Filter interviews by
I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.
Motivating someone through music can be done by understanding their preferences and using songs that resonate with them.
Get to know the person's musical preferences and interests
Create a playlist or share songs that align with their taste
Use music to create a positive and energizing work environment
Encourage participation in music-related activities or events
Recognize and appreciate the impact of music on their motivat
I'm sorry, but that question is not related to the Autocad Design Engineer position.
When choosing a company as an Autocad Design Engineer, consider factors such as company culture, growth opportunities, work-life balance, and salary.
Research the company's culture and values to ensure they align with your own
Evaluate the company's growth potential and opportunities for career advancement
Consider the work-life balance offered by the company and if it suits your needs
Assess the salary and benefits packag...
I have strong skills in Autocad design, including 2D and 3D modeling, drafting, and creating detailed technical drawings.
Proficient in Autocad software
Extensive experience in 2D and 3D modeling
Skilled in drafting and creating technical drawings
Knowledge of industry standards and best practices
Attention to detail and accuracy
Ability to interpret and implement design specifications
Strong problem-solving and analytical sk
Strength is the ability of a material or structure to withstand external forces without breaking or deforming.
Strength is an important factor in engineering and design, as it ensures the safety and reliability of structures.
There are different types of strength, such as tensile strength, compressive strength, and shear strength.
Tensile strength measures a material's ability to resist pulling or stretching forces.
Compre...
I enjoy the Autocad Design Engineer job because it allows me to combine my passion for design with my technical skills.
I love being able to bring ideas to life through design and seeing the final product.
I enjoy the challenge of solving complex design problems and finding innovative solutions.
Working with Autocad allows me to utilize my technical skills and attention to detail.
I find satisfaction in creating precise an...
Effective time management is crucial for success in any project, including Autocad design engineering.
Prioritize tasks based on their importance and urgency
Set realistic deadlines and stick to them
Use tools like calendars and to-do lists to stay organized
Delegate tasks to team members if possible
Regularly review progress and adjust plans as needed
My family is a close-knit unit that values love, support, and togetherness.
We prioritize spending quality time together.
We support each other's goals and aspirations.
We celebrate milestones and achievements together.
We have regular family gatherings and traditions.
We communicate openly and honestly with each other.
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
PEB structure construction involves design, fabrication, and erection of pre-engineered steel buildings.
Designing the structure based on the requirements and specifications
Fabricating the steel components in a factory setting
Transporting the components to the construction site
Erecting the structure using cranes and other equipment
Installing roofing and wall panels
Finishing with insulation, doors, windows, and other acc...
PEB quality check involves inspection of raw materials, fabrication, welding, and painting.
Raw material inspection for quality and quantity
Fabrication inspection for dimensions and tolerances
Welding inspection for quality and strength
Painting inspection for thickness and adhesion
Non-destructive testing for welds and bolts
Final inspection before dispatch
Documentation and record keeping
Project management is the process of planning, organizing, and overseeing the execution of a project from start to finish.
It involves defining project goals, timelines, and budgets
Identifying and allocating resources
Managing risks and issues
Monitoring progress and making adjustments as needed
Ensuring that the project is completed on time, within budget, and to the satisfaction of stakeholders
Examples include constructi...
A project can run behind schedule due to various reasons.
Poor planning and scheduling
Unforeseen circumstances such as weather conditions, material shortages, or labor strikes
Inefficient communication and coordination among team members
Changes in project scope or requirements
Lack of resources or funding
Inadequate project management
Unrealistic timelines or deadlines
Technical difficulties or equipment failure
Human error o...
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
HYT Engineering interview questions for popular designations
Get interview-ready with Top HYT Engineering Interview Questions
I applied via AmbitionBox and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
Types of bearings include ball, roller, plain, and magnetic. Welding methods include MIG, TIG, and stick welding.
Ball bearings use balls to reduce friction and support radial and axial loads.
Roller bearings use cylindrical or tapered rollers to support heavy loads.
Plain bearings have a sliding surface and are used for low-speed and high-load applications.
Magnetic bearings use magnetic fields to support rotating shafts.
...
Casting is a manufacturing process in which a liquid material is poured into a mold and allowed to solidify.
Types of casting include sand casting, investment casting, die casting, and continuous casting.
Sand casting involves pouring molten metal into a sand mold.
Investment casting involves creating a wax pattern and then coating it in ceramic before pouring in the molten metal.
Die casting involves injecting molten meta...
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Fraud control at site is crucial and can be achieved through a combination of measures.
Implementing strict access control measures
Conducting regular audits and inspections
Establishing clear policies and procedures for reporting and investigating fraud
Training employees on fraud prevention and detection
Collaborating with law enforcement agencies
Using technology to monitor and detect fraudulent activities
Parameters of a project include scope, time, cost, quality, resources, and risks.
Scope defines the boundaries and deliverables of the project.
Time refers to the project schedule and deadlines.
Cost includes the budget and financial resources required for the project.
Quality refers to the standards and expectations for the project outcomes.
Resources include the people, equipment, and materials needed for the project.
Risk...
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
Rate analysis of 1 cum of B/W
B/W stands for Brickwork
Rate analysis involves calculating the cost of materials, labor, and equipment required for a project
Factors that affect the rate analysis include location, availability of materials, and labor costs
The rate analysis for 1 cum of B/W would depend on the specific project requirements and materials used
Top trending discussions
The duration of HYT Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 29 interviews
Interview experience
based on 319 reviews
Rating in categories
Purchase Engineer
50
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Project Manager
40
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Quality Engineer
32
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Civil Site Engineer
32
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Service Engineer
30
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
L&T Technology Services
TCS
BHEL
Thermax Limited