I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
The slab procedure involves several steps from preparation to finishing.
Site preparation and excavation
Formwork and reinforcement installation
Pouring and leveling of concrete
Curing and finishing
Removal of formwork and inspection
Installation of utilities and backfilling
Final inspection and approval
posted on 5 Feb 2021
ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.
ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.
The organization also offers research and assessment services for educational institutions.
ETS uses computer-based testing and scoring for many of its exams.
The organization has faced criticism for its role in the standardized testing in
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
3 candidate was their vs 1 opening
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
based on 45 reviews
Rating in categories
Site Engineer
23
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
9
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Horticulturist
6
salaries
| ₹3.5 L/yr - ₹5 L/yr |
QS Engineer
6
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Quantity Surveyor
5
salaries
| ₹1.5 L/yr - ₹5.3 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies