I applied via campus placement at National Institute of Technology,(NIT), Meghalaya and was interviewed before Oct 2022. There were 5 interview rounds.
I was selected from campus drive, so have to attend all 4 stages.
Current issue of project acquisition in different areas in India.
posted on 31 Dec 2024
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
Steel consumption for overhead tanks varies based on capacity, design, and material thickness.
Steel consumption increases with larger tank capacities
Thicker steel material will require more consumption
Design factors such as reinforcements also impact steel usage
Grade of steel and cement refers to the quality and strength of the materials used in construction projects.
Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.
Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.
Grade of cement refers to its compressive strength and fineness.
Common grades of cement used in const...
Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.
DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.
They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.
DI pipes co...
Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove suspended particles
Sedimentation to settle out floc
Filtration to remove remaining particles
Disinfection with chlorine or other chemicals to kill bacteria and viruses
pH adjustment to ensure water is not too acidic or basic
Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.
Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms
There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination
Gas chlorination involves adding chlorine gas directly into the water supply
Liquid chlorination invo...
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 3 interview rounds.
I have extensive experience using scheduling software to create and manage project timelines.
Proficient in using popular scheduling software such as Microsoft Project, Primavera P6, and Asana
Ability to create detailed project schedules, allocate resources, and track progress
Experience in setting dependencies, milestones, and critical paths to ensure project timelines are met
Familiarity with Gantt charts and other sched
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
posted on 12 Aug 2024
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
posted on 17 Feb 2020
I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
posted on 11 Jun 2023
Already talked to you
based on 15 reviews
Rating in categories
Assistant Manager
766
salaries
| ₹5.2 L/yr - ₹20.5 L/yr |
Senior Engineer
435
salaries
| ₹4.3 L/yr - ₹13 L/yr |
Civil Engineer
225
salaries
| ₹1 L/yr - ₹9.5 L/yr |
Project Engineer
217
salaries
| ₹3 L/yr - ₹11 L/yr |
Safety Officer
205
salaries
| ₹2 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International