Premium Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International

Compare button icon Compare button icon Compare
4.1

based on 3.5k Reviews

Filter interviews by

KEC International Assistant Manager Project Management Interview Questions and Answers

Updated 16 Oct 2023

KEC International Assistant Manager Project Management Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Technology,(NIT), Meghalaya and was interviewed before Oct 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

I was selected from campus drive, so have to attend all 4 stages.

Round 3 - Group Discussion 

Current issue of project acquisition in different areas in India.

Round 4 - Technical 

(2 Questions)

  • Q1. Related questions of my project and civil engineering.
  • Q2. About the mtech project.
Round 5 - HR 

(3 Questions)

  • Q1. Final round with HR.
  • Q2. About previous experience and salary.
  • Q3. Why there is gap between career.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be geniune with your answer. Always think practically.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI

Planning Manager Interview Questions & Answers

L&T Construction user image Pagidi Marri Yaswanth Kumar

posted on 11 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Mix of Maths and English of basics

Round 2 - Group Discussion 

Group discussion on general topic

Round 3 - One-on-one 

(2 Questions)

  • Q1. About your self
  • Q2. Some technical questions on academics and experience and projects undergone
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Planning skills and knowledge
Round 2 - Technical 

(2 Questions)

  • Q1. Experience in scheduling software
  • Ans. 

    I have extensive experience using scheduling software to create and manage project timelines.

    • Proficient in using popular scheduling software such as Microsoft Project, Primavera P6, and Asana

    • Ability to create detailed project schedules, allocate resources, and track progress

    • Experience in setting dependencies, milestones, and critical paths to ensure project timelines are met

    • Familiarity with Gantt charts and other sched

  • Answered by AI
  • Q2. Planning knowledge and technical
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day

Round 2 - Technical 

(1 Question)

  • Q1. Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the fire station road sector and share
Round 3 - Aptitude Test 

Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day

Interview Preparation Tips

Interview preparation tips for other job seekers - technical features description and share Karen comment using hai ma'am 566
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Planning inititation process.
  • Ans. 

    The planning initiation process involves defining the project scope, objectives, and deliverables.

    • Identify the need for planning

    • Define the project scope, objectives, and deliverables

    • Identify key stakeholders and their roles

    • Establish a project team

    • Develop a project charter or initiation document

    • Conduct a feasibility study

    • Identify risks and constraints

    • Define the planning timeline and milestones

  • Answered by AI
  • Q2. Scheduling process and details for consodering durations with reapect to productivity.
  • Ans. 

    The scheduling process involves considering durations in relation to productivity.

    • The scheduling process starts by identifying the tasks that need to be completed.

    • The duration of each task is estimated based on historical data or expert judgment.

    • Productivity levels are taken into account when determining the duration of tasks.

    • Factors such as employee skills, equipment availability, and potential bottlenecks are conside...

  • Answered by AI
  • Q3. General productivity norms Vs actual industry consoderation as per site.
  • Ans. 

    The productivity norms in planning management vary across industries and sites.

    • Productivity norms in planning management are specific to each industry and site.

    • These norms are determined based on factors such as the nature of work, resources available, and industry standards.

    • For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.

    • In the...

  • Answered by AI
  • Q4. Budgeting details - Direct and indirect cost
  • Q5. Trackers prepared for site tracking, schedule upgradation
  • Ans. 

    Trackers are prepared for site tracking and schedule upgradation.

    • Trackers are tools used to monitor and track progress on a site or project.

    • They help in keeping track of tasks, deadlines, and milestones.

    • Trackers can be in the form of spreadsheets, software, or project management tools.

    • They provide visibility into the status of various activities and help in identifying bottlenecks or delays.

    • Upgradation of schedules inv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary as explained by team members is not on time, 1 month salary will be credited in 45-60 days of every passed month.
Timings are not worthy as they have strict timings of 9:30 to 9:45 after that they will consider half day for the current day and salary will be deducted.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What are activities in toilet area
  • Ans. 

    Activities in toilet area include personal hygiene, using the toilet, and cleaning.

    • Personal hygiene activities such as washing hands, brushing teeth, and showering

    • Using the toilet for urination and defecation

    • Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash

    • Maintenance tasks like unclogging drains or fixing leaks

  • Answered by AI
  • Q2. How will you calculate %age of completion of project
  • Ans. 

    Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.

    • Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.

    • Alternatively, %age of completion can be determined by tracking completion of specific project milestones.

    • Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Plumbing work in wall and floor, wall plaster and then wall tile after that flooring
  • Ans. 

    The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.

    • Start by completing the plumbing work in the walls and floors

    • Next, apply wall plaster to smoothen the surface

    • Then, install wall tiles for a decorative finish

    • Finally, proceed with the flooring installation

  • Answered by AI
  • Q2. By EPC weightage %age
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me detail in how you plan PQC work

KEC International Interview FAQs

How many rounds are there in KEC International Assistant Manager Project Management interview?
KEC International interview process usually has 5 rounds. The most common rounds in the KEC International interview process are Aptitude Test, Group Discussion and Technical.
How to prepare for KEC International Assistant Manager Project Management interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management.
What are the top questions asked in KEC International Assistant Manager Project Management interview?

Some of the top questions asked at the KEC International Assistant Manager Project Management interview -

  1. Related questions of my project and civil engineeri...read more
  2. Final round with ...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 KEC International interview
Campus Placement
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Join KEC International Building Infrastructure for the World of Tomorrow

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 688 Interviews
Siemens Interview Questions
4.1
 • 419 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
ABB Interview Questions
4.1
 • 224 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
View all
KEC International Assistant Manager Project Management Salary
based on 31 salaries
₹7 L/yr - ₹18 L/yr
18% more than the average Assistant Manager Project Management Salary in India
View more details

KEC International Assistant Manager Project Management Reviews and Ratings

based on 15 reviews

3.7/5

Rating in categories

3.8

Skill development

2.5

Work-Life balance

3.2

Salary & Benefits

3.9

Job Security

3.3

Company culture

2.3

Promotions/Appraisal

2.9

Work Satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
766 salaries
unlock blur

₹5.2 L/yr - ₹20.5 L/yr

Senior Engineer
435 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
225 salaries
unlock blur

₹1 L/yr - ₹9.5 L/yr

Project Engineer
217 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Safety Officer
205 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview