Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Questions, Process, and Tips

Updated 28 Oct 2024

Top Larsen & Toubro Limited Assistant Civil Construction Manager Interview Questions and Answers

View all 6 questions

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Types of compactor?
  • Ans. 

    Types of compactors include plate compactors, vibratory rollers, and rammer compactors.

    • Plate compactors are used for small-scale compaction of soil and asphalt.

    • Vibratory rollers are used for larger areas and provide a smooth finish.

    • Rammer compactors are used for compacting cohesive soils in confined spaces.

  • Answered by AI
  • Q2. Density of soil?
  • Ans. 

    Density of soil refers to the mass of soil per unit volume.

    • Density of soil is typically measured in units of grams per cubic centimeter (g/cm^3) or kilograms per cubic meter (kg/m^3).

    • The density of soil can vary depending on factors such as composition, moisture content, and compaction.

    • For example, sandy soil tends to have a lower density compared to clayey soil.

    • Compacted soil generally has a higher density than loose ...

  • Answered by AI
  • Q3. Types of rock& type of blasting?
  • Ans. 

    Types of rock commonly encountered in construction include sedimentary, igneous, and metamorphic. Blasting methods include controlled blasting, presplitting, smooth blasting, and line drilling.

    • Sedimentary rock is formed from sediment such as sand, silt, or clay. Examples include limestone and sandstone.

    • Igneous rock is formed from cooled and solidified magma or lava. Examples include granite and basalt.

    • Metamorphic rock ...

  • Answered by AI
  • Q4. How does maintain safety when blasting?
  • Ans. 

    Safety during blasting is maintained through proper planning, communication, training, and monitoring.

    • Develop a detailed blasting plan that includes safety procedures and precautions.

    • Ensure all personnel involved in the blasting operation are properly trained and certified.

    • Implement exclusion zones to keep unauthorized personnel away from the blast site.

    • Use warning signals and alarms to alert workers before blasting.

    • Mo...

  • Answered by AI
  • Q5. Sieve analysis method? And size of sieve?
  • Ans. 

    Sieve analysis is a method used to determine the particle size distribution of a granular material.

    • Sieve analysis involves passing a sample of material through a series of sieves with progressively smaller openings.

    • The size of the sieve openings varies, typically ranging from 3 inches to 3 microns.

    • The material retained on each sieve is weighed and the percentage of total material retained on each sieve is calculated.

    • Th...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Time cycle for box girder erection?
  • Ans. 

    The time cycle for box girder erection varies depending on factors such as size, complexity, equipment availability, and workforce efficiency.

    • Time cycle can range from a few days to several weeks, depending on the project requirements.

    • Factors such as weather conditions and site accessibility can also impact the time cycle for box girder erection.

    • Efficient planning, coordination, and communication among the construction...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a core compentency in what ever work you perform.civil engineering is very vast you cant be expert in all field.

Assistant Civil Construction Manager Interview Questions Asked at Other Companies

Q1. How does maintain safety when blasting?
Q2. Sieve analysis method? And size of sieve?
Q3. Types of rock& type of blasting?
Q4. time cycle for box girder erection?
Q5. Density of soil?

I applied via Campus Placement and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experience related questions and queries...

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk confident and honest.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a dedicated and experienced professional with a strong background in management and leadership.

    • Over 5 years of experience in management roles

    • Proven track record of successfully leading teams to achieve goals

    • Strong communication and problem-solving skills

    • Bachelor's degree in Business Administration from XYZ University

    • Passionate about developing and mentoring team members

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always let them know your full career with learn
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Work Experience
  • Q2. S&t principle, interlocking

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Assistant Civil Construction Manager interview?
Larsen & Toubro Limited interview process usually has 1 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Technical.
What are the top questions asked in Larsen & Toubro Limited Assistant Civil Construction Manager interview?

Some of the top questions asked at the Larsen & Toubro Limited Assistant Civil Construction Manager interview -

  1. How does maintain safety when blasti...read more
  2. Sieve analysis method? And size of sie...read more
  3. Types of rock& type of blasti...read more

Tell us how to improve this page.

Larsen & Toubro Limited Assistant Civil Construction Manager Interview Process

based on 2 interviews

1 Interview rounds

  • Technical Round
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 453 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Dilip Buildcon Interview Questions
4.0
 • 147 Interviews
View all
Larsen & Toubro Limited Assistant Civil Construction Manager Salary
based on 46 salaries
₹8.5 L/yr - ₹16.5 L/yr
At par with the average Assistant Civil Construction Manager Salary in India
View more details

Larsen & Toubro Limited Assistant Civil Construction Manager Reviews and Ratings

based on 38 reviews

4.2/5

Rating in categories

4.4

Skill development

3.5

Work-life balance

4.1

Salary

4.5

Job security

3.9

Company culture

3.5

Promotions

4.1

Work satisfaction

Explore 38 Reviews and Ratings
Assistant Manager
3.9k salaries
unlock blur

₹5.3 L/yr - ₹18.4 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.3 L/yr

Manager
1.1k salaries
unlock blur

₹9 L/yr - ₹29 L/yr

Assistant Construction Manager
1k salaries
unlock blur

₹6 L/yr - ₹21.5 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview