Upload Button Icon Add office photos

Filter interviews by

Construction Group Interview Questions, Process, and Tips

Updated 26 Jan 2025

Top Construction Group Interview Questions and Answers

View all 18 questions

Construction Group Interview Experiences

Popular Designations

25 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

We have ask about civil engineering topics

Round 2 - Technical 

(3 Questions)

  • Q1. We have to asks technical skills
  • Q2. We to ask mostly asking questions in interview
  • Q3. We have ask important questions in civil engineering topics
Round 3 - One-on-one 

(2 Questions)

  • Q1. We have to asks all
  • Q2. We have ask alll

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks

Construction Management Interview Questions asked at other Companies

Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Documents 

(3 Questions)

  • Q1. Computer knowledge
  • Q2. Proper documents
  • Q3. Proper documents and working material maintenance and statement
Round 2 - Material 

(2 Questions)

  • Q1. Material maintenance
  • Q2. 100% works proficiency

Interview Preparation Tips

Interview preparation tips for other job seekers - Word microsoft office excel

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.

Round 3 - Technical 

(2 Questions)

  • Q1. Just ask the technical questions regard what you learn till now through your studies.
  • Q2. In which subject you have more knowledge?
  • Ans. 

    I have more knowledge in structural engineering.

    • Specialization in structural analysis and design

    • Extensive experience in designing buildings, bridges, and other structures

    • Knowledge of various materials and construction techniques

    • Familiarity with relevant codes and standards

    • Ability to perform structural calculations and simulations

  • Answered by AI
Round 4 - HR 

(3 Questions)

  • Q1. What's your strength?
  • Q2. If you are selected then what's your responsibility for your company?
  • Q3. Your able to work in a flexible time .

Interview Preparation Tips

Interview preparation tips for other job seekers - First your know about the company and post in which you apply.
You should have knowledge in which post you apply.
For example if you are applying for site engineer then you should have knowledge of building materials, test of materials. IS code knowledge. Ms Excel, ms word, etc . Knowledge you should have. There are some software that also used in construction.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Asked about my Qualifications
  • Q2. Said my qualifications

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)

Construction Group interview questions for popular designations

 Site Engineer

 (4)

 Store Incharge

 (3)

 B Tech Civil Engineer

 (2)

 Assistant Design Engineer

 (1)

 Capacity Building Trainer

 (1)

 Civil Construction Supervisor

 (1)

 Civil Engineer

 (1)

 Civil Site Engineer

 (1)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Feb 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

Top Construction Group Site Engineer Interview Questions and Answers

Q1. What the thickness of compreg ply and it's size
View answer (3)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Get interview-ready with Top Construction Group Interview Questions

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation & keep the stores neat & clean To inform my superiors to stock status. To stay near the site & do the activities
  • Q2. Salary expectation & increment position

Interview Preparation Tips

Topics to prepare for Construction Group Store Incharge interview:
  • Management
Interview preparation tips for other job seekers - Location & stores stocks update timely.To check up construction area any wastage to confirm.

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Jan 2022

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 

    The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.

    • The thickness of compreg ply can range from 3mm to 25mm or more

    • The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more

    • The thickness and size of compreg ply can be customized based on the specific requirements of the project

    • Compreg ply is commonly...

  • Answered by AI
  • Q2. Maximum reapetation of ply shuttering
  • Ans. 

    The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.

    • The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.

    • If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.

    • However, if the concrete mix is harsh or the weather conditions ar...

  • Answered by AI
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Ans. 

    The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.

    • The elongation % of fe550 steel can range from 14% to 20%.

    • It is important to refer to the specifications provided by the manufacturer for accurate information.

    • The elongation % indicates the ability of the steel to deform before breaking under tension.

    • Fe550 steel is commonly used in construction and reinforcement application

  • Answered by AI
  • Q5. What the mean of rolling margin of the steel
  • Ans. 

    Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.

    • Rolling margin is a measure of the accuracy of the rolling process.

    • It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.

    • A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.

    • Rolling margin is i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties

Top Construction Group Site Engineer Interview Questions and Answers

Q1. What the thickness of compreg ply and it's size
View answer (3)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What about your typing speed
  • Ans. 

    I have a typing speed of 70 words per minute with 98% accuracy.

    • My typing speed is 70 words per minute.

    • I have a typing accuracy of 98%.

    • I am proficient in touch typing and can type without looking at the keyboard.

    • I have experience in typing various types of documents such as reports, emails, and memos.

    • I am constantly working on improving my typing speed and accuracy.

  • Answered by AI
  • Q2. How many years experience do you have

Interview Preparation Tips

Interview preparation tips for other job seekers - this is one of the good platform for unemploys

Office Administrator Interview Questions asked at other Companies

Q1. Incase There are 4 members in our store along with you, you are the Manager, 2 persons In week off, 1 person in Leave, 1 person Is fell down in Store... At that time Customer walkin flow is Coming, How you handle The Store?
View answer (1)

I applied via Approached by Company and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Assignment 

Ghatkopar site ..... Town planning BMC plot disputed area and plot boundary correction works done in CTS office, SLR collector office Bandra, BMC Town planning department, urban development department, Principal secretary Mantralya to CM.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and sincerity are to be appreciated.

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jun 2022

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed

Top Construction Group Site Engineer Interview Questions and Answers

Q1. What the thickness of compreg ply and it's size
View answer (3)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Construction Group Interview FAQs

How many rounds are there in Construction Group interview?
Construction Group interview process usually has 3-4 rounds. The most common rounds in the Construction Group interview process are Resume Shortlist, HR and Technical.
How to prepare for Construction Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Construction Group. The most common topics and skills that interviewers at Construction Group expect are Construction, Accounting Software, Commerce, AdWords and Analytical skills.
What are the top questions asked in Construction Group interview?

Some of the top questions asked at the Construction Group interview -

  1. What the thickness of compreg ply and it's s...read more
  2. In which subject you have more knowled...read more
  3. Consumption of shuttering oil per ltr how much area cove...read more

Tell us how to improve this page.

Construction Group Interview Process

based on 10 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Construction Group Reviews and Ratings

based on 91 reviews

4.2/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.9

Salary

3.7

Job security

3.9

Company culture

3.8

Promotions

4.1

Work satisfaction

Explore 91 Reviews and Ratings
Civil Site Engineer
45 salaries
unlock blur

₹1.2 L/yr - ₹5 L/yr

Accountant
44 salaries
unlock blur

₹1.1 L/yr - ₹6 L/yr

Civil Engineer
37 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Executive Accountant
31 salaries
unlock blur

₹1.1 L/yr - ₹4.8 L/yr

Safety Officer
27 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Explore more salaries
Compare Construction Group with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview