Filter interviews by
I applied via campus placement at Assam Engineering College (AEC) and was interviewed in Sep 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed before Aug 2023. There was 1 interview round.
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.
Ohm's law is represented by the formula V = I * R, where V is voltage, I is current, and R is resistance.
It helps in calculating the current flowing through a circuit when the voltage and resistance are known.
It also helps in determining the resis...
My favorite subject in my bachelors was Mechanical Engineering.
I enjoyed learning about thermodynamics and fluid mechanics.
I found the hands-on labs and projects in my major to be very engaging.
I particularly liked studying materials science and design principles.
One of my favorite courses was on machine design, where I got to work on real-world engineering problems.
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Badri Rai and Company interview questions for popular designations
I applied via Walk-in and was interviewed in Jan 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
Installation of a pile involves several procedures that must be followed carefully.
Site preparation and marking
Excavation of soil to the required depth
Insertion of pile into the hole
Pouring of concrete or grout into the hole
Curing of the concrete or grout
Cutting the pile to the required level
Testing the pile for load-bearing capacity
The estimated project timeline is 6 months.
Consider the scope of the project
Break down the tasks and estimate time for each
Factor in any potential delays or obstacles
Consult with team members and stakeholders
Use project management tools to track progress
Example: A website redesign project estimated at 6 months
Top trending discussions
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Stop work application is a procedure used to halt work activities due to safety concerns or violations.
Stop work applications are typically used when there is an imminent danger to workers or the environment.
Workers are trained to recognize when a stop work application is necessary and how to properly implement it.
Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.
Scaffolding provides a safe working platform at height
It is typically made of metal or wood
Different types include tube and coupler, frame, and system scaffolding
Scaffolding must be inspected regularly for safety
Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground or a building structure.
Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.
Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.
Other typ...
Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.
Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.
Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.
Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.
Fires ca...
based on 71 reviews
Rating in categories
Site Engineer
18
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Civil Site Engineer
15
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Executive Accountant
12
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Senior Executive
9
salaries
| ₹2.3 L/yr - ₹4.6 L/yr |
Junior Engineer
7
salaries
| ₹1.8 L/yr - ₹2.9 L/yr |
Rupesh Kumar & Sons
Gupta Brothers
Singhania Enterprises
Sharma Industries