Upload Button Icon Add office photos

Teva Pharmaceuticals

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Teva Pharmaceuticals Maintenance Engineer Interview Questions, Process, and Tips

Updated 24 Nov 2021

Teva Pharmaceuticals Maintenance Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1)which refrigeration cycle used in chilling plant?
  • Ans. 

    The refrigeration cycle used in a chilling plant is typically the vapor compression cycle.

    • The vapor compression cycle involves compressing refrigerant vapor to increase its temperature and pressure.

    • The high-pressure vapor then condenses into a liquid, releasing heat.

    • The liquid refrigerant then passes through an expansion valve, reducing its pressure and temperature.

    • The low-pressure liquid then evaporates, absorbing hea...

  • Answered by AI
  • Q2. 2)Draw a schematic diagram of simple vapour compression cycle and explain it
  • Ans. 

    A vapour compression cycle is a process used in refrigeration systems to remove heat from a space.

    • The cycle consists of four main components: a compressor, a condenser, an expansion valve, and an evaporator.

    • The compressor takes in low-pressure refrigerant gas and compresses it to high pressure.

    • The high-pressure gas then flows to the condenser, where it releases heat and condenses into a high-pressure liquid.

    • The liquid ...

  • Answered by AI
  • Q3. Which equipments used in pharma industries?
  • Q4. Is any breakdown come in your previous company? If any plz explain it.
  • Q5. Tell me preventive maintenance of reactor
  • Ans. 

    Preventive maintenance of a reactor involves regular inspection, cleaning, and replacement of parts to ensure safe and efficient operation.

    • Regular inspection of reactor components such as valves, pumps, and pipes

    • Cleaning of reactor surfaces to prevent buildup of contaminants

    • Replacement of worn or damaged parts to prevent equipment failure

    • Testing of safety systems to ensure proper function in case of emergency

    • Monitoring...

  • Answered by AI
  • Q6. Utility and process equipment capacity and make
  • Ans. 

    Utility and process equipment capacity and make

    • Provide details of all utility and process equipment installed in the facility

    • Include information on their capacity and make

    • Utility equipment may include HVAC, compressed air, water treatment, etc.

    • Process equipment may include reactors, distillation columns, pumps, etc.

  • Answered by AI
  • Q7. Gear box ratio
  • Q8. What is Air fuel ratio in boiler how you maintain it
  • Ans. 

    Air fuel ratio in boiler is the ratio of mass of air to mass of fuel. It is maintained by adjusting the fuel and air flow rates.

    • Air fuel ratio is critical for efficient combustion and minimizing emissions.

    • The ideal air fuel ratio for a boiler is typically between 1.5 and 2.5.

    • To maintain the air fuel ratio, the fuel and air flow rates must be adjusted based on the boiler load and combustion conditions.

    • Excess air can lea...

  • Answered by AI
  • Q9. Is any chemical treatment done in Colling tower? Which are those
  • Ans. 

    Yes, chemical treatment is done in cooling tower to prevent scaling, corrosion and biological growth.

    • Chemicals like biocides, scale inhibitors and corrosion inhibitors are added to the water in cooling tower.

    • Biocides are used to prevent the growth of bacteria, algae and fungi.

    • Scale inhibitors are used to prevent the formation of mineral deposits on the tower walls and heat exchangers.

    • Corrosion inhibitors are used to pr...

  • Answered by AI
  • Q10. Validation process
  • Q11. Hvac capacity and its motor size
  • Ans. 

    HVAC capacity and motor size are interdependent.

    • The HVAC capacity is determined by the size of the space it needs to cool or heat.

    • The motor size is determined by the HVAC capacity and the type of system being used.

    • For example, a small window AC unit may have a motor size of 1/6 horsepower, while a large central AC unit may have a motor size of 5 horsepower.

    • It is important to ensure that the motor size is appropriate fo...

  • Answered by AI
  • Q12. Types of valves draw a diagram of gate valve or ball valve
  • Ans. 

    Gate valves and ball valves are two common types of valves used in industrial applications.

    • Gate valves have a sliding gate that controls the flow of fluid through the valve.

    • Ball valves have a rotating ball with a hole in the middle that controls the flow of fluid through the valve.

    • Gate valves are typically used for on/off control of fluid flow, while ball valves are used for throttling and control applications.

    • Gate val...

  • Answered by AI
  • Q13. Do you handled any project?if yes then explain it
  • Q14. Do you done boiler passing,if yes then explain how it can be done
  • Ans. 

    Yes, I have experience in boiler passing. It involves a thorough inspection of the boiler to ensure its safe and efficient operation.

    • Boiler passing involves a visual inspection of the boiler's exterior and interior components.

    • The inspection includes checking for leaks, cracks, corrosion, and other signs of wear and tear.

    • The boiler's safety controls, valves, and gauges are also checked to ensure they are functioning pro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart to answer any question

Maintenance Engineer Jobs at Teva Pharmaceuticals

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic questions with respect to your role

Round 3 - Case Study 

Checkpoints during breakdown

Round 4 - Technical 

(2 Questions)

  • Q1. Machine principal
  • Q2. Installation and operation process
Round 5 - HR 

(1 Question)

  • Q1. Salary disscussion

Interview Preparation Tips

Topics to prepare for Abbott Maintenance Engineer interview:
  • Hr round is crucial
Interview preparation tips for other job seekers - Na

Interview Questionnaire 

2 Questions

  • Q1. How u trouble shoot on line ups when it break down..?
  • Q2. Pass..
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What was the current role and responsibilities
  • Q2. Technical knowledge on ticketing tools
Round 3 - Technical 

(1 Question)

  • Q1. Knowledge on GxP environment

I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How if mechanical engineering career goal objectives in mylan.
  • Ans. 

    The mechanical engineering career goal objectives in Mylan are focused on ensuring efficient maintenance operations and improving equipment reliability.

    • Developing and implementing preventive maintenance programs to minimize downtime

    • Identifying and resolving equipment malfunctions to optimize production

    • Collaborating with cross-functional teams to improve equipment design and performance

    • Implementing cost-saving initiativ...

  • Answered by AI
  • Q2. In mylan employees of engineers job is permanent or temporary.?

Interview Preparation Tips

Interview preparation tips for other job seekers - It's a great objectives goal ,with mechanical engineering relative job such as cad/cam, production engineer, quality engineers.

I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1)What is m25 ratio.? 2) what is steel density? 3) How to calculate steel weight? 4) What is plastering ratio? 5)How many bricks are in 1 cubic meters?
  • Ans. 

    Answers to questions related to construction and engineering.

    • 1) M25 ratio is a mix design ratio used in concrete construction.

    • 2) Steel density is the mass per unit volume of steel.

    • 3) Steel weight can be calculated by multiplying the volume of steel by its density.

    • 4) Plastering ratio refers to the proportion of cement and sand used in plastering.

    • 5) The number of bricks in 1 cubic meter depends on the size of the bricks.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free and listen questions care fully

I applied via Company Website and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Say about your self?
  • Q2. How many types pamps.?
  • Ans. 

    There are several types of pumps used in mechanical engineering.

    • Centrifugal pumps

    • Reciprocating pumps

    • Rotary pumps

    • Diaphragm pumps

    • Gear pumps

    • Vane pumps

    • Screw pumps

    • Jet pumps

    • Peristaltic pumps

    • Piston pumps

  • Answered by AI
  • Q3. Say the parts of pump
  • Ans. 

    The parts of a pump include impeller, casing, shaft, bearings, seals, and motor.

    • Impeller: Rotating component that imparts energy to the fluid.

    • Casing: Encloses the impeller and directs the flow of fluid.

    • Shaft: Transmits the rotational motion from the motor to the impeller.

    • Bearings: Support the shaft and reduce friction.

    • Seals: Prevent leakage of fluid along the shaft.

    • Motor: Provides the power to drive the pump.

  • Answered by AI
  • Q4. About salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Ya it's good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What was role in company
  • Ans. 

    I was responsible for designing and testing mechanical components for various projects.

    • Designed mechanical components for new products

    • Conducted testing and analysis to ensure functionality and safety

    • Collaborated with other engineers and departments to meet project goals

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Are you working any work location hyderabad or vizag?
Round 1 - Technical 

(1 Question)

  • Q1. Operator wfi and purified water sanitation passengers Raw water system ozone system allow systems
Round 2 - Case Study 
Round 3 - Technical 

(9 Questions)

  • Q1. Water system all system excellent warking my
  • Q2. Water system wfi and wfi generators
  • Q3. Pure steam generator all
  • Q4. P.w storage tank distrbution
  • Q5. Edi system ozone system
  • Q6. Ozone sanitation systems
  • Q7. Raw water system deam plant
  • Q8. Sterilization sanitation
  • Q9. All system leakages
  • Ans. 

    System leakages are a critical issue that needs to be addressed immediately.

    • System leakages can cause damage to equipment and pose safety risks to personnel.

    • Regular inspections and maintenance can help prevent system leakages.

    • Common causes of system leakages include corrosion, wear and tear, and improper installation.

    • Leak detection systems can be installed to quickly identify and address any leaks.

    • Proper training and e...

  • Answered by AI
Round 4 - Technical 

(6 Questions)

  • Q1. Operator operating all system
  • Q2. All monthly manitnce
  • Q3. All water system line modification
  • Ans. 

    Water system line modification involves changes to the piping network for improved efficiency and functionality.

    • Identify areas of the water system that require modification

    • Develop a plan for the modification process

    • Ensure compliance with safety and regulatory standards

    • Implement the modifications and test the system for functionality

    • Monitor the system for any issues post-modification

  • Answered by AI
  • Q4. All system sampling protocol
  • Ans. 

    System sampling protocol refers to the process of collecting and analyzing data from various systems to ensure their proper functioning.

    • Identify the systems that need to be sampled

    • Determine the frequency and duration of sampling

    • Establish the sampling method and equipment

    • Collect and analyze the data

    • Take corrective action if necessary

  • Answered by AI
  • Q5. All system RSTS and sopes
  • Q6. All system sopes warking

Interview Preparation Tips

Interview preparation tips for other job seekers - All system chemical safety

Skills evaluated in this interview

Teva Pharmaceuticals Interview FAQs

How to prepare for Teva Pharmaceuticals Maintenance Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Teva Pharmaceuticals. The most common topics and skills that interviewers at Teva Pharmaceuticals expect are Pharma, Equipment Maintenance, GMP, Maintenance Engineering and Instrumentation.
What are the top questions asked in Teva Pharmaceuticals Maintenance Engineer interview?

Some of the top questions asked at the Teva Pharmaceuticals Maintenance Engineer interview -

  1. 1)which refrigeration cycle used in chilling pla...read more
  2. What is Air fuel ratio in boiler how you maintain ...read more
  3. Is any chemical treatment done in Colling tower? Which are th...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Hetero Interview Questions
3.9
 • 230 Interviews
Abbott Interview Questions
4.1
 • 150 Interviews
Viatris Interview Questions
4.2
 • 139 Interviews
Piramal Pharma Interview Questions
4.0
 • 93 Interviews
Novo Nordisk Interview Questions
4.1
 • 83 Interviews
Sanofi Interview Questions
4.2
 • 74 Interviews
View all
Teva Pharmaceuticals Maintenance Engineer Salary
based on 25 salaries
₹2.4 L/yr - ₹8.4 L/yr
23% more than the average Maintenance Engineer Salary in India
View more details

Teva Pharmaceuticals Maintenance Engineer Reviews and Ratings

based on 6 reviews

2.9/5

Rating in categories

3.0

Skill development

2.9

Work-life balance

3.8

Salary

2.6

Job security

4.0

Company culture

3.3

Promotions

2.6

Work satisfaction

Explore 6 Reviews and Ratings
Executive
104 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Assistant Manager
101 salaries
unlock blur

₹7.4 L/yr - ₹20 L/yr

Regulatory Affairs Associate
84 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Senior Executive
81 salaries
unlock blur

₹4.6 L/yr - ₹11.4 L/yr

Senior Quality Specialist
79 salaries
unlock blur

₹3 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Teva Pharmaceuticals with

Hetero

3.9
Compare

Viatris

4.2
Compare

Abbott

4.1
Compare

Akums Drugs & Pharmaceuticals Limited

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview