Upload Button Icon Add office photos

ITD Cementation India

Compare button icon Compare button icon Compare

Filter interviews by

ITD Cementation India Interview Questions, Process, and Tips for Experienced

Updated 7 Apr 2025

Top ITD Cementation India Interview Questions and Answers for Experienced

View all 30 questions

ITD Cementation India Interview Experiences for Experienced

Popular Designations

43 interviews found

Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Sep 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. About pile method
  • Q2. About pile cap, pier and pier cap
  • Q3. About deck slab
  • Q4. About shuttering work
  • Q5. About professional work like bbs, billing

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Simple 1year question for fresher dipend upon designation and strim
  • Q2. Privious work experience
  • Ans. 

    I have 5 years of experience working as an Operation & Maintenance Engineer in a manufacturing plant.

    • Managed daily operations and maintenance activities to ensure smooth functioning of equipment and machinery

    • Implemented preventive maintenance schedules to minimize downtime and increase efficiency

    • Troubleshooted and resolved technical issues to maintain production targets

    • Collaborated with cross-functional teams to improv...

  • Answered by AI
  • Q3. You must know all about your privious work
  • Q4. If you are mechanical learn all about engine and hydraulic

Operation & Maintenance Engineer Interview Questions asked at other Companies

Q1. Why we do oil test and what are we check in oil test?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. What type of soil is used in reinforced earth walls?
  • Ans. 

    Reinforced earth walls typically use granular soils for stability and drainage, enhancing structural integrity.

    • Granular soils, such as sand and gravel, are preferred for their drainage properties.

    • Cohesive soils, like clay, can be used but may require additional reinforcement.

    • Well-graded soils provide better compaction and stability.

    • Examples include crushed stone or sandy soils for effective load distribution.

  • Answered by AI
  • Q2. Are you knowledgeable about Building Information Modeling or other drawing concepts?
  • Ans. 

    I have extensive knowledge of Building Information Modeling (BIM) and various drawing concepts used in engineering and construction.

    • BIM integrates 3D modeling with data management for efficient project delivery.

    • Familiar with software like Revit and AutoCAD for creating detailed architectural plans.

    • Understanding of clash detection in BIM to identify potential issues before construction.

    • Experience in using BIM for lifecy...

  • Answered by AI
  • Q3. What type of soil is used in reinforced earth walls and earthworks?
  • Ans. 

    Reinforced earth walls utilize granular soils, cohesive soils, and select fill for stability and strength in earthworks.

    • Granular soils, such as sand and gravel, provide good drainage and stability.

    • Cohesive soils, like clay, can be used but require careful management of moisture content.

    • Select fill materials, often engineered for specific properties, enhance performance.

    • Examples include crushed stone or recycled concret

  • Answered by AI
  • Q4. Are you familiar with highway slope ratios?
  • Ans. 

    Highway slope ratios indicate the steepness of roadways, crucial for safety and drainage.

    • Slope ratio is expressed as a ratio of vertical rise to horizontal run, e.g., 1:10.

    • A common slope ratio for highways is 1:20, ensuring safe vehicle operation.

    • Steeper slopes may require additional safety measures like guardrails.

    • Slope ratios affect drainage; flatter slopes promote better water runoff.

  • Answered by AI

Executive Engineer Interview Questions asked at other Companies

Q1. Question 1: What is memory leak? Question 2: What is static variable in C? with program Question 3: What are local variable and global variables? and their default values and program Question 4: What is method overriding? with program
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related. Work responsibilities, methods, profile, problems, solutions.
  • Q2. Experience related
Round 2 - Technical 

(2 Questions)

  • Q1. Work related questions. Responsibility, experience, methods, problems, solutions.
  • Q2. Commercial , salary related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Purely work & experience & job requirements related questions.

Assistant General Manager Interview Questions asked at other Companies

Q1. It is observed that most of our Indian Bank's NIM is declining over the years. what could be some alternate revenue model for banks for boosting overall income to compensate for the declining NIM?
View answer (2)

ITD Cementation India interview questions for popular designations

 Assistant Manager

 (6)

 Senior Engineer

 (4)

 Senior Civil Engineer

 (3)

 Engineer

 (2)

 Manager

 (2)

 Diploma Trainee Engineer

 (2)

 Electrical Engineer

 (2)

 Civil Engineer

 (2)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2023, where I was asked the following questions.

  • Q1. What challenges did you encounter while managing local authorities in relation to liaising?
  • Ans. 

    Managing local authorities involves navigating bureaucratic challenges, communication barriers, and differing priorities.

    • Bureaucratic delays: Often faced slow response times from local authorities, which hindered project timelines. For example, obtaining permits took longer than expected.

    • Communication barriers: Different terminologies and processes led to misunderstandings. I initiated regular meetings to clarify expec...

  • Answered by AI
  • Q2. What strategies have been implemented for manpower mobilization and retention?
  • Ans. 

    Effective strategies for manpower mobilization and retention include targeted recruitment, employee engagement, and career development programs.

    • Implement targeted recruitment strategies to attract qualified candidates, such as using social media and job fairs.

    • Enhance employee engagement through regular feedback sessions and team-building activities, fostering a positive work environment.

    • Offer competitive compensation p...

  • Answered by AI

Assistant Manager - Administration Interview Questions asked at other Companies

Q1. Preventive maintenance plan of asset
View answer (5)

Get interview-ready with Top ITD Cementation India Interview Questions

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel structures
  • Q2. Shuttering work
  • Q3. Steel structures bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - # Work experience #
∞ . Conventional shuttering, ∞. Aluform shuttering. system formwork,
∞. Reinforcement checking and BBS
∞. Site execution as per drowning.

★. 3rd year experience and at Alcove Developers LLP , high-rise, residential building project, new kalkata project - 22 nos tower (G+30) with non - tower, club house, road , stp , RWHT , from 15 th December, 2020 currently working in this role ( G+2 podium+ 28 typical floor) tower in charge.

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Jobs at ITD Cementation India

View all
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Load test process

Top ITD Cementation India Assistant Manager Interview Questions and Answers

Q1. 1 ton steel work how much quantity of binding wire required?
View answer (4)

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Loadcell damage, How can you rectify
  • Ans. 

    Loadcell damage can be rectified by recalibrating or replacing the loadcell.

    • Recalibrate the loadcell using the manufacturer's instructions.

    • Replace the damaged loadcell with a new one.

    • Ensure proper maintenance and regular checks to prevent future damage.

  • Answered by AI

Concrete Batching Plant Operator Interview Questions asked at other Companies

Q1. How many types of plant are there?
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What you have done in hvac system?
  • Ans. 

    I have experience in maintaining and troubleshooting HVAC systems.

    • Performed regular maintenance checks on HVAC equipment

    • Identified and repaired faulty components in HVAC systems

    • Implemented energy-saving measures to improve efficiency

    • Collaborated with HVAC technicians to resolve complex issues

  • Answered by AI
  • Q2. Which softwares do you know?
  • Ans. 

    I am familiar with various softwares including CMMS, CAD, and Microsoft Office Suite.

    • CMMS (Computerized Maintenance Management System)

    • CAD (Computer-Aided Design)

    • Microsoft Office Suite

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Tell us all the steps starting from the receiving of the project.

Deputy Manager Maintenance Interview Questions asked at other Companies

Q1. Strength of maintenance team and responsibility. How to define capacity of cooling tower before installed and pressure maintain minimum and maximum. Plant layout and also which location of mold. Total no. Of crane and max. Capacity, make an... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. All quality testing
  • Q2. Gradation

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)

ITD Cementation India Interview FAQs

How many rounds are there in ITD Cementation India interview for experienced candidates?
ITD Cementation India interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the ITD Cementation India interview process for experienced candidates are Technical, HR and Resume Shortlist.
How to prepare for ITD Cementation India interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ITD Cementation India. The most common topics and skills that interviewers at ITD Cementation India expect are Procurement, Vendor Development, Civil Engineering, MEP and SCM.
What are the top questions asked in ITD Cementation India interview for experienced candidates?

Some of the top questions asked at the ITD Cementation India interview for experienced candidates -

  1. How we can design busbar for increased fault level but same current rating...read more
  2. What will be the bending radius for different HT cabl...read more
  3. Are you knowledgeable about Building Information Modeling or other drawing conc...read more
How long is the ITD Cementation India interview process?

The duration of ITD Cementation India interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

ITD Cementation India Interview Process for Experienced

based on 28 interviews

Interview experience

4.3
  
Good
View more

ITD Cementation India Reviews and Ratings

based on 1.2k reviews

4.3/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

4.0

Salary

4.3

Job security

4.0

Company culture

3.6

Promotions

3.9

Work satisfaction

Explore 1.2k Reviews and Ratings
Assistant Manager
292 salaries
unlock blur

₹5.4 L/yr - ₹15 L/yr

Senior Engineer
230 salaries
unlock blur

₹3.8 L/yr - ₹11 L/yr

Civil Engineer
178 salaries
unlock blur

₹2.8 L/yr - ₹9.5 L/yr

Engineer
176 salaries
unlock blur

₹2.9 L/yr - ₹8 L/yr

Deputy Manager
160 salaries
unlock blur

₹7 L/yr - ₹17.5 L/yr

Explore more salaries
Compare ITD Cementation India with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AtkinsRealis

3.9
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview