I applied via Naukri.com and was interviewed before Jan 2024. There were 3 interview rounds.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
Involves regular maintenance, cleaning, and inspection of equipment
Encourages employee involvement and ownership of equipment maintenance
Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve
Scheduled maintenance is planned maintenance activities performed on a regular basis to prevent equipment failure and ensure optimal performance.
Scheduled maintenance involves creating a maintenance schedule based on manufacturer recommendations or industry best practices.
It includes tasks such as equipment inspections, lubrication, calibration, and replacement of worn parts.
Scheduled maintenance helps in identifying p...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
Involves regular maintenance, cleaning, and inspection of equipment
Encourages employee involvement and ownership of equipment maintenance
Uses tools like 5S, autonomous maintenance, and planned maintenance
Goal is to e...
CLITE stands for Closed Loop Interactive Training Environment.
CLITE is a system used for interactive training in various fields.
It provides a closed loop environment for users to practice and improve their skills.
Examples of CLITE systems include flight simulators for pilots and virtual reality training for medical professionals.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
Involves regular maintenance, cleaning, and inspection of equipment
Encourages employee involvement and ownership of equipment maintenance
Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve
CLITE stands for Closed Loop Interactive Training Environment.
CLITE is a type of training environment used in maintenance engineering.
It provides interactive simulations for hands-on learning.
Examples of CLITE systems include virtual reality training modules for equipment maintenance.
I appeared for an interview before Sep 2021.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Safety during confined space is crucial to prevent accidents and ensure the well-being of workers.
Proper training and education on confined space hazards
Use of personal protective equipment (PPE) such as respirators, harnesses, and gas detectors
Implementing a permit system to control access and monitor activities
Continuous monitoring of atmospheric conditions
Establishing emergency procedures and rescue plans
Regular equ...
I applied via Walk-in and was interviewed before Feb 2020. There were 3 interview rounds.
Soda Ash related equipment includes conveyors, crushers, screens, and calciners used in the production of sodium carbonate.
Conveyors are used to transport raw materials and finished products.
Crushers are used to break down large chunks of soda ash into smaller pieces.
Screens are used to separate different sizes of soda ash particles.
Calciners are used to heat and convert sodium bicarbonate into sodium carbonate.
Example...
Yes, I have knowledge of conveyor belts, grinding mills, kilns, and feed mixers.
I have experience in maintaining and repairing conveyor belts, including belt splicing and replacement.
I am familiar with the operation and maintenance of grinding mills, including lubrication and alignment.
I have worked with kilns, including troubleshooting and repairing issues with burners and refractory materials.
I have experience mainta...
Yes, I have extensive knowledge in maintaining rotary equipment.
I have experience in maintaining rotary pumps, compressors, and turbines.
I am familiar with troubleshooting and repairing rotary equipment.
I have knowledge in performing preventive maintenance on rotary equipment.
I am skilled in reading and interpreting technical manuals and schematics.
I have worked with various types of rotary equipment such as positive d...
Yes, I have knowledge and experience in welding, grinding, and cutting.
I have completed a welding course and have experience in MIG, TIG, and stick welding.
I am proficient in using various cutting tools such as plasma cutters, saws, and torches.
I have experience in grinding and polishing metal surfaces to a smooth finish.
I am familiar with safety procedures and protocols when working with these tools.
I follow a systematic approach to execute breakdown of equipment.
First, I identify the cause of the breakdown and assess the extent of damage.
Then, I refer to the equipment manual and troubleshoot the issue.
If necessary, I consult with other maintenance personnel or engineers.
I prioritize the repairs based on the impact on production and safety.
Finally, I execute the repairs and conduct tests to ensure the equipment is...
I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.
Assemble the components of the pneumatic compressor according to the manufacturer's instructions.
Connect the necessary piping for air intake, compression, and output.
Test the compressor for functionality by running it empty and check...
Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.
Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)
Maintenance practices include regular cleaning of cooling tower fil...
RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.
RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.
It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.
RCM prioritizes maintenanc...
Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.
Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.
Axial split casing pumps have a casing split along the horizontal centerline of the pump.
Radial split casing pumps have a casing split along the vertical centerline of the pump.
Air compressor works by compressing air to increase its pressure and decrease its volume.
Air is drawn into the compressor through an intake valve.
The air is then compressed using a piston or rotating impeller.
Compressed air is stored in a tank or released directly for use.
Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.
I applied via Naukri.com and was interviewed before Jul 2023. There were 2 interview rounds.
How to handle emergency.
Turbine rolling procedure involves carefully starting and stopping the turbine to prevent damage.
Ensure proper lubrication of bearings before starting the turbine.
Gradually increase the speed of the turbine to prevent sudden stress on the components.
Monitor temperature and vibration levels during the rolling procedure.
Follow manufacturer's guidelines for specific turbine rolling procedures.
Perform regular maintenance c
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
posted on 20 Jun 2024
The amount of amps a 30 kW motor takes depends on the voltage it is operating at.
The formula to calculate amps is: Amps = kW / (Volts * 1.73)
For example, a 30 kW motor operating at 480 volts would take approximately 36 amps
Higher voltage motors will draw fewer amps compared to lower voltage motors
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Teritory Sales Officer
920
salaries
| ₹5.5 L/yr - ₹12.5 L/yr |
Assistant Manager
652
salaries
| ₹11.9 L/yr - ₹29 L/yr |
Sales Executive
475
salaries
| ₹0.9 L/yr - ₹8 L/yr |
Marketing Executive
390
salaries
| ₹1.1 L/yr - ₹5.5 L/yr |
Key Accounts Executive
345
salaries
| ₹8.5 L/yr - ₹16.8 L/yr |
ITC
Dabur
RSPL Group
Nestle