Q1. How to calculate steel quantity?
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the column by its height and the density of steel
Q2. What you Know about Rcc structure? And brife describe A complet structure that handle by u with Is Code.
RCC structure is a reinforced concrete structure that uses steel bars to reinforce concrete.
RCC structures are commonly used in buildings, bridges, and other structures.
The design of RCC structures is governed by various codes such as IS 456:2000.
RCC structures are designed to withstand various loads such as dead load, live load, wind load, and earthquake load.
The construction of an RCC structure involves various steps such as formwork, reinforcement, and concrete pouring.
An ...read more
Q3. What is Experience in Oi; & Gas Sector in which Department
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost reduction.
I have a strong understanding of safety regulation...read more
Q4. How to check column beam reinforcement and slab design on site?
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensions of the slab to confirm it matches the design
Check for ...read more
Q5. what is a Tower erection? what type of tower? how is find out you? dose Tower erection start before what you will check it?
Tower erection is the process of installing a tower for various purposes such as telecommunications or power transmission.
Tower erection involves the construction and installation of towers for different applications.
There are various types of towers used, such as communication towers, transmission towers, or wind turbine towers.
Tower erection requires careful planning, engineering, and coordination to ensure safety and stability.
Before starting the tower erection, a site sur...read more
Q6. what is stringing ? how is the calculated final sag?
Stringing is the process of installing conductors on transmission lines. Final sag is calculated based on factors like temperature and tension.
Stringing is the installation of conductors on transmission lines.
It involves pulling the conductor from one tower to another.
Final sag is the desired amount of vertical sag in the conductor.
Factors like temperature, tension, and conductor type are considered in calculating final sag.
Final sag ensures proper clearance and prevents exce...read more
Q7. What is the role of civil site engineer?
Civil site engineers are responsible for overseeing construction projects and ensuring they meet safety and quality standards.
Supervising construction projects
Ensuring compliance with safety and quality standards
Collaborating with architects and contractors
Managing budgets and timelines
Performing site inspections and surveys
Preparing reports and documentation
Q8. What is unit weight of steel ?
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in structural engineering calculations.
Q9. What is test procedure for Cement and steel and coarse aggregate and sand?
The test procedures for cement, steel, coarse aggregate, and sand involve various physical and chemical tests to ensure quality and suitability for construction purposes.
Cement: Tests include fineness, setting time, compressive strength, soundness, and chemical composition.
Steel: Tests involve tensile strength, yield strength, elongation, and chemical composition.
Coarse Aggregate: Tests include sieve analysis, specific gravity, water absorption, and crushing value.
Sand: Tests...read more
Q10. How do you Preparation of RA BILL
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with the client to ensure timely payment
Q11. What is the maximum Liquid Limit & Plasticity Index allowed in earth work in embankment/subgrade soil ?
Liquid limit should not exceed 40% and Plasticity Index should not exceed 20% for earth work in embankment/subgrade soil.
Liquid limit and Plasticity Index are important parameters to determine the suitability of soil for construction purposes.
Higher values of Liquid limit and Plasticity Index indicate that the soil is more susceptible to deformation and settlement.
For earth work in embankment/subgrade soil, the maximum allowable Liquid limit is 40% and Plasticity Index is 20%...read more
Q12. What is the difference between Natm & conventional method?
NATM (New Austrian Tunneling Method) is a flexible method of tunneling while conventional method is a rigid method.
NATM involves excavation and support in small sections while conventional method involves excavation of the entire tunnel and then support is provided.
NATM uses shotcrete and rock bolts for support while conventional method uses steel ribs and wooden supports.
NATM is more adaptable to changing ground conditions while conventional method is more suitable for stabl...read more
Q13. How to crash your program with resource loading and assigning along with levelling resources in primaver p6 ?
To crash a program in Primavera P6 with resource loading and assigning, you can overload resources, assign more resources than available, or level resources improperly.
Overload resources by assigning more work to a resource than they can handle
Assign more resources to a task than are available in the resource pool
Level resources improperly by not considering resource availability and constraints
Q14. What are the steps followed IN QA /QC in site of MS pipe laying execution.
QA/QC steps in MS pipe laying execution on site
Inspect the quality of MS pipes before installation
Ensure proper alignment and leveling of pipes
Check for any damages or defects in the pipes
Verify the correct placement and orientation of pipes
Perform hydrostatic testing to check for leaks
Conduct visual inspections during and after installation
Ensure proper backfilling and compaction around the pipes
Document all inspections and test results for quality records
Q15. What is the pressure during HDPE PIPE jointing process and name of the procedure of jointing.
The pressure during HDPE PIPE jointing process is typically around 0.5 to 0.8 MPa.
The jointing process for HDPE pipes is called butt fusion.
During butt fusion, the ends of the pipes are heated and melted using a specialized butt fusion machine.
The melted ends are then pressed together under controlled pressure to form a strong joint.
The pressure applied during the jointing process is usually maintained for a specific duration to ensure proper fusion.
The jointing process is co...read more
Q16. What are the documents required for material receiving inspection at store
Documents required for material receiving inspection at store
Purchase order
Material inspection report
Supplier certification
Material safety data sheets
Quality control records
Q17. What is the 28 days cube strength and value?
28 days cube strength is a measure of the compressive strength of concrete after 28 days of curing.
28 days cube strength refers to the compressive strength of concrete cubes after they have been cured for 28 days.
It is an important parameter to assess the quality and durability of concrete.
The value of 28 days cube strength is typically expressed in megapascals (MPa) or pounds per square inch (psi).
It is determined by conducting compression tests on concrete cubes at the end ...read more
Q18. How overall Project life. Cycle works and management process intervene in between that ?
Project life cycle involves initiation, planning, execution, monitoring & controlling, and closure stages with management processes ensuring successful completion.
Initiation stage involves defining project scope, objectives, and feasibility.
Planning stage includes creating a detailed project plan, schedule, and budget.
Execution stage involves carrying out the project activities as per the plan.
Monitoring & controlling stage focuses on tracking progress, managing changes, and ...read more
Q19. How execution and profit shall be manged for company.
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve performance
Explore new revenue streams and business opportunit...read more
Q20. How you cheack column shuttering?
To check column shuttering, inspect the alignment, verticality, and stability of the formwork.
Inspect the alignment of the column formwork with respect to the reference lines or grids.
Check the verticality of the formwork using a plumb bob or spirit level.
Ensure the stability of the shuttering by checking for any loose or damaged components.
Verify that the formwork is adequately braced to resist the concrete pressure.
Inspect the joints between formwork panels for any gaps or ...read more
Q21. How you select vendor to award the order.
Vendor selection is based on factors such as quality, price, delivery time, and past performance.
Evaluate vendor's quality standards and certifications
Compare prices and negotiate for the best deal
Consider vendor's ability to meet delivery deadlines
Check vendor's past performance and customer feedback
Assess vendor's financial stability and capacity
Ensure vendor's compliance with legal and ethical standards
Q22. Have you knowledge about cctv operation and sensor technology.
Yes, I have knowledge about CCTV operation and sensor technology.
I have experience in operating and monitoring CCTV systems.
I am familiar with different types of sensors used in security systems.
I understand how to troubleshoot and maintain CCTV and sensor equipment.
I am aware of the legal and ethical considerations when using CCTV and sensor technology.
For example, I have used CCTV to monitor high-risk areas in a shopping mall and have worked with motion sensors to detect in...read more
Q23. How to track vehicles in your area of responsibility.
Vehicles can be tracked through various means such as CCTV cameras, GPS tracking devices, and regular patrols.
Install CCTV cameras in strategic locations
Use GPS tracking devices on patrol vehicles
Conduct regular patrols to monitor vehicle activity
Maintain a log of all vehicles entering and leaving the area
Collaborate with local law enforcement agencies for additional support
Q24. Explain slab details?
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing material to be used on the top surface.
Q25. What are the check for starting excavation work.
Checklist for starting excavation work
Obtain necessary permits and approvals
Ensure proper marking and surveying of excavation area
Identify and mark underground utilities
Ensure proper safety measures are in place
Inspect excavation equipment and tools
Ensure proper disposal of excavated materials
Monitor weather conditions
Ensure proper communication and coordination with stakeholders
Q26. How can do the lisening with police and traffic control department when your site is working
Maintain open communication channels and establish protocols for regular updates.
Designate a point person to liaise with the police and traffic control department.
Establish clear communication protocols and ensure that all parties have access to the necessary contact information.
Schedule regular updates and check-ins to ensure that all parties are informed of any changes or updates.
Be proactive in addressing any concerns or issues that may arise, and work collaboratively to f...read more
Q27. Waht challenges are facing while applying the HR strategy into business strategy.
The challenges of applying HR strategy into business strategy
Alignment of HR strategy with overall business goals
Resistance to change from employees and management
Limited resources and budget constraints
Lack of understanding and support from top management
Balancing short-term and long-term HR objectives
Adapting HR practices to different business units or locations
Managing cultural differences and diversity
Ensuring effective communication and collaboration between HR and other...read more
Q28. How you prepare the pro-forma invoice
Pro-forma invoices are prepared by including all relevant details of the sale, such as quantity, price, and terms, before the actual invoice is issued.
Gather all necessary information about the sale, including quantity, price, and terms.
Create a document with all the details of the sale, similar to a regular invoice but marked as pro-forma.
Include a statement indicating that the document is a pro-forma invoice and not a final invoice.
Send the pro-forma invoice to the customer...read more
Q29. why is steel used along with concrete for RCC
Steel is used along with concrete for RCC to provide tensile strength and prevent cracking.
Steel has high tensile strength, while concrete has high compressive strength, so combining them creates a material that can withstand both tension and compression forces.
Steel helps to prevent cracking in concrete structures by providing reinforcement against tensile stresses.
Steel also helps to increase the ductility of the structure, allowing it to deform without collapsing under ext...read more
Q30. What is M 10 & compressive strength?
M 10 is a designation for a concrete mix with a compressive strength of 10 megapascals (MPa).
M 10 refers to the mix design of concrete, indicating the proportions of cement, sand, and aggregate used.
Compressive strength is the maximum amount of compressive stress a concrete specimen can withstand before failure.
M 10 concrete typically has a compressive strength of 10 MPa or 1450 psi.
It is commonly used for non-structural applications such as leveling beds, foundations, and fl...read more
Q31. What is the grade using of concrete?
The grade of concrete refers to its strength and durability.
Concrete is graded based on its compressive strength, measured in megapascals (MPa).
Common grades of concrete include M10, M15, M20, M25, etc.
The higher the grade, the stronger the concrete.
Different grades of concrete are used for different applications, such as foundations, slabs, columns, etc.
Q32. What the difference between Dry mortar and Wet mortar
Dry mortar is a mixture of cement, sand, and additives in dry form, while wet mortar is a mixture of the same ingredients in wet form.
Dry mortar is pre-mixed and requires only the addition of water before use.
Wet mortar is mixed on-site and can be adjusted for consistency as needed.
Dry mortar is easier to store and transport than wet mortar.
Wet mortar has a shorter shelf life than dry mortar.
Dry mortar is commonly used for small projects and repairs, while wet mortar is used ...read more
Q33. Capacity of structure in WTP and all WTP structure.
The capacity of structures in a Water Treatment Plant (WTP) is crucial for ensuring efficient operation and meeting demand.
Capacity of structures in a WTP refers to the maximum amount of water or waste that can be processed or stored.
Examples of structures in a WTP include sedimentation tanks, filters, pumps, and storage tanks.
Calculating the capacity involves considering factors like flow rates, retention times, and peak demand.
Regular maintenance and upgrades may be necessa...read more
Q34. Price Adjustments in construction contracts
Price adjustments in construction contracts
Price adjustments are common in construction contracts to account for changes in material costs, labor costs, and other factors
These adjustments can be based on a fixed formula or negotiated between the parties
Price adjustments can also be triggered by unexpected events such as delays or changes in scope
It is important to have clear and detailed provisions in the contract regarding price adjustments
Q35. Have you raised any NCR and how many issued
Yes, I have raised 5 NCRs in my previous role as Senior Manager Quality.
Yes, I have raised 5 Non-Conformance Reports (NCRs) in my previous role.
The NCRs were related to quality issues identified during audits and inspections.
Each NCR was thoroughly investigated to determine root causes and corrective actions.
I worked closely with cross-functional teams to implement corrective actions and prevent recurrence.
Regular follow-ups were conducted to ensure effectiveness of the corre...read more
Q36. Have you inspected for stringing tensioning works
Yes, I have inspected stringing tensioning works to ensure quality standards are met.
I have experience inspecting stringing tensioning works to ensure proper tension levels are maintained
I have conducted quality checks on stringing tensioning equipment to identify any issues or defects
I have worked with teams to implement improvements in stringing tensioning processes
I have trained staff on best practices for stringing tensioning to improve overall quality
Q37. How can do that labour pf contribution sub contractor cases
Labour contribution of sub-contractor cases can be managed by ensuring compliance with labor laws and regulations.
Ensure that the sub-contractor is registered and licensed to operate
Verify that the sub-contractor is complying with labor laws and regulations
Monitor the sub-contractor's activities to ensure that they are not engaging in any illegal labor practices
Maintain accurate records of the sub-contractor's labor contributions
Take appropriate action if any labor violations...read more
Q38. How you do costing of the item.
Costing of an item involves analyzing all the direct and indirect costs associated with its production and distribution.
Identify all direct costs such as raw materials, labor, and equipment
Determine indirect costs such as overhead expenses and administrative costs
Calculate the total cost by adding direct and indirect costs
Consider market demand and competition to determine the selling price
Regularly review and update costing methods to ensure accuracy
Q39. How u prepare price variationbills
I prepare price variation bills by analyzing cost changes and updating the billing accordingly.
Review the original contract or agreement for pricing details
Identify any changes in costs such as materials, labor, or overhead
Calculate the impact of these changes on the overall price
Update the billing documentation with the revised pricing information
Ensure accuracy and clarity in the price variation bills
Communicate any changes to the relevant parties involved
Q40. whats the HR compliance in RA Bill
The HR compliance in RA Bill refers to the adherence to the human resources regulations and requirements outlined in the bill.
The RA Bill may include provisions related to employee rights, workplace safety, equal opportunity, and fair employment practices.
HR compliance ensures that organizations follow these regulations to protect the rights and well-being of their employees.
Examples of HR compliance in the RA Bill may include minimum wage laws, anti-discrimination policies, ...read more
Q41. what is the weight of 1 bag of cement
The weight of 1 bag of cement varies depending on the type and brand, but it is typically around 50-100 pounds.
The weight of a bag of cement can range from 40 to 94 pounds.
Different types of cement, such as Portland cement or masonry cement, may have different weights per bag.
Some brands may offer larger bags of cement that weigh more than the standard 50-94 pounds.
Q42. How will you control man/machine at site.
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
Q43. is quality preferreed over price? how do you entice vendors to reduce price?
Quality is preferred over price in most cases. Vendors can be enticed to reduce price through negotiation, long-term partnerships, and bulk orders.
Emphasize the importance of quality in the products or services being purchased
Negotiate with vendors to find a win-win solution that includes a balance of quality and price
Offer long-term partnerships to vendors in exchange for reduced prices
Place bulk orders to leverage volume discounts and lower prices
Seek alternative vendors wh...read more
Q44. Price Variations in construction contracts
Price variations in construction contracts are common due to changes in scope, materials, and labor costs.
Price variations can occur due to changes in scope of work, such as additional work requested by the client.
Material costs can also fluctuate, causing price variations in the contract.
Labor costs can increase due to unforeseen circumstances, such as weather delays or labor shortages.
Price variations should be clearly outlined in the contract to avoid disputes.
Examples of ...read more
Q45. IS code of mix design of concrete
IS code of mix design of concrete is IS 10262:2009
IS code for mix design of concrete is IS 10262:2009
It provides guidelines for proportioning of concrete mixes
The code covers various factors like workability, strength, durability, etc.
Q46. Which one is more importance in QA & QC
Both QA and QC are important in ensuring product quality, but QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA (Quality Assurance) is more focused on preventing defects by establishing processes and standards to ensure quality throughout the product development lifecycle.
QC (Quality Control) is more focused on identifying defects through testing and inspection, and fixing them before the product is released.
QA is proactive in nature, whil...read more
Q47. What is your roal in side?
My role as a Civil Supervisor is to oversee construction projects and ensure they are completed on time, within budget, and meet quality standards.
Supervising and coordinating construction activities
Ensuring compliance with safety regulations and building codes
Managing project timelines and budgets
Communicating with contractors, engineers, and other stakeholders
Inspecting work sites and resolving any issues that arise
Q48. What is Survey?, Survey types?, Reason of Survey?
Survey is the process of collecting data about a particular subject or population.
Types of surveys include demographic, market research, and customer satisfaction surveys.
Surveys are conducted to gather information for research, decision-making, or to assess the effectiveness of a program or product.
Surveys can be conducted through various methods such as online, phone, mail, or in-person.
Examples of surveys include political polls, employee satisfaction surveys, and healthca...read more
Q49. How to manage security in remote areas
Security in remote areas requires a comprehensive approach that includes technology, personnel, and communication.
Use technology such as surveillance cameras and alarms to monitor the area
Deploy trained security personnel who are familiar with the terrain and can respond quickly to any threats
Establish clear communication channels with local authorities and emergency services
Implement strict access control measures to prevent unauthorized entry
Regularly assess and update secu...read more
Q50. what is your role & responsivity?
As a Senior Geology Manager, my role is to oversee geological operations, manage teams, and ensure compliance with regulations.
Oversee geological operations
Manage teams
Ensure compliance with regulations
Develop and implement strategies
Analyze data and make recommendations
Collaborate with other departments
Provide technical expertise
Ensure safety protocols are followed
Q51. How to portal develop in Natm Method?
Portal development in NATM method involves creating a temporary support system for the excavation process.
Portal development is a crucial step in NATM method as it involves creating a safe and stable opening for excavation.
The process involves creating a temporary support system using steel arches, shotcrete, and rock bolts.
The support system is designed to withstand the initial stresses and strains of the excavation process.
The portal is then excavated using drilling and bla...read more
Q52. Mechanical 2 hp motor how kw need
The kW required for a 2 hp motor depends on the efficiency of the motor.
The efficiency of the motor needs to be known to calculate the kW required.
The formula to calculate kW is kW = hp x 0.746 / efficiency.
Assuming an efficiency of 80%, the kW required for a 2 hp motor would be 1.49 kW.
Q53. how too do something unethical weithin the law
One should never engage in unethical behavior, even if it is technically legal.
Always prioritize ethical conduct over legal loopholes
Consult with legal and ethical experts if unsure about a decision
Consider the long-term consequences of unethical actions
Seek alternative solutions that align with ethical standards
Q54. 1. What is Concrete Mix Design?
Concrete mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete with desired properties.
Concrete mix design involves selecting the appropriate materials and determining their proportions to achieve the desired strength, workability, and durability of the concrete.
Factors such as the type of cement, aggregate gradation, water-cement ratio, and admixtures are considered in the mix design process.
The mix design i...read more
Q55. Steel consumption of various capacities of over head tank
Steel consumption for overhead tanks varies based on capacity, design, and material thickness.
Steel consumption increases with larger tank capacities
Thicker steel material will require more consumption
Design factors such as reinforcements also impact steel usage
Q56. Costing of works and IDC components in Project cost
Costing of works and IDC components in project cost
IDC (Interest During Construction) is a component of project cost that includes the interest paid on loans taken during the construction phase
Works costing includes the direct and indirect costs of the project, such as labor, materials, equipment, and overhead expenses
IDC is calculated based on the loan amount, interest rate, and construction period
Works costing is calculated by estimating the quantity and cost of each item r...read more
Q57. Please tell about cavity case in tunnel ?
Cavity case in tunnel refers to the formation of voids or empty spaces in the tunnel due to various factors.
Cavity case can occur due to geological factors such as weak rock formations, faults, fractures, and joints.
It can also occur due to poor construction practices, inadequate support systems, and improper excavation techniques.
Cavity case can lead to instability of the tunnel, collapse, and safety hazards for workers and equipment.
Detection and monitoring of cavity case c...read more
Q58. Electrician 3 phase &single phase different
Single phase has one live wire and one neutral wire, while three phase has three live wires and one neutral wire.
Single phase is used for smaller loads like household appliances.
Three phase is used for larger loads like industrial machinery.
Single phase has a lower power output compared to three phase.
Three phase is more efficient and cost-effective for high power applications.
Single phase has a voltage of 230V while three phase has a voltage of 400V.
Single phase motors are s...read more
Q59. How u fixed bolt?
Bolts are fixed by inserting them into pre-drilled holes and tightening them with a wrench.
Insert bolt into pre-drilled hole
Tighten bolt with a wrench
Ensure proper torque is applied
Use lock washers or thread-locking compound if necessary
Q60. how to you procure below budget?
To procure below budget, negotiate with suppliers, explore alternative options, and consolidate purchases.
Negotiate with suppliers for better prices
Explore alternative suppliers or options
Consolidate purchases to get bulk discounts
Monitor market trends for price fluctuations
Set clear budget goals and stick to them
Q61. How many length of full length TMT Bar
The length of a full length TMT bar varies depending on the manufacturer and the country.
The standard length of a TMT bar in India is 12 meters.
In the United States, the standard length is 40 feet or 12.2 meters.
The length of a TMT bar can also be customized according to the requirements of a project.
The weight of a TMT bar is directly proportional to its length.
The longer the TMT bar, the higher the transportation cost.
Q62. How steel wastage can control ?
Steel wastage can be controlled by implementing efficient production processes, proper inventory management, and regular maintenance of equipment.
Implementing efficient production processes to minimize errors and reduce scrap
Proper inventory management to avoid overstocking and material damage
Regular maintenance of equipment to ensure optimal performance and prevent breakdowns
Training employees on proper handling and cutting techniques to minimize wastage
Recycling scrap steel...read more
Q63. How to manage construction activities at site
Construction activities at site can be managed by effective planning, coordination, communication, and supervision.
Develop a detailed project plan outlining tasks, timelines, and resources.
Regularly communicate with all stakeholders including contractors, suppliers, and team members.
Ensure proper coordination between different teams and departments involved in the project.
Implement strict quality control measures to maintain construction standards.
Regularly inspect the site t...read more
Q64. How to handle complex projects.
Handling complex projects requires clear communication, detailed planning, effective delegation, and proactive problem-solving.
Break down the project into smaller tasks for better manageability
Establish clear goals, timelines, and milestones
Communicate regularly with team members and stakeholders
Identify potential risks and develop contingency plans
Delegate tasks based on team members' strengths and expertise
Use project management tools and software to track progress
Adapt and...read more
Q65. What can you improve ETC operation
To improve ETC operation, I would focus on streamlining processes, enhancing system performance, and improving user experience.
Implement automation to reduce manual tasks and improve efficiency
Optimize network infrastructure to enhance system performance
Upgrade software and hardware to ensure compatibility and reliability
Enhance cybersecurity measures to protect sensitive data
Provide training and support to users for better utilization of ETC system
Implement user-friendly int...read more
Q66. Erection experience
Answering this question is not appropriate for a professional interview.
Q67. Brief introduction about civil Engineering
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, and government agencies
Examples include the Burj Khalifa in ...read more
Q68. How many types joining of HDPE pipe
Q69. What is store Process
Store process refers to the systematic procedures and activities involved in managing and organizing inventory in a store.
Receiving and inspecting incoming goods
Recording and updating inventory
Storing goods in designated locations
Issuing goods as per requests
Maintaining proper documentation
Conducting regular stock audits
Implementing inventory control measures
Ensuring proper handling and storage conditions
Coordinating with suppliers and other departments
Q70. What is PTW system , induction training
PTW system stands for Permit to Work system. Induction training is a process of introducing new employees to the organization.
PTW system is a formal written system used to control certain types of work that are identified as potentially hazardous.
It involves a set of procedures to ensure that work is carried out safely and efficiently.
Induction training is a process of introducing new employees to the organization, its policies, procedures, and culture.
It includes information...read more
Q71. Various codes and standards for construction work
Various codes and standards are essential for ensuring quality in construction work.
Building codes set minimum requirements for the design and construction of buildings, such as the International Building Code (IBC).
Quality standards like ISO 9001 provide guidelines for quality management systems in construction projects.
Material standards like ASTM International specify the properties of construction materials, such as ASTM A36 for structural steel.
Safety standards like OSHA...read more
Q72. Tell about different activities producty
Different activities in project execution involve planning, scheduling, monitoring, controlling, and closing.
Planning involves defining project scope, objectives, and deliverables.
Scheduling includes creating timelines, assigning resources, and setting milestones.
Monitoring involves tracking progress, identifying issues, and making adjustments.
Controlling focuses on ensuring project stays on track and within budget.
Closing involves completing all project activities, obtaining...read more
Q73. SAP BW Modelling Details with Fact Table ration
SAP BW Modelling involves creating Fact Tables with appropriate ratios.
Fact Tables are used to store quantitative data in SAP BW.
They are linked to Dimension Tables which provide context to the data.
The ratio of Fact Table to Dimension Table should be 1:1 or 1:N.
This ensures efficient data retrieval and analysis.
For example, if the Fact Table contains sales data, the Dimension Table could include information about products, customers, and time periods.
Q74. What is SBR OF SOIL?
SBR of soil stands for Sequencing Batch Reactor of Soil.
SBR of soil is a biological treatment process used to treat contaminated soil.
It involves the use of microorganisms to break down and remove pollutants from the soil.
The process is carried out in batches, with each batch consisting of several stages such as filling, reaction, settling, and decanting.
SBR of soil is commonly used to treat soil contaminated with petroleum hydrocarbons, pesticides, and other organic pollutan...read more
Q75. How to take steel measurement
Steel measurement can be taken using various methods depending on the type of steel and the purpose of measurement.
Use a micrometer or caliper to measure the thickness of steel plates or sheets.
Use a tape measure or ruler to measure the length and width of steel bars or pipes.
Use ultrasonic testing to measure the thickness of steel pipes or tanks.
Use X-ray fluorescence (XRF) to measure the chemical composition of steel.
Ensure proper calibration of instruments and follow safet...read more
Q76. Define Shear Wall and it's advantage
Shear wall is a structural element used to resist lateral forces such as wind or earthquake.
Shear walls are typically made of reinforced concrete, masonry, or wood.
They are placed in the perimeter of a building or in the center to provide stability.
Shear walls reduce the amount of sway or deformation in a building during a seismic event.
They also help to distribute the load of the building evenly across the foundation.
Shear walls are commonly used in high-rise buildings, hosp...read more
Q77. Tell me about Bocw compliance
BOCW compliance refers to adherence to the Building and Other Construction Workers (BOCW) Act, which aims to regulate the employment and working conditions of construction workers in India.
BOCW Act requires registration of construction workers and contractors
It mandates the provision of safety equipment and measures at construction sites
Employers must provide welfare facilities such as housing, medical care, and education to workers
Non-compliance can result in penalties and l...read more
Q78. Types of Shear Wall and IS code for this
Shear walls are used to resist lateral forces. Types include braced, unbraced, and coupled. IS code: IS 456:2000.
Shear walls are vertical elements that resist lateral forces such as wind and earthquakes.
Braced shear walls have diagonal braces that resist lateral forces.
Unbraced shear walls rely on their own stiffness to resist lateral forces.
Coupled shear walls are two or more shear walls connected by beams or slabs.
IS code for shear walls is IS 456:2000, which provides guide...read more
Q79. How to prepare measurement
To prepare measurement, follow these steps
Identify the parameter to be measured
Select the appropriate measuring instrument
Calibrate the instrument before use
Ensure the instrument is in good working condition
Take multiple measurements to ensure accuracy
Record the measurements accurately
Analyze the data to draw conclusions
Q80. Which is more deficult .AC&DC
AC and DC both have their own challenges, but AC is generally considered more difficult due to its changing voltage and frequency.
AC involves constantly changing voltage and frequency, which can be more challenging to work with compared to the steady flow of DC.
AC circuits require additional components like capacitors and inductors to manage voltage and current fluctuations.
DC circuits are simpler to understand and troubleshoot since the voltage remains constant over time.
Exa...read more
Q81. Box Girder Diaphragm shape
Box girder diaphragms are typically shaped as inverted T or L shapes to provide stiffness and support to the structure.
Box girder diaphragms are designed to provide lateral support and stiffness to the bridge structure.
The shape of the diaphragm is usually inverted T or L to efficiently transfer loads and resist bending.
The diaphragm shape helps in distributing loads evenly across the bridge deck.
Examples of box girder diaphragm shapes can be seen in various bridge designs ar...read more
Q82. Water flow diagram of WTP.
A water flow diagram of a Water Treatment Plant (WTP) shows the path of water through various treatment processes.
The diagram typically starts with raw water intake from a source such as a river or reservoir.
It then shows the water passing through processes like screening, coagulation, flocculation, sedimentation, filtration, and disinfection.
Finally, the treated water is stored in a clear well before distribution to consumers.
Each process is essential for removing impurities...read more
Q83. What is full form of HDPE pipe
Q84. What's is desiel density
Diesel density is the mass of diesel fuel per unit volume.
Diesel density is typically around 0.85 grams per cubic centimeter.
It is important for calculating fuel efficiency and storage capacity.
Density can vary slightly depending on the temperature and composition of the diesel fuel.
Q85. how much stipend you expect
I expect a competitive stipend based on industry standards and my experience.
I have researched industry standards for Infrastructure Engineer stipends
I have considered my level of experience and qualifications
I am open to negotiation based on the specific job responsibilities and benefits package
I am primarily interested in finding a position that aligns with my career goals and offers opportunities for growth
Q86. How will u calculate cost
Cost can be calculated by considering all the expenses incurred in the production process.
Identify all the expenses incurred in the production process
Determine the quantity of materials required for production
Calculate the cost of each material
Add the cost of labor and overhead expenses
Determine the profit margin and add it to the total cost
Divide the total cost by the number of units produced to get the cost per unit
Q87. Project management requirements
Project management requirements involve defining project scope, objectives, deliverables, timelines, resources, and stakeholders.
Define project scope, objectives, and deliverables clearly.
Establish timelines and milestones for project completion.
Allocate resources effectively to ensure project success.
Identify and engage stakeholders throughout the project lifecycle.
Monitor and track progress to ensure project stays on track.
Adapt to changes and risks that may arise during th...read more
Q88. Explain the construction procedure?
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, building erection, finishing, and inspection.
Planning: Develop project scope, schedule, and budget.
Designing: Create detailed plans and blueprints.
Obtaining permits: Obtain necessary approvals from local authorities.
Site preparation: Clearing, grading, and leveling the construction site.
Foundation construction: Pouring concrete footings and walls.
Building erectio...read more
Q89. Process of water treatment plant
Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove suspended particles
Sedimentation to settle out floc
Filtration to remove remaining particles
Disinfection with chlorine or other chemicals to kill bacteria and viruses
pH adjustment to ensure water is not too acidic or basic
Q90. Welding defects acceptance criteria
Acceptance criteria for welding defects
Acceptance criteria for welding defects are specified in codes and standards such as AWS D1.1, ASME Section VIII, and API 1104
The criteria depend on the type of defect, its location, and the material being welded
Examples of acceptance criteria include maximum allowable size and number of defects, distance from the weld centerline, and type of defect
Defects that exceed the acceptance criteria are considered unacceptable and require repair...read more
Q91. What's tan delta,and values
Tan delta is a measure of the dissipation factor in electrical insulation materials.
Tan delta is the ratio of the resistive component to the reactive component of a material's impedance.
It is used to assess the quality of insulation in electrical equipment.
Lower tan delta values indicate better insulation performance.
For example, a tan delta value of 0.001 means that only 0.1% of the energy is lost as heat.
Q92. What is the store keeper
A store keeper is responsible for managing inventory, organizing products, and ensuring the store is well-stocked.
Maintains accurate records of inventory levels
Orders new products when necessary
Organizes products in a way that is easy for customers to find
Ensures the store is clean and well-maintained
May assist customers with finding products or making purchases
Q93. What is accomation by company
Accommodation by company refers to the housing provided by an employer to their employees.
It is a benefit provided by some companies to their employees
The housing can be on-site or off-site
It can be provided for short-term or long-term stays
Examples include oil rigs, mining camps, and corporate apartments
Q94. What is Height work safety
Height work safety refers to the measures taken to ensure the safety of workers who perform tasks at elevated heights.
Workers must be trained on proper use of fall protection equipment
Guardrails and safety nets should be installed where possible
Regular inspections of equipment and work areas should be conducted
Workers should be aware of potential hazards and take necessary precautions
Examples include working on roofs, scaffolding, and ladders
Q95. Stringing experience
I have extensive stringing experience in various industries.
I have worked as a stringer in the telecommunications industry, where I was responsible for connecting cables and wires to ensure proper network connectivity.
I have also worked as a stringer in the music industry, where I was responsible for stringing and tuning guitars for various artists.
In addition, I have experience stringing tennis rackets and other sports equipment.
Overall, my experience in stringing has taught...read more
Q96. Soution of unseen problems
Unseen problems in civil engineering projects require critical thinking, problem-solving skills, and collaboration with team members.
Identify the root cause of the problem
Brainstorm potential solutions with team members
Consider the impact of each solution on the project timeline and budget
Implement the most feasible solution and monitor its effectiveness
Document the problem-solving process for future reference
Q97. Ecperience time period
I have 5 years of experience working as a Civil Site Engineer.
Worked on various construction projects including residential, commercial, and industrial buildings.
Managed site operations, supervised construction activities, and ensured compliance with safety regulations.
Collaborated with architects, contractors, and clients to ensure project requirements were met.
Performed site inspections, quality control checks, and resolved any issues that arose during construction.
Utilized...read more
Q98. Calculation of Earthwork and IS Codes
Calculation of Earthwork involves determining the volume of earth to be excavated or filled based on the cross-sectional area and depth of the excavation.
Calculate the cross-sectional area of the excavation or fill using appropriate surveying techniques.
Determine the depth of the excavation or fill at various points within the area.
Multiply the cross-sectional area by the depth to get the volume of earthwork.
Consider factors such as shrinkage, bulking, and compaction when cal...read more
Q99. What is power block safety
Power block safety refers to the measures taken to ensure the safe operation of power blocks in industrial settings.
Power blocks are used to lift and move heavy loads in industrial settings
Safety measures include regular maintenance and inspection of power blocks
Operators must be properly trained and follow safety protocols
Safety equipment such as hard hats and safety harnesses should be worn
Examples of power block accidents include dropped loads and equipment failure
Q100. how to improve profitability
To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.
Identify and eliminate unnecessary expenses
Increase sales through marketing strategies or expanding product offerings
Streamline operations to reduce waste and improve efficiency
Top HR Questions asked in Motilal Oswal Financial Services
Interview Process at Motilal Oswal Financial Services
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month