost
based on 1 interview
Interview experience
based on 38 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹6.5 L/yr - ₹18.5 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.3k
salaries
| ₹1.6 L/yr - ₹9.5 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Civil Engineer
1k
salaries
| ₹2.2 L/yr - ₹11 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International