Round 1 - Technical 

(2 Questions)

  • Q1. Which grade of concrete normal use for rcc
  • Ans. 

    The grade of concrete normally used for RCC is M20.

    • The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.

    • The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.

    • Other grades of concrete like M25, M30, M35, etc., can also be used depend...

  • Answered by AI
  • Q2. What are the pre initiative action for start pilling
  • Ans. 

    Pre-initiative actions for start piling

    • Conduct a geotechnical investigation to assess soil conditions

    • Obtain necessary permits and approvals from local authorities

    • Develop a detailed piling plan and schedule

    • Procure required piling equipment and materials

    • Ensure safety measures are in place for workers and surrounding areas

    • Prepare the site by clearing any obstacles or debris

    • Establish proper communication channels with stak...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is the duration for deshuttering a beam of span 4 mtr
  • Ans. 

    The duration for deshuttering a beam of span 4 mtr depends on various factors.

    • The type of formwork used for shuttering the beam

    • The strength of the concrete used

    • The ambient temperature and humidity

    • The curing process followed

    • The complexity of the beam design

    • The availability of manpower and equipment

    • Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr

  • Answered by AI
  • Q2. What is the procedure to define one way and two way slab.How you will fix the reinforcement for two way slab
  • Ans. 

    To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.

    • One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.

    • Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.

    • For two way slab, reinforcement is fixed in both directions to distribute the...

  • Answered by AI
  • Q3. Longer span/ shorter span less than or equal to 2 is called one way slab,more than 2 is called two way slab.In one way slab main bar placeing should be shorter detection & two way slab main bar should be...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.listen all the question carefully before you give the answer.If you don't know the exact answer say sorry.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sewerage System - Design Standards
  • Ans. 

    Design standards for sewerage system

    • Design standards vary based on location and regulations

    • Consideration should be given to factors such as population density, topography, and soil type

    • Standards may include minimum pipe diameter, slope, and depth

    • Examples of design standards include ASCE 15 and EPA guidelines

  • Answered by AI
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(7 Questions)

  • Q1. What is your current workplace?
  • Ans. 

    I am currently working at a construction company specializing in infrastructure projects.

    • Specializing in infrastructure projects

    • Working at a construction company

    • Dealing with civil engineering tasks

  • Answered by AI
  • Q2. What is your experience in this field?
  • Ans. 

    I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.

    • Managed site development projects from concept to completion

    • Designed infrastructure systems such as water supply and drainage

    • Performed construction management duties to ensure projects stayed on schedule and within budget

    • Worked on projects ranging from residential de...

  • Answered by AI
  • Q3. How do you handle a site in the transmission sector?
  • Ans. 

    Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.

    • Coordinate with utility companies to ensure proper installation of transmission lines

    • Ensure compliance with safety regulations and environmental standards

    • Oversee the construction process to ensure quality and timely completion

    • Manage and resolve any iss...

  • Answered by AI
  • Q4. What are the key considerations for the foundation in transmission line construction?
  • Ans. 

    Key considerations for foundation in transmission line construction

    • Soil type and bearing capacity must be assessed

    • Proper foundation design to support the weight and wind loads of the transmission line towers

    • Consideration of environmental factors such as seismic activity and flooding

    • Accessibility for construction equipment and maintenance

    • Proper drainage to prevent erosion and foundation instability

  • Answered by AI
  • Q5. What is the best method for erection in transmission?
  • Ans. 

    The best method for erection in transmission is using cranes and specialized equipment.

    • Use cranes for lifting and placing heavy transmission components

    • Ensure proper planning and coordination to avoid delays

    • Utilize specialized equipment for precise positioning

    • Follow safety protocols to prevent accidents

    • Consider environmental factors such as wind and terrain

  • Answered by AI
  • Q6. How do you adapt to various challenging situations?
  • Ans. 

    I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.

    • Stay calm and composed under pressure

    • Analyze the problem thoroughly before taking action

    • Seek advice and input from colleagues or experts

    • Think creatively to come up with innovative solutions

  • Answered by AI
  • Q7. What is the role of the diagonal in the transmission sector?
  • Ans. 

    The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.

    • The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.

    • They prevent the tower from buckling or collapsing under various loads.

    • Diagonals also help in reducing the overall weight of the tower by transferring some of the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for work by acquiring knowledge about all the processes in this field, including any difficulties or problems related to this transmission line.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Ans. 

    The interview process was thorough and challenging, but overall a positive experience.

    • The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.

    • I was asked to discuss my previous projects and experiences in detail.

    • There were questions about problem-solving skills and how I handle challenging situations on site.

    • Overall, the interviewers were professional and provided a clear

  • Answered by AI
  • Q2. What are your salary expectations?
  • Ans. 

    My salary expectations are in line with industry standards and based on my experience and qualifications.

    • Research industry standards for Civil Site Engineers in the specific location

    • Consider years of experience and level of qualifications

    • Be prepared to negotiate based on job responsibilities and benefits package

  • Answered by AI
  • Q3. Why you last company leave
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Opportunity for professional growth

    • Company restructuring or downsizing

    • Relocation to a new city

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering
  • Q2. What is a structure
  • Ans. 

    A structure is a system or arrangement of parts that are interconnected and function together to support loads and resist forces.

    • Structures can be man-made or natural

    • They can be made of various materials such as steel, concrete, wood, etc.

    • Examples include buildings, bridges, dams, towers, etc.

  • Answered by AI
  • Q3. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.

    • Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.

    • Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.

    • Reinforced concrete contains steel reinforcement bars to increase its ...

  • Answered by AI
  • Q4. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures.

    • The mix proportions vary for different grades of concrete t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have confidence

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

They ask question on SFD AND BMD

Round 3 - Technical 

(2 Questions)

  • Q1. They ask question on SFD & BMD
  • Q2. And they also ask question on orthographic

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer was very chill and calm

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Sr.Engineer-Projects interview?
L&T Energy Hydrocarbon interview process usually has 2 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process are Technical.
What are the top questions asked in L&T Energy Hydrocarbon Sr.Engineer-Projects interview?

Some of the top questions asked at the L&T Energy Hydrocarbon Sr.Engineer-Projects interview -

  1. What is the procedure to define one way and two way slab.How you will fix the r...read more
  2. Which grade of concrete normal use for ...read more
  3. What is the duration for deshuttering a beam of span 4 ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
GAIL Interview Questions
4.4
 • 78 Interviews
TechnipFMC Interview Questions
4.0
 • 69 Interviews
Bechtel Interview Questions
4.0
 • 67 Interviews
View all
L&T Energy Hydrocarbon Sr.Engineer-Projects Salary
based on 4 salaries
₹6.8 L/yr - ₹9 L/yr
20% less than the average Sr.Engineer-Projects Salary in India
View more details

L&T Energy Hydrocarbon Sr.Engineer-Projects Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
841 salaries
unlock blur

₹5.1 L/yr - ₹19 L/yr

Manager
339 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
256 salaries
unlock blur

₹3.5 L/yr - ₹13 L/yr

Piping Engineer
136 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
115 salaries
unlock blur

₹13.4 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

TechnipFMC

4.0
Compare

McDermott International

4.3
Compare

Saipem

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview