DGM-Projects Interview Questions and Answers

Updated 20 Apr 2024

Popular Companies

search-icon

Q1. How to calculate dry cost of Projects

Ans.

The dry cost of a project can be calculated by subtracting the cost of materials and equipment from the total project cost.

  • Determine the total project cost by adding up all the expenses, including labor, materials, equipment, and overhead costs.

  • Identify the cost of materials and equipment used in the project.

  • Subtract the cost of materials and equipment from the total project cost to obtain the dry cost.

  • Dry cost = Total project cost - Cost of materials and equipment.

Q2. What is rolling margin of steel

Ans.

Rolling margin of steel refers to the difference between the initial thickness of a steel plate and its final thickness after undergoing the rolling process.

  • Rolling margin is a measure of the reduction in thickness that occurs during the rolling process.

  • It is calculated by subtracting the final thickness of the steel plate from its initial thickness.

  • The rolling margin is influenced by factors such as the type of steel, rolling temperature, and rolling speed.

  • A higher rolling m...read more

Q3. How to manage construction activities at site

Ans.

Construction activities at site can be managed by effective planning, coordination, communication, and supervision.

  • Develop a detailed project plan outlining tasks, timelines, and resources.

  • Regularly communicate with all stakeholders including contractors, suppliers, and team members.

  • Ensure proper coordination between different teams and departments involved in the project.

  • Implement strict quality control measures to maintain construction standards.

  • Regularly inspect the site t...read more

Q4. Project details and types of quality tests

Ans.

Quality tests are conducted at various stages of the project to ensure the deliverables meet the required standards.

  • Quality tests are conducted during the planning, execution, and closure phases of the project.

  • Types of quality tests include functional testing, performance testing, security testing, and user acceptance testing.

  • Quality tests are also conducted on project documentation to ensure accuracy and completeness.

  • Quality tests are important to ensure customer satisfactio...read more

Are these interview questions helpful?

Q5. Rolling Margin and its affect in Budget

Ans.

Rolling margin is the difference between actual and budgeted costs over a period of time.

  • Rolling margin helps in identifying cost overruns or savings over a period of time.

  • It helps in adjusting the budget for future periods based on the rolling margin trend.

  • For example, if the rolling margin is consistently negative, it may indicate that the budget needs to be adjusted to reduce costs.

  • Conversely, if the rolling margin is consistently positive, it may indicate that the budget ...read more

Q6. Types of Cube and bricks tests

Ans.

Cube and brick tests are used to determine the strength and durability of building materials.

  • Compression test: measures the ability of a cube or brick to withstand compressive loads

  • Water absorption test: determines the amount of water absorbed by the material

  • Efflorescence test: checks for the presence of salt deposits on the surface of the material

  • Soundness test: evaluates the resistance of the material to disintegration

  • Dimensional stability test: measures the ability of the ...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. Length of column ring

Ans.

The length of column ring depends on the specific project requirements and design.

  • The length can vary based on the height of the building

  • It can also depend on the load-bearing capacity of the column

  • Consultation with structural engineers is necessary for determining the appropriate length

Q8. Capabilities required for job

Ans.

The job requires strong project management skills, technical expertise, communication skills, and problem-solving abilities.

  • Strong project management skills to ensure timely completion of projects

  • Technical expertise to understand and oversee the technical aspects of the project

  • Excellent communication skills to effectively communicate with team members, stakeholders, and clients

  • Problem-solving abilities to identify and resolve issues that may arise during the project

  • Ability to...read more

DGM-Projects Jobs

Deputy General Manager - Projects 15-20 years
Godrej Properties Limited
4.1
Mumbai
Deputy General Manager - Projects 15-20 years
Godrej Agrovet
4.0
Mumbai
Deputy General Manager - Projects 20-25 years
Urbanrise Constructions
5.0
Chennai
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Recently Viewed
DESIGNATION
DGM-Projects Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter