Filter interviews by
Top trending discussions
posted on 4 Jul 2024
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
posted on 2 Nov 2022
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
The costing of wiring harness and driver seat is dependent on various factors such as the type of vehicle, quality of materials used, and manufacturing process.
The cost of wiring harness and driver seat can vary depending on the type of vehicle they are being used in. For example, the cost of these parts for a luxury car will be higher than that of a budget car.
The quality of materials used in the manufacturing of thes...
posted on 14 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 29 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 5 Mar 2024
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 5 interview rounds.
General aptitude teat and mechanical engineering technical question paper
posted on 20 Feb 2025
I appeared for an interview before Feb 2024.
Current affairs, GK and presence of mind
Vendor development and management involves establishing relationships with suppliers, negotiating contracts, and ensuring quality and timely delivery of goods/services.
Identify potential vendors through market research and referrals
Evaluate vendors based on criteria such as price, quality, reliability, and delivery time
Negotiate contracts to ensure favorable terms for the company
Monitor vendor performance and address a...
posted on 1 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 9 Sep 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
The assembly line sequence involves a step-by-step process of assembling parts to create a final product.
The process starts with the arrival of raw materials
Parts are then assembled in a specific order
Quality checks are performed at various stages
The final product is packaged and shipped
Efficiency and safety are key considerations throughout the process
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Purchase Engineer
50
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Project Manager
40
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Civil Site Engineer
32
salaries
| ₹2.6 L/yr - ₹6.8 L/yr |
Quality Engineer
31
salaries
| ₹2 L/yr - ₹5 L/yr |
Service Engineer
30
salaries
| ₹2 L/yr - ₹6 L/yr |
Gilbarco Veeder Root
Kirloskar Toyota Textile Machinery
L&T–MHI Power Boilers
Hyundai Construction Equipment