Upload Button Icon Add office photos

Filter interviews by

At Technolegal Combine Interview Questions and Answers

Updated 18 May 2023

At Technolegal Combine Interview Experiences

1 interview found

DGM-Projects Interview Questions & Answers

user image Anonymous

posted on 17 May 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Rolling Margin and its affect in Budget
  • Ans. 

    Rolling margin is the difference between actual and budgeted costs over a period of time.

    • Rolling margin helps in identifying cost overruns or savings over a period of time.

    • It helps in adjusting the budget for future periods based on the rolling margin trend.

    • For example, if the rolling margin is consistently negative, it may indicate that the budget needs to be adjusted to reduce costs.

    • Conversely, if the rolling margin ...

  • Answered by AI
  • Q2. Deduction items in Bills. Escalation clause. Reconciliation of owner supplied material. Extra items & Deviation items. What is basic rates and cost difference.
  • Q3. Earth work measurement. plastering measurement. Rate analysis of M25 grade Concrete.
  • Q4. Length of column ring
  • Ans. 

    The length of column ring depends on the specific project requirements and design.

    • The length can vary based on the height of the building

    • It can also depend on the load-bearing capacity of the column

    • Consultation with structural engineers is necessary for determining the appropriate length

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare to face Technical based questions.

DGM-Projects Interview Questions asked at other Companies

Q1. How to calculate dry cost of Projects
View answer (2)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Basic c and c++ questions
  • Q2. Write a program to find duplicates in the string.
Round 2 - One-on-one 

(3 Questions)

  • Q1. C++ questions, smart pointers
  • Q2. Multithreading, how do ensure function is thread safe
  • Q3. Design patterns, singleton pattern
Round 3 - One-on-one 

(2 Questions)

  • Q1. How do deal with people who are speaking negative about you and your team
  • Q2. How do handle pressure situations
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(3 Questions)

  • Q1. Can you explain the process of designing a specific grade of concrete, including the relevant considerations and calculations involved?
  • Q2. Design a grade of PQC Concrete
  • Q3. Refer relevant IS code, google it and learn it. Take advice of RMC expert

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about concrete, its raw materials, their testing procedures, and the relevant Indian Standards (IS) codes associated with them. Additionally, understand durability testing and the relevant IS codes. Explore the technical indicators of a Ready Mixed Concrete (RMC) plant, including admixture cost per kilogram of cement and megapascals (MPa), among other factors.
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Skill test only after hr round
  • Q2. They will try not to give you any kind of Saturday of or any kind of paid leave, never accept their contractual aggreement, only ask for permanent position, otherwise leave instance, on contractual u were ...

Interview Preparation Tips

Interview preparation tips for other job seekers - "I joined as contractual based" Dont accept contractual based job, you become there low paid donkey while permanent people having fun nd very high paid 4 time then u, their skill r just normal, u ll never get any paid leave or they try to avoid giving u Saturday off's, if u didn't ask for yourself, i got demotivated while working there they dont care about ur problem, they always give over tasks with narrow deadline, if u reject then they will not let u get any appraisal, i got called 2 time for getting permanent offer but my Team lead just declined because i reject her one project that has 45 slide animation, some part i need to pick from other projects AE file (keep in mind that u cant understand anyone file structure just in second, also animation done with codes, so its not easy at all, i ll have to recreate that code also) they provide me 3 day for project, i said not possible, they force me the project then i asked for a partner for this project, they agree but didn't provide, finally i started bcos no choice, then i received other projects file 4hr late which i need to start the project with, 3 day were not enough already but they were start forcing another project on me for translation which will take half hr but my TL said dont accept any other projects so i said no i can't but again they were forcing me to do it, i ask 2 hr for project bcos yesterday i done similar projects nd there were one error in there font thats not gonna solve easily, so by keep that in mind i ask for 2 hr they got offended and take revenge in my appraisal day, let get back to previous project, where i got 3 day nd 4 hr wasted, i m already in pressure then the person connect with client come to me and says,next evening we need the project done "in my mind i say f**k u i just started" so my 3 days project deadline cut down to 2 days, where i was 4 hr behind, i have completed 10 slide animation in first day, im suffering from cold from they day one, they dont notice bcos they have to come to office for only 2day "f**k" i start blaming me that project gonna delay bcos of u, u are not worth it, so i take sick leave next day bcos coming to office takes my 5 hr i thought next day i ll do work from home nd maybe i catch up to the task by doing over time, but politics nd revenge, i got called in a meeting in morning so i joined in an instance to explain my situation nd my decision but they didn't notice that i have joined so as a junior i m hearing, see what i hear from them "i hear that they were not some babysitter, f**k me nd etc." but i ignore that nonsense nd try explaining my situation nd what i gonna do next, but there anger nd pressure they dont listen just blaming me so i, let them do what they like,...i shared the project file to them, nd they finished that project in 4day with 2 people working on that... company is good but politics is there, female are not suitable as leader at all, dont work under any female TL or manager...there names were "Aditi nd Anuj" my Manager+TL, project client coordinator (i forget her name)nd one extra person whos nose is everywhere is "Richa".
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Can you provide a self-introduction?
  • Q2. What is your current position, and what are your job responsibilities?
  • Q3. Knowledge about chemical and dilution, team handling, client visit preparation, stock management, vendor management and basic about safety.

Interview Preparation Tips

Interview preparation tips for other job seekers - Simply be confident, transparent, and maintain comprehensive knowledge of your Key Responsibilities Areas (KRA).
Interview experience
4
Good
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Basic details and family backgrounds
  • Q2. Tell me about yourself.
Round 2 - One-on-one 

(1 Question)

  • Q1. Can you tell me about yourself and your role as a Customer Care Executive? Have you had any experience with cold calling, and do you have any background in sales? What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - I require greater knowledge in the real estate field and hope for increased success in sales within that sector.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 4 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. 1 hr interview divided into 4 sections - Intro - Backend - .NET & OOPS Concepts (Was given a code to analyze) - SQL - Write a sql query & some sql questions on joins etc. - Frontend - Angular related quest...
Round 2 - Technical 

(1 Question)

  • Q1. Bit low level Design Patterns Questions, SQL Questions, Angular Questions Checking your confidence while answering
Round 3 - Technical 

(1 Question)

  • Q1. This was Manegerial Round, asked about projects worked upon and some questions over the projects
Round 4 - HR 

(1 Question)

  • Q1. For this round I was being called to their base location. Salary Discussion

Interview Preparation Tips

Topics to prepare for Bosch Global Software Technologies Consultant interview:
  • .NET
  • SQL
  • Angular
  • Azure
Interview preparation tips for other job seekers - Interview went quiet well. Prepare for sql queries & brush up knowledge. SOLID principles/Design Patterns
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the difference between surge and est test.
  • Q2. What is the eft, what is the procedure for RI and RS test. What is the CE and CS testing.
Round 2 - Technical 

(2 Questions)

  • Q1. What is the most challenging aspect of the EMI/EMC testing process?
  • Q2. What steps should be taken to prepare for a conducted susceptibility test?

Interview Preparation Tips

Interview preparation tips for other job seekers - Please allow 2 to 3 days for interview preparation.
Interview experience
2
Poor
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Fire protection and fire system week check team training
  • Q2. Monthly and weekly report check
Round 2 - Assignment 

Fire and production department

Round 3 - HR 

(2 Questions)

  • Q1. Company Protection and Company Employee Security
  • Q2. There should be no problem in company benefit and company
Round 4 - HR 

(2 Questions)

  • Q1. CompanWhat can we do for the company and the benefits of the company
  • Q2. Company me kitne Data of how many employees are there in the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via campus placement at National Institute of Technology (NIT), Warangal and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Normal to medium level general aptitude questions

Round 2 - Technical 

(2 Questions)

  • Q1. Types of building contract
  • Q2. Type of soil for each buildings
Round 3 - One-on-one 

(2 Questions)

  • Q1. Assesment day GD for 2 rounds
  • Q2. All situational based questions

Interview Preparation Tips

Topics to prepare for WSP Due Diligence Analyst interview:
  • Building contracts
  • Soil Mechanics
Interview preparation tips for other job seekers - Answering to situational questions wisely is very important

At Technolegal Combine Interview FAQs

How many rounds are there in At Technolegal Combine interview?
At Technolegal Combine interview process usually has 2 rounds. The most common rounds in the At Technolegal Combine interview process are Resume Shortlist and Technical.
What are the top questions asked in At Technolegal Combine interview?

Some of the top questions asked at the At Technolegal Combine interview -

  1. Rolling Margin and its affect in Bud...read more
  2. Length of column r...read more
  3. Deduction items in Bills. Escalation clause. Reconciliation of owner supplied m...read more

Tell us how to improve this page.

At Technolegal Combine Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 341 Interviews
Quest Global Interview Questions
3.6
 • 294 Interviews
Square Yards Interview Questions
4.0
 • 197 Interviews
VVDN Technologies Interview Questions
3.6
 • 190 Interviews
Caterpillar Inc Interview Questions
4.3
 • 176 Interviews
TO THE NEW Interview Questions
3.7
 • 130 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
View all

At Technolegal Combine Reviews and Ratings

based on 4 reviews

4.0/5

Rating in categories

3.0

Skill development

4.4

Work-life balance

3.9

Salary

3.9

Job security

3.9

Company culture

3.9

Promotions

4.4

Work satisfaction

Explore 4 Reviews and Ratings
Civil Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Project Engineer
4 salaries
unlock blur

₹3 L/yr - ₹6.7 L/yr

General Manager
4 salaries
unlock blur

₹15.2 L/yr - ₹22 L/yr

Explore more salaries
Compare At Technolegal Combine with

JLL

4.1
Compare

Bosch Global Software Technologies

4.0
Compare

Schneider Electric

4.2
Compare

Square Yards

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview