Filter interviews by
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2022. There was 1 interview round.
L&T Energy Hydrocarbon interview questions for popular designations
I applied via campus placement at Shivaji University, Kolhapur and was interviewed before Oct 2022. There were 3 interview rounds.
Yes, I have knowledge in Piping engineering.
I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.
I have practical experience working on piping projects in my previous roles.
I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.
Get interview-ready with Top L&T Energy Hydrocarbon Interview Questions
I applied via Recruitment Consultant and was interviewed in Sep 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
Discuss past experience and present roll and how they handle the crusial time and focus off present working nature...
Fixing timing and company policies involves ensuring adherence to set schedules and rules.
Ensure employees are aware of company policies and timing expectations
Address any issues or discrepancies in timing or policy adherence promptly
Implement clear communication channels for employees to raise concerns or seek clarification
Regularly review and update company policies to reflect changes in regulations or best practices
I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.
ITP stands for Inspection and Test Plan. Sensitization is a process where stainless steel loses its corrosion resistance due to high temperature exposure.
ITP is a document that outlines the inspection and testing requirements for a project.
It includes details on the materials, equipment, and procedures to be used.
Sensitization occurs when chromium carbides form in the grain boundaries of stainless steel, reducing its c...
WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.
WPS is a document that provides detailed instructions on how to perform a specific welding procedure.
It includes information on welding parameters, materials, joint design, and pre- and post-welding treatments.
PQR is a record that documents the results of a procedure qualification test.
It verifies that a specific welding pr...
I applied via Recruitment Consultant
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the L&T Energy Hydrocarbon interview -
The duration of L&T Energy Hydrocarbon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 84 interviews
Interview experience
based on 1.6k reviews
Rating in categories
1-3 Yrs
Not Disclosed
Assistant Manager
753
salaries
| ₹6 L/yr - ₹19 L/yr |
Manager
339
salaries
| ₹10.2 L/yr - ₹30 L/yr |
Senior Engineer
270
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Piping Engineer
137
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Assistant General Manager
116
salaries
| ₹17 L/yr - ₹35 L/yr |
TechnipFMC
McDermott International
Saipem
Punj Lloyd