I appeared for an interview in Jan 2025.
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
L&T Construction interview questions for designations
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
Get interview-ready with Top L&T Construction Interview Questions
Top trending discussions
posted on 28 Apr 2024
I appeared for an interview in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 25 Mar 2025
I appeared for an interview in Sep 2024, where I was asked the following questions.
Implementing cost-reduction strategies in construction can enhance efficiency and profitability while maintaining quality.
Conduct thorough project planning to identify potential cost overruns early.
Utilize value engineering to optimize project design and materials, such as using alternative materials that meet specifications but are less expensive.
Implement lean construction techniques to minimize waste and improve wor...
Effective logistics management in construction involves planning, coordination, and execution to ensure timely delivery of materials and resources.
Develop a detailed logistics plan that outlines the flow of materials from suppliers to the site.
Utilize project management software to track deliveries and manage schedules, ensuring timely arrival of materials.
Establish strong communication channels with suppliers and subc...
I implement proactive planning, regular monitoring, and effective communication to ensure timely project completion.
Develop a detailed project schedule with milestones to track progress.
Conduct regular site meetings to address issues and keep the team aligned.
Utilize project management software for real-time updates and resource allocation.
Establish clear communication channels with all stakeholders to facilitate quick...
Addressing labor payment issues requires clear communication, investigation, and prompt resolution to maintain trust and productivity.
Communicate with the affected laborers to understand their concerns and gather details about the payment issue.
Investigate the root cause of the payment issue, whether it's a clerical error, miscommunication, or a delay in processing.
Collaborate with the finance department to expedite th...
Proficient in AutoCAD, Microsoft Office, Project, and planning software; experienced with AI in operations.
AutoCAD: 5 years of experience in creating detailed construction drawings and plans.
Microsoft Office: Advanced skills in Excel for budgeting and data analysis; proficient in Word and PowerPoint for reports and presentations.
Microsoft Project: Used for scheduling and tracking project timelines, ensuring on-time del...
Effective coordination with MEP, quality control, billing, and planning ensures project success and client satisfaction.
Regular meetings with MEP teams to align on project specifications and timelines.
Implementing a shared project management tool for real-time updates on quality control checks.
Collaborating with billing departments to ensure accurate invoicing based on project milestones.
Engaging clients in planning se...
posted on 27 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Some of the top questions asked at the L&T Construction Construction Management interview for experienced candidates -
based on 2 interviews
1 Interview rounds
based on 88 reviews
Rating in categories
Assistant Manager
1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
706
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
491
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
469
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
327
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects