I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.
Penetration test involves identifying vulnerabilities in a system or network.
It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.
The goal of a penetration test is to strengthen the security defenses of the system or network.
Common ...
Waterproofing is a process of making a structure or material resistant to the penetration of water.
Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.
It is commonly used in construction to protect buildings from water damage.
Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.
Types of foundation include shallow, deep, and pile foundations.
Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.
Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.
Pile foundations are deep foundations that consist of long, slender columns driven...
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.
Determine the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, water, and admixtures
Calculate the proportions of each material based on desired properties and specifications
Perform trial mixes to test the properties of the co...
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
based on 4 reviews
Rating in categories
Design Engineer
10
salaries
| ₹2 L/yr - ₹3.2 L/yr |
HR Executive
9
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
MIS Executive
8
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Deputy General Manager
7
salaries
| ₹14 L/yr - ₹18 L/yr |
Assistant Manager
7
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim