Construction Group Site Engineer Interview Questions, Process, and Tips

Updated 26 Feb 2023

Top Construction Group Site Engineer Interview Questions and Answers

View all 8 questions

Construction Group Site Engineer Interview Experiences

4 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Feb 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Jan 2022

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 

    The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.

    • The thickness of compreg ply can range from 3mm to 25mm or more

    • The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more

    • The thickness and size of compreg ply can be customized based on the specific requirements of the project

    • Compreg ply is commonly...

  • Answered by AI
  • Q2. Maximum reapetation of ply shuttering
  • Ans. 

    The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.

    • The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.

    • If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.

    • However, if the concrete mix is harsh or the weather conditions ar...

  • Answered by AI
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Ans. 

    The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.

    • The elongation % of fe550 steel can range from 14% to 20%.

    • It is important to refer to the specifications provided by the manufacturer for accurate information.

    • The elongation % indicates the ability of the steel to deform before breaking under tension.

    • Fe550 steel is commonly used in construction and reinforcement application

  • Answered by AI
  • Q5. What the mean of rolling margin of the steel
  • Ans. 

    Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.

    • Rolling margin is a measure of the accuracy of the rolling process.

    • It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.

    • A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.

    • Rolling margin is i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jun 2022

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Apr 2022

Round 1 - Technical 

(1 Question)

  • Q1. Introduction,goals,Explain your final year project

Interview Preparation Tips

Interview preparation tips for other job seekers - Do preperation on communication skill development,focus on technical area,have a goal

Construction Group interview questions for designations

 Site Engineer/Site Supervisor

 (1)

 Civil Site Engineer

 (1)

 Senior Civil Site Engineer

 (1)

 Site Accountant

 (1)

 Civil Engineer

 (1)

 B Tech Civil Engineer

 (2)

 General Manager Project

 (1)

 Construction Management

 (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Experience, previous salary, previous co. Name, total Experience letter, salary slip and discuss for location
Round 2 - Case Study 

Kis co. Me kya kya kaam kiya

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl

I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All site work procedures All material, Activity Quantity, Boq and Reconciliation

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview confidently...
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI

Construction Group Interview FAQs

How many rounds are there in Construction Group Site Engineer interview?
Construction Group interview process usually has 1-2 rounds. The most common rounds in the Construction Group interview process are Technical, Resume Shortlist and Case Study.
What are the top questions asked in Construction Group Site Engineer interview?

Some of the top questions asked at the Construction Group Site Engineer interview -

  1. What the thickness of compreg ply and it's s...read more
  2. Consumption of shuttering oil per ltr how much area cove...read more
  3. What the mean of rolling margin of the st...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Construction Group interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Construction Group Site Engineer Salary
based on 21 salaries
₹1.5 L/yr - ₹4.2 L/yr
25% less than the average Site Engineer Salary in India
View more details

Construction Group Site Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

4.0

Work-Life balance

4.0

Salary & Benefits

4.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Civil Site Engineer
45 salaries
unlock blur

₹1.2 L/yr - ₹5 L/yr

Accountant
44 salaries
unlock blur

₹1.1 L/yr - ₹4.8 L/yr

Civil Engineer
36 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Executive Accountant
31 salaries
unlock blur

₹1.1 L/yr - ₹4.8 L/yr

Safety Officer
27 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Explore more salaries
Compare Construction Group with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview