I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
The slab procedure involves several steps from preparation to finishing.
Site preparation and excavation
Formwork and reinforcement installation
Pouring and leveling of concrete
Curing and finishing
Removal of formwork and inspection
Installation of utilities and backfilling
Final inspection and approval
posted on 1 Oct 2024
I applied via Campus Placement
Overlap refers to the area where two or more elements share common space or features.
Overlap occurs when two or more elements occupy the same physical space or have common characteristics.
In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.
Overlap can also occur in surveying when two survey lines intersect or overlap each other.
Prop...
Overlapping in civil engineering is done to ensure proper continuity and strength in construction.
Overlapping is done to ensure continuity of reinforcement bars in concrete structures.
It helps in distributing the load evenly and prevents sudden failure.
Overlapping also helps in providing the required strength to the structure.
Proper overlapping ensures that the structure can withstand various stresses and forces.
For ex...
posted on 12 Jun 2024
Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
posted on 3 Nov 2023
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Online exam 50 marks in VC.
I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.
IS code refers to Indian Standards code which provides technical specifications for various products and services.
IS codes are developed by the Bureau of Indian Standards (BIS)
They cover a wide range of products and services such as construction materials, electrical appliances, food products, and more
IS codes provide technical specifications for quality, safety, and performance of products and services
Compliance with ...
posted on 15 Feb 2022
I was interviewed before Feb 2021.
The ratio of M25 grade concrete is 1:1:2.
The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for various applications.
For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.
posted on 21 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
posted on 5 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 4 interview rounds.
Camber is the upward curve given to a road or bridge surface to counteract the effects of gravity and prevent sagging.
Camber is a slight upward curve given to a road or bridge surface.
It is used to counteract the effects of gravity and prevent sagging.
Camber is also used in racing cars to improve handling and stability.
The amount of camber required depends on the design and purpose of the road or bridge.
Camber can be p...
posted on 2 May 2023
About personality, work schedule, team work, Kick of work, progress achieving goals.
posted on 5 Jul 2024
Field process refers to the activities and procedures carried out on-site during construction or maintenance of civil engineering projects.
Field process involves site preparation, excavation, foundation construction, structural erection, and finishing works.
It includes quality control inspections, material testing, and adherence to safety regulations.
Field process also involves coordination with subcontractors, supplie...
A transmission line is a specialized cable or other structure designed to carry electrical signals over long distances with minimal loss.
Transmits electrical signals over long distances
Minimizes signal loss
Used in telecommunications, power distribution, and networking
Examples include overhead power lines and fiber optic cables
based on 3 reviews
Rating in categories
Site Engineer
23
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
9
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Horticulturist
6
salaries
| ₹3.5 L/yr - ₹5 L/yr |
QS Engineer
6
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Quantity Surveyor
5
salaries
| ₹1.5 L/yr - ₹5.3 L/yr |
Godrej Properties
Sobha
DLF
Prestige Group