L1 Schedule for a project refers to the initial high-level schedule that outlines major milestones and activities.
L1 Schedule is a top-level schedule that provides an overview of the project timeline.
It includes major milestones, key deliverables, and high-level activities.
L1 Schedule helps in understanding the overall project timeline and dependencies.
It is usually created during the initial planning phase of a projec...
Project cost can be calculated by considering various parameters such as labor, materials, equipment, overheads, and contingency.
Labor cost: Calculate the total hours worked by each worker and multiply it by their hourly rate.
Material cost: Determine the quantity and cost of materials required for the project.
Equipment cost: Calculate the rental or purchase cost of equipment needed for the project.
Overhead cost: Includ...
Time study is a method used to determine the time required to perform a specific task or activity.
Time study involves observing and measuring the time taken by a worker to complete a task.
It helps in setting realistic time standards for tasks and improving productivity.
Time study can be conducted through direct observation, video recording, or using specialized software.
The data collected from time study is used for pr...
Top trending discussions
posted on 18 Sep 2024
I have over 10 years of experience in construction management, overseeing various projects from start to finish.
Managed multiple construction projects simultaneously
Coordinated with architects, engineers, and subcontractors
Ensured projects were completed on time and within budget
Implemented safety protocols and quality control measures
Handled project documentation and reporting
Led a team of construction professionals
My project in M.Tech focused on sustainable construction practices using recycled materials.
Researched various recycled materials suitable for construction
Conducted experiments to test the strength and durability of these materials
Developed guidelines for incorporating recycled materials in construction projects
Collaborated with industry professionals to implement sustainable practices
Presented findings at conferences
posted on 7 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
Timing punctuality,displain .
posted on 28 Apr 2024
I was interviewed in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 11 Feb 2024
The MR value of DBM with PMB is more than DBM with VG40.
MR value refers to the Marshall Stability value, which measures the strength and stability of an asphalt mix.
DBM stands for Dense Bituminous Macadam, VG40 and PMB are types of bitumen used in the mix.
DBM with PMB has a higher MR value compared to DBM with VG40 due to the improved properties of PMB.
PMB (Polymer Modified Bitumen) enhances the durability, flexibility...
posted on 26 Sep 2023
Questions upon aptitude.
Project details with cost.
posted on 22 Feb 2021
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 22 Jan 2025
I was interviewed in Dec 2024.
Which type work details explain
Which type responsibility in previous company.
posted on 19 Jan 2024
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
665
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
527
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
380
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
324
salaries
| ₹5 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA