Upload Button Icon Add office photos

L&T Energy Hydrocarbon

Compare button icon Compare button icon Compare

Filter interviews by

L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer Interview Questions, Process, and Tips

Updated 13 Nov 2024

L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(30 Questions)

  • Q1. What you have done in piping
  • Ans. 

    I have designed and implemented piping systems for various industrial projects.

    • Designed piping layouts for new construction projects

    • Analyzed existing piping systems for efficiency and made recommendations for improvements

    • Collaborated with other engineers and contractors to ensure proper installation and functionality

    • Performed stress analysis on piping systems to ensure safety and reliability

  • Answered by AI
  • Q2. How many tipes of drawings
  • Ans. 

    There are various types of drawings used in engineering, including mechanical drawings, architectural drawings, electrical drawings, and civil drawings.

    • Mechanical drawings: used to illustrate mechanical components and systems

    • Architectural drawings: used to show the layout and design of buildings

    • Electrical drawings: used to depict electrical systems and wiring

    • Civil drawings: used for infrastructure projects like roads a

  • Answered by AI
  • Q3. What is a role of LPD and HPV, why installation in line
  • Ans. 

    LPD and HPV play a crucial role in controlling pressure and flow in pipelines, ensuring efficient operation and preventing damage.

    • LPD (Low Pressure Drop) valves help reduce pressure loss in pipelines, improving efficiency and reducing energy consumption

    • HPV (High Pressure Valve) valves are used to control high pressure flow in pipelines, preventing damage and ensuring safety

    • Installation in line ensures that LPD and HPV ...

  • Answered by AI
  • Q4. How to decide test in piping
  • Ans. 

    Tests in piping are decided based on factors like material, pressure, temperature, and intended use.

    • Consider the material of the piping (e.g. steel, PVC) to determine appropriate tests.

    • Take into account the pressure and temperature the piping will be subjected to.

    • Identify the intended use of the piping (e.g. water supply, gas distribution) to select relevant tests.

    • Common tests include hydrostatic testing, pneumatic tes

  • Answered by AI
  • Q5. How many gauge are provide during hydro
  • Ans. 

    Typically, multiple gauges are provided during hydro testing to monitor pressure and ensure safety.

    • Multiple gauges are provided during hydro testing to monitor pressure at different points.

    • Common gauges used include pressure gauges, temperature gauges, and flow meters.

    • The number of gauges provided can vary depending on the size and complexity of the system being tested.

    • For example, a hydro test on a large industrial pi...

  • Answered by AI
  • Q6. Why are dropping pressure at highest point guage during hydro
  • Ans. 

    The dropping pressure at the highest point gauge during hydro testing is due to the natural phenomenon of hydrostatic head pressure.

    • Hydrostatic head pressure decreases as the height of the fluid column decreases.

    • The pressure at the highest point gauge will be lower compared to the pressure at the bottom of the system.

    • This drop in pressure is expected and is a normal occurrence during hydro testing.

    • Factors such as eleva...

  • Answered by AI
  • Q7. Difference between SS304 and SS316
  • Ans. 

    SS304 is a basic stainless steel alloy with 18% chromium and 8% nickel, while SS316 has 16% chromium, 10% nickel, and 2% molybdenum.

    • SS304 is more commonly used for general applications due to its lower cost and good corrosion resistance.

    • SS316 is preferred for applications where higher corrosion resistance is required, such as in marine environments or chemical processing plants.

    • SS316 is also more resistant to pitting a...

  • Answered by AI
  • Q8. How many percentage of chromium in SS304 & SS316
  • Ans. 

    SS304 contains 18% chromium and SS316 contains 16-18% chromium.

    • SS304 contains 18% chromium

    • SS316 contains 16-18% chromium

    • Chromium content in stainless steel enhances its corrosion resistance

  • Answered by AI
  • Q9. Which filler rod are used in SS304 and SS316
  • Ans. 

    ER308 and ER316 filler rods are commonly used in SS304 and SS316 respectively.

    • ER308 filler rod is used for welding SS304 stainless steel

    • ER316 filler rod is used for welding SS316 stainless steel

  • Answered by AI
  • Q10. What is A106 GRB
  • Ans. 

    A106 GRB is a specification for seamless carbon steel pipe for high-temperature service.

    • A106 GRB is a grade of seamless carbon steel pipe.

    • It is specifically designed for high-temperature service.

    • It is commonly used in industrial applications such as oil and gas processing.

    • A106 GRB pipes are known for their strength and durability.

  • Answered by AI
  • Q11. How many inches have you worked in the pipe
  • Ans. 

    I have worked on pipes ranging from 2 inches to 24 inches in diameter.

    • Worked on various pipe sizes including 2 inches, 4 inches, 6 inches, 8 inches, 12 inches, and 24 inches

    • Experience with both small and large diameter pipes

    • Skilled in handling different types of pipe materials such as PVC, steel, and copper

  • Answered by AI
  • Q12. Which filler and electrode used in P91
  • Ans. 

    Filler material: E9015-B9, Electrode: E9018-B9

    • Filler material for P91 is typically E9015-B9

    • Electrode used for welding P91 is usually E9018-B9

  • Answered by AI
  • Q13. What is a procedure of P91 during fittup and welding
  • Ans. 

    During fittup and welding of P91, preheating and post-weld heat treatment are crucial steps to prevent cracking and ensure proper weld quality.

    • Preheating of P91 material to a specific temperature range before welding to reduce the risk of cracking

    • Maintaining interpass temperature during welding to prevent rapid cooling and cracking

    • Post-weld heat treatment of the welded joint to relieve residual stresses and ensure prop...

  • Answered by AI
  • Q14. Which types of filller and electrode used in P5
  • Ans. 

    Filler metal and electrodes used in P5 are typically low alloy steel materials.

    • Filler metal: Low alloy steel filler metals are commonly used in welding P5 materials.

    • Electrodes: Low hydrogen electrodes are preferred for welding P5 due to their high strength and crack resistance.

    • Examples: ER80S-D2 filler metal, E8018-B2 electrode

  • Answered by AI
  • Q15. What is preheat Temperature and cycles
  • Ans. 

    Preheat temperature and cycles are important factors in mechanical engineering processes.

    • Preheat temperature refers to the temperature at which a material or component is heated before further processing.

    • Preheat cycles are the number of times a material or component is heated and cooled before the final processing step.

    • Preheating helps reduce thermal shock, improve weld quality, and prevent cracking in materials.

    • Exampl...

  • Answered by AI
  • Q16. What is postheat temperature and cycles
  • Ans. 

    Postheat temperature and cycles refer to the temperature and number of heating and cooling cycles applied to a material after welding to relieve stress and prevent cracking.

    • Postheat temperature is typically around 200-400 degrees Fahrenheit for carbon steels

    • Postheat cycles involve heating the material to the specified temperature and holding it for a specific amount of time before allowing it to cool slowly

    • Postheat tre...

  • Answered by AI
  • Q17. PWHT temperature and cycles
  • Q18. Where are usd and prefared to Concentric Reducer and ECC reducer
  • Ans. 

    Concentric reducers are preferred for cost-effective reduction in pipe size, while eccentric reducers are used when maintaining the same level is important.

    • Concentric reducers are used when the center lines of the larger and smaller pipes are to be aligned.

    • Eccentric reducers are used when maintaining the same level is important, such as in drainage systems.

    • Concentric reducers are more cost-effective compared to eccentr...

  • Answered by AI
  • Q19. Why should be used ECC reducer in pump suction line
  • Ans. 

    ECC reducer should be used in pump suction line to reduce turbulence and improve pump efficiency.

    • ECC reducer helps in reducing turbulence in the pump suction line

    • It helps in improving pump efficiency by reducing pressure drop

    • It prevents cavitation in the pump which can damage the pump over time

  • Answered by AI
  • Q20. What things need to be kept in mind while working in a confined space
  • Q21. How many volts of light are used in confined spaces
  • Ans. 

    The voltage of light used in confined spaces varies depending on the specific lighting fixture and safety regulations.

    • The voltage of light used in confined spaces can range from 12 volts for low voltage lighting to 120-277 volts for standard lighting fixtures.

    • In some cases, special low voltage lighting may be required for safety reasons in confined spaces.

    • It is important to follow safety regulations and guidelines when...

  • Answered by AI
  • Q22. What was the last project you did?
  • Ans. 

    I recently led a team in designing and implementing a new automated assembly line for a manufacturing company.

    • Managed a team of engineers and technicians to develop project timeline and budget

    • Designed layout of assembly line to optimize efficiency and productivity

    • Implemented automated machinery and conducted testing to ensure functionality

    • Collaborated with production staff to train on new equipment and processes

  • Answered by AI
  • Q23. What distance do you provide support in 1.5 inch line
  • Ans. 

    Support is typically provided up to 50 feet in a 1.5 inch line.

    • Support is usually provided every 6-8 feet in a 1.5 inch line to prevent sagging or stress on the line.

    • Support can be in the form of clamps, brackets, or hangers depending on the specific installation requirements.

    • Proper support ensures the line remains secure and stable, preventing leaks or damage.

    • For example, in a industrial setting, a 1.5 inch steam line...

  • Answered by AI
  • Q24. What is jsa. And why used
  • Ans. 

    JSA stands for Job Safety Analysis. It is used to identify and control hazards in the workplace.

    • JSA is a systematic process for identifying potential hazards in a job task or process.

    • It involves breaking down the task into steps, identifying potential hazards at each step, and implementing controls to mitigate those hazards.

    • JSA helps in preventing accidents and injuries by ensuring that workers are aware of the risks a...

  • Answered by AI
  • Q25. If any area providing the responsibility to you for piping then what should be taken 1st steps
  • Ans. 

    The first steps in taking responsibility for piping involve conducting a thorough assessment, creating a plan, and ensuring compliance with regulations.

    • Conduct a thorough assessment of the current piping system to identify any issues or areas for improvement

    • Create a detailed plan outlining the necessary steps to address any identified issues and improve the piping system

    • Ensure compliance with relevant regulations and s...

  • Answered by AI
  • Q26. How many inches of welding does a welder make in a shop and filed
  • Ans. 

    The amount of welding done by a welder in a shop and field varies depending on the project and requirements.

    • The amount of welding done by a welder can range from a few inches for small projects to several feet for larger projects.

    • In a shop setting, a welder may typically work on smaller pieces requiring less welding compared to field work which may involve larger structures.

    • Factors such as the type of welding process u...

  • Answered by AI
  • Q27. During MC you have installed control valve or not.
  • Q28. During piping febrication and Erection you have only prefared ISO or p&id
  • Q29. How to cross chek piping missing components
  • Ans. 

    To cross check piping missing components, use piping and instrumentation diagrams (P&IDs), conduct physical inspections, compare with design specifications, and use 3D modeling software.

    • Refer to piping and instrumentation diagrams (P&IDs) to identify all components in the piping system

    • Conduct physical inspections of the piping system to visually check for missing components

    • Compare the actual piping layout with the desi...

  • Answered by AI
  • Q30. Can S316 fittings be used in S304 or not
  • Ans. 

    Yes, S316 fittings can be used in S304 applications.

    • S316 fittings can be used in S304 applications due to their similar corrosion resistance properties.

    • Both S316 and S304 are austenitic stainless steels, so they are compatible for most applications.

    • However, it is important to consider the specific requirements of the application before using S316 fittings in S304 systems.

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical profile related questions working experience wise quality
Round 3 - HR 

(1 Question)

  • Q1. Document verification sallary bank statement sallary discussion
Round 4 - Behavioral 

(1 Question)

  • Q1. Know about you and work education femily and other
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer interview?
L&T Energy Hydrocarbon interview process usually has 1 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process are One-on-one Round.
What are the top questions asked in L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer interview?

Some of the top questions asked at the L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer interview -

  1. What is a role of LPD and HPV, why installation in l...read more
  2. Where are usd and prefared to Concentric Reducer and ECC redu...read more
  3. If any area providing the responsibility to you for piping then what should be ...read more

Tell us how to improve this page.

L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

L&T Energy Hydrocarbon Assistant Manager and Mechanical Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

5.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
726 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
328 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
253 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Piping Engineer
138 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
118 salaries
unlock blur

₹17 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview