Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Technology,(NIT), Meghalaya and was interviewed before Oct 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

I was selected from campus drive, so have to attend all 4 stages.

Round 3 - Group Discussion 

Current issue of project acquisition in different areas in India.

Round 4 - Technical 

(2 Questions)

  • Q1. Related questions of my project and civil engineering.
  • Q2. About the mtech project.
Round 5 - HR 

(3 Questions)

  • Q1. Final round with HR.
  • Q2. About previous experience and salary.
  • Q3. Why there is gap between career.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be geniune with your answer. Always think practically.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Planning skills and knowledge
Round 2 - Technical 

(2 Questions)

  • Q1. Experience in scheduling software
  • Ans. 

    I have extensive experience using scheduling software to create and manage project timelines.

    • Proficient in using popular scheduling software such as Microsoft Project, Primavera P6, and Asana

    • Ability to create detailed project schedules, allocate resources, and track progress

    • Experience in setting dependencies, milestones, and critical paths to ensure project timelines are met

    • Familiarity with Gantt charts and other sched

  • Answered by AI
  • Q2. Planning knowledge and technical
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What are activities in toilet area
  • Ans. 

    Activities in toilet area include personal hygiene, using the toilet, and cleaning.

    • Personal hygiene activities such as washing hands, brushing teeth, and showering

    • Using the toilet for urination and defecation

    • Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash

    • Maintenance tasks like unclogging drains or fixing leaks

  • Answered by AI
  • Q2. How will you calculate %age of completion of project
  • Ans. 

    Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.

    • Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.

    • Alternatively, %age of completion can be determined by tracking completion of specific project milestones.

    • Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Plumbing work in wall and floor, wall plaster and then wall tile after that flooring
  • Ans. 

    The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.

    • Start by completing the plumbing work in the walls and floors

    • Next, apply wall plaster to smoothen the surface

    • Then, install wall tiles for a decorative finish

    • Finally, proceed with the flooring installation

  • Answered by AI
  • Q2. By EPC weightage %age
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me detail in how you plan PQC work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!

I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Introduction, Experience educational Background Technical qualification skiils etc.
Round 3 - HR 

(2 Questions)

  • Q1. Introduction, Experience, educational Background, Technical Skills and Salary etc.
  • Q2. Work life and communication about sa safety management, behaviourioal approche etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - A good educational Background, Experience, Technical qualification, skiils set in life which can improve your work life and communication systems etc.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about your self?
  • Q2. Full details regarding the past experience and related questions.
  • Q3. Elevated metro related questions
Round 3 - HR 

(3 Questions)

  • Q1. Designation discussion related with the experience?
  • Q2. Salary negotiation compare with past?
  • Q3. Reason for leaving the present organisation?

Interview Preparation Tips

Interview preparation tips for other job seekers - All the very best . Feel free and attend. And ask what are all doubts directly with the HR.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. For Education and Project details Questions
Round 3 - Technical 

(1 Question)

  • Q1. Project Related Questions Asking
Round 4 - HR 

(1 Question)

  • Q1. Location and Salary Discussion Questions

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Assistant Manager Project Management interview?
Kalpataru Projects International interview process usually has 1 rounds. The most common rounds in the Kalpataru Projects International interview process are Technical.
What are the top questions asked in Kalpataru Projects International Assistant Manager Project Management interview?

Some of the top questions asked at the Kalpataru Projects International Assistant Manager Project Management interview -

  1. Steel consumption of various capacities of over head t...read more
  2. Process of water treatment pl...read more
  3. Grade of steel and cem...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Kalpataru Projects International interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Siemens Interview Questions
4.1
 • 425 Interviews
Tata Projects Interview Questions
4.3
 • 400 Interviews
KEC International Interview Questions
4.1
 • 287 Interviews
Tata Technologies Interview Questions
3.7
 • 251 Interviews
ABB Interview Questions
4.1
 • 226 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
View all
12% less than the average Assistant Manager Project Management Salary in India
View more details

Kalpataru Projects International Assistant Manager Project Management Reviews and Ratings

based on 14 reviews

4.6/5

Rating in categories

4.2

Skill development

4.1

Work-Life balance

4.4

Salary & Benefits

4.6

Job Security

4.4

Company culture

3.7

Promotions/Appraisal

4.1

Work Satisfaction

Explore 14 Reviews and Ratings
Senior Engineer
615 salaries
unlock blur

₹3.4 L/yr - ₹11 L/yr

Deputy Manager
595 salaries
unlock blur

₹5.3 L/yr - ₹19.5 L/yr

Assistant Manager
518 salaries
unlock blur

₹3.8 L/yr - ₹14.8 L/yr

Manager
277 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Civil Engineer
253 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.8
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview