Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Questions, Process, and Tips

Updated 28 Oct 2024

Top Larsen & Toubro Limited Assistant Civil Construction Manager Interview Questions and Answers

View all 6 questions

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Types of compactor?
  • Ans. 

    Types of compactors include plate compactors, vibratory rollers, and rammer compactors.

    • Plate compactors are used for small-scale compaction of soil and asphalt.

    • Vibratory rollers are used for larger areas and provide a smooth finish.

    • Rammer compactors are used for compacting cohesive soils in confined spaces.

  • Answered by AI
  • Q2. Density of soil?
  • Ans. 

    Density of soil refers to the mass of soil per unit volume.

    • Density of soil is typically measured in units of grams per cubic centimeter (g/cm^3) or kilograms per cubic meter (kg/m^3).

    • The density of soil can vary depending on factors such as composition, moisture content, and compaction.

    • For example, sandy soil tends to have a lower density compared to clayey soil.

    • Compacted soil generally has a higher density than loose ...

  • Answered by AI
  • Q3. Types of rock& type of blasting?
  • Ans. 

    Types of rock commonly encountered in construction include sedimentary, igneous, and metamorphic. Blasting methods include controlled blasting, presplitting, smooth blasting, and line drilling.

    • Sedimentary rock is formed from sediment such as sand, silt, or clay. Examples include limestone and sandstone.

    • Igneous rock is formed from cooled and solidified magma or lava. Examples include granite and basalt.

    • Metamorphic rock ...

  • Answered by AI
  • Q4. How does maintain safety when blasting?
  • Ans. 

    Safety during blasting is maintained through proper planning, communication, training, and monitoring.

    • Develop a detailed blasting plan that includes safety procedures and precautions.

    • Ensure all personnel involved in the blasting operation are properly trained and certified.

    • Implement exclusion zones to keep unauthorized personnel away from the blast site.

    • Use warning signals and alarms to alert workers before blasting.

    • Mo...

  • Answered by AI
  • Q5. Sieve analysis method? And size of sieve?
  • Ans. 

    Sieve analysis is a method used to determine the particle size distribution of a granular material.

    • Sieve analysis involves passing a sample of material through a series of sieves with progressively smaller openings.

    • The size of the sieve openings varies, typically ranging from 3 inches to 3 microns.

    • The material retained on each sieve is weighed and the percentage of total material retained on each sieve is calculated.

    • Th...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Time cycle for box girder erection?
  • Ans. 

    The time cycle for box girder erection varies depending on factors such as size, complexity, equipment availability, and workforce efficiency.

    • Time cycle can range from a few days to several weeks, depending on the project requirements.

    • Factors such as weather conditions and site accessibility can also impact the time cycle for box girder erection.

    • Efficient planning, coordination, and communication among the construction...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a core compentency in what ever work you perform.civil engineering is very vast you cant be expert in all field.

Assistant Civil Construction Manager Interview Questions Asked at Other Companies

Q1. How does maintain safety when blasting?
Q2. Sieve analysis method? And size of sieve?
Q3. Types of rock& type of blasting?
Q4. time cycle for box girder erection?
Q5. Density of soil?

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experience related questions and queries...

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk confident and honest.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mostly Questions asked on Paving work
  • Q2. Questions asked on Paving Machineries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. By Sr Manager Fully technical round
  • Q2. Mostly questions from your last project
Round 2 - Aptitude Test 

Computer base test Technical & Reasoning questions

Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Just prepare basic technical questions
Follow me on instagram for details @ civilwallah
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Acquaintances with Minor irrigation systems
  • Ans. 

    I have experience working with minor irrigation systems, including design, installation, and maintenance.

    • Designed irrigation systems for small-scale agricultural projects

    • Installed drip irrigation systems for gardens and landscaping

    • Performed routine maintenance on irrigation pumps and pipes

    • Troubleshooted and repaired irrigation system malfunctions

  • Answered by AI
  • Q2. QA and QC related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company

I was interviewed before Jul 2021.

Round 1 - Technical 

(1 Question)

  • Q1. Mechanical Piping & Structural basis
Round 2 - HR 

(1 Question)

  • Q1. Expected CTC, How much favoured you this company if we are hiring to you

Interview Preparation Tips

Interview preparation tips for other job seekers - Just focused on your resume what is the content added in it & prepared the same subject to crack that
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Your Job profile in last job
  • Q2. Explained all about my experience
  • Q3. Then technical specified related to work pertaining to my Job profile
  • Q4. Challenges I have faced during my last job experience
  • Q5. Any accident on site that you have seen what action you must take to avoid accident at site

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are experienced professional go through all technical specifications related to your site work ,go through method statements and you must know all basics in order to crack it.Questions asked are basic and check whether you have done that work or not
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Construction question
Round 3 - Aptitude Test 

Genral aptitude test

Round 4 - HR 

(1 Question)

  • Q1. Discussion about previous work

Interview Preparation Tips

Interview preparation tips for other job seekers - All necessary documents
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Asked about underground metro station construction works specifically D-wall using hydraulic grab/trench cutters. Challenges during the construction of UG stations.
Round 3 - HR 

(1 Question)

  • Q1. Asked to send soft copies of relevant documents and asked salary expectations Salary negotiations done.

Interview Preparation Tips

Topics to prepare for Tata Projects Construction Manager Civil interview:
  • Technical Skills
  • Site Execution
  • Metro Rail
  • Underground
  • Bridges
  • Civil Engineering
Interview preparation tips for other job seekers - Your resume content should match recruiters job descriptions and it’s requirement and add challenges you face during the work.

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Assistant Civil Construction Manager interview?
Larsen & Toubro Limited interview process usually has 1 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Technical.
What are the top questions asked in Larsen & Toubro Limited Assistant Civil Construction Manager interview?

Some of the top questions asked at the Larsen & Toubro Limited Assistant Civil Construction Manager interview -

  1. How does maintain safety when blasti...read more
  2. Sieve analysis method? And size of sie...read more
  3. Types of rock& type of blasti...read more

Tell us how to improve this page.

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Process

based on 2 interviews

1 Interview rounds

  • Technical Round
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Tata Group Interview Questions
4.2
 • 358 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
Ashok Leyland Interview Questions
4.1
 • 237 Interviews
View all
Larsen & Toubro Limited Assistant Civil Construction Manager Salary
based on 52 salaries
₹7 L/yr - ₹16.3 L/yr
At par with the average Assistant Civil Construction Manager Salary in India
View more details

Larsen & Toubro Limited Assistant Civil Construction Manager Reviews and Ratings

based on 38 reviews

4.3/5

Rating in categories

4.4

Skill development

3.6

Work-life balance

4.1

Salary

4.5

Job security

4.0

Company culture

3.6

Promotions

4.1

Work satisfaction

Explore 38 Reviews and Ratings
Assistant Manager
3.9k salaries
unlock blur

₹6.5 L/yr - ₹18 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹3.8 L/yr - ₹13 L/yr

Manager
1.3k salaries
unlock blur

₹9 L/yr - ₹30 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.2 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹6 L/yr - ₹21 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview