Upload Button Icon Add office photos

Teva Pharmaceuticals

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Teva Pharmaceuticals Interview Questions, Process, and Tips

Updated 5 Apr 2025

Top Teva Pharmaceuticals Interview Questions and Answers

View all 62 questions

Teva Pharmaceuticals Interview Experiences

Popular Designations

89 interviews found

I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1)which refrigeration cycle used in chilling plant?
  • Ans. 

    The refrigeration cycle used in a chilling plant is typically the vapor compression cycle.

    • The vapor compression cycle involves compressing refrigerant vapor to increase its temperature and pressure.

    • The high-pressure vapor then condenses into a liquid, releasing heat.

    • The liquid refrigerant then passes through an expansion valve, reducing its pressure and temperature.

    • The low-pressure liquid then evaporates, absorbing hea...

  • Answered by AI
  • Q2. 2)Draw a schematic diagram of simple vapour compression cycle and explain it
  • Ans. 

    A vapour compression cycle is a process used in refrigeration systems to remove heat from a space.

    • The cycle consists of four main components: a compressor, a condenser, an expansion valve, and an evaporator.

    • The compressor takes in low-pressure refrigerant gas and compresses it to high pressure.

    • The high-pressure gas then flows to the condenser, where it releases heat and condenses into a high-pressure liquid.

    • The liquid ...

  • Answered by AI
  • Q3. Which equipments used in pharma industries?
  • Q4. Is any breakdown come in your previous company? If any plz explain it.
  • Q5. Tell me preventive maintenance of reactor
  • Ans. 

    Preventive maintenance of a reactor involves regular inspection, cleaning, and replacement of parts to ensure safe and efficient operation.

    • Regular inspection of reactor components such as valves, pumps, and pipes

    • Cleaning of reactor surfaces to prevent buildup of contaminants

    • Replacement of worn or damaged parts to prevent equipment failure

    • Testing of safety systems to ensure proper function in case of emergency

    • Monitoring...

  • Answered by AI
  • Q6. Utility and process equipment capacity and make
  • Ans. 

    Utility and process equipment capacity and make

    • Provide details of all utility and process equipment installed in the facility

    • Include information on their capacity and make

    • Utility equipment may include HVAC, compressed air, water treatment, etc.

    • Process equipment may include reactors, distillation columns, pumps, etc.

  • Answered by AI
  • Q7. Gear box ratio
  • Q8. What is Air fuel ratio in boiler how you maintain it
  • Ans. 

    Air fuel ratio in boiler is the ratio of mass of air to mass of fuel. It is maintained by adjusting the fuel and air flow rates.

    • Air fuel ratio is critical for efficient combustion and minimizing emissions.

    • The ideal air fuel ratio for a boiler is typically between 1.5 and 2.5.

    • To maintain the air fuel ratio, the fuel and air flow rates must be adjusted based on the boiler load and combustion conditions.

    • Excess air can lea...

  • Answered by AI
  • Q9. Is any chemical treatment done in Colling tower? Which are those
  • Ans. 

    Yes, chemical treatment is done in cooling tower to prevent scaling, corrosion and biological growth.

    • Chemicals like biocides, scale inhibitors and corrosion inhibitors are added to the water in cooling tower.

    • Biocides are used to prevent the growth of bacteria, algae and fungi.

    • Scale inhibitors are used to prevent the formation of mineral deposits on the tower walls and heat exchangers.

    • Corrosion inhibitors are used to pr...

  • Answered by AI
  • Q10. Validation process
  • Q11. Hvac capacity and its motor size
  • Ans. 

    HVAC capacity and motor size are interdependent.

    • The HVAC capacity is determined by the size of the space it needs to cool or heat.

    • The motor size is determined by the HVAC capacity and the type of system being used.

    • For example, a small window AC unit may have a motor size of 1/6 horsepower, while a large central AC unit may have a motor size of 5 horsepower.

    • It is important to ensure that the motor size is appropriate fo...

  • Answered by AI
  • Q12. Types of valves draw a diagram of gate valve or ball valve
  • Ans. 

    Gate valves and ball valves are two common types of valves used in industrial applications.

    • Gate valves have a sliding gate that controls the flow of fluid through the valve.

    • Ball valves have a rotating ball with a hole in the middle that controls the flow of fluid through the valve.

    • Gate valves are typically used for on/off control of fluid flow, while ball valves are used for throttling and control applications.

    • Gate val...

  • Answered by AI
  • Q13. Do you handled any project?if yes then explain it
  • Q14. Do you done boiler passing,if yes then explain how it can be done
  • Ans. 

    Yes, I have experience in boiler passing. It involves a thorough inspection of the boiler to ensure its safe and efficient operation.

    • Boiler passing involves a visual inspection of the boiler's exterior and interior components.

    • The inspection includes checking for leaks, cracks, corrosion, and other signs of wear and tear.

    • The boiler's safety controls, valves, and gauges are also checked to ensure they are functioning pro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart to answer any question

Top Teva Pharmaceuticals Maintenance Engineer Interview Questions and Answers

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)

Maintenance Engineer Interview Questions asked at other Companies

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I appeared for an interview in Dec 2024.

Round 1 - Aptitude Test 

What are you doing for coustom satisfaction in Quality

Round 2 - Technical 

(2 Questions)

  • Q1. What is doing for Total productivity maintenance
  • Ans. 

    Total Productive Maintenance (TPM) focuses on maximizing the effectiveness of equipment and minimizing downtime.

    • Implementing preventive maintenance schedules

    • Training employees on equipment maintenance

    • Involving operators in maintenance activities

    • Setting up autonomous maintenance teams

    • Continuous improvement through Kaizen events

  • Answered by AI
  • Q2. What is Root cause and how many classified it
  • Ans. 

    Root cause is the underlying reason for a problem or issue, and there are typically classified into different categories.

    • Root cause is the fundamental reason behind a problem or issue.

    • It is important to identify the root cause in order to prevent the issue from recurring.

    • Root causes are often classified into categories such as human error, equipment failure, or process deficiencies.

    • For example, if a power outage occurs...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Better technical support for job seekers

Utility Manager Interview Questions asked at other Companies

Q1. How many chillers you have handed with what capacity
View answer (3)

Interview Questions & Answers

user image Anonymous

posted on 4 Oct 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About GMP and what is GMP.
  • Q2. About Powder Processing Area
Round 2 - Technical 

(2 Questions)

  • Q1. About Utility and its types.
  • Q2. Batch charging process safety precautions
  • Ans. 

    Batch charging process safety precautions are essential to prevent accidents and ensure product quality.

    • Ensure proper training for personnel handling batch charging process

    • Implement strict adherence to safety protocols and procedures

    • Regularly inspect equipment for any signs of wear or damage

    • Use appropriate personal protective equipment (PPE) at all times

    • Have emergency response plan in place in case of accidents or spil

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduction and about our family members.
  • Q2. About batch process
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. To define my role as writer
  • Q2. My very challenging situation and how was it solved
Round 2 - Group Discussion 

Inwas asked to present a topic

Round 3 - HR 

(1 Question)

  • Q1. Policies and expectations

Medical Writer Interview Questions asked at other Companies

Q1. How many phases are there in clinical trial and explain them in brief.
View answer (1)

Teva Pharmaceuticals interview questions for popular designations

 Production Chemist

 (3)

 Group Leader

 (3)

 Research Scientist

 (3)

 QC Officer

 (2)

 Quality Specialist

 (2)

 Quality Technician

 (2)

 Executive

 (2)

 Assistant Manager - Production

 (2)

Group Leader Interview Questions & Answers

user image JANARDHAN KARRA

posted on 23 Jan 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2024.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Subject related questions
  • Q2. Good experience
  • Q3. All live experience questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. Great experience
  • Q2. D365 Finance and Operations consultant

Group Leader Interview Questions asked at other Companies

Q1. If we are getting 35000 volumes for a week with 8 FTEs & 8.5 working hrs for each employee what will be the Time taken for each bill
View answer (4)

Get interview-ready with Top Teva Pharmaceuticals Interview Questions

Trainee Interview Questions & Answers

user image Amit Thakur

posted on 19 Jan 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Reasoning, English, Chemistry

Round 2 - Technical 

(4 Questions)

  • Q1. Basic chemistry
  • Q2. Uv Principal explain
  • Ans. 

    The UV Principal explains the concept of ultraviolet (UV) radiation and its properties.

    • UV radiation is a type of electromagnetic radiation with a shorter wavelength than visible light.

    • UV radiation is divided into three categories: UVA, UVB, and UVC.

    • UV radiation can have both positive (e.g. vitamin D synthesis) and negative (e.g. skin damage) effects on humans.

    • UV radiation is commonly used in sterilization processes and

  • Answered by AI
  • Q3. Molecule weight
  • Q4. Aqueous and non aqueous solution
Round 3 - HR 

(1 Question)

  • Q1. Salary discuss, your cl , about company etc

Trainee Interview Questions asked at other Companies

Q1. Ques1: There is a big file of words which is dynamically changing. We are continuously adding some words into it. How would you keep track of top 10 trending words at each moment? Ques2:Write a function that returns the length of the longes... read more
View answer (2)

Jobs at Teva Pharmaceuticals

View all
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What are the regulatory requirements
  • Q2. What is your hobby
  • Q3. Why you want to leave the current job

Regulatory Affairs Officer Interview Questions asked at other Companies

Q1. What are regulatory requirements for medical devices?
Add answer
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Tell me about your self
  • Q2. What is your work role

Production Chemist Interview Questions asked at other Companies

Q1. What is the caps and change control
View answer (21)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question regarding protocol and report preparation
  • Q2. Question about regulatory requirements for the preparation of protocol and report
Round 2 - HR 

(1 Question)

  • Q1. CTC discussion and feedback

Research Associate Interview Questions asked at other Companies

Q1. Tell any name reactions to form new c-c bond without metal catalyst?
View answer (15)

Draughtsman Interview Questions & Answers

user image Nishant kumar

posted on 7 Jun 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Type of reactors
  • Ans. 

    Different types of reactors used in various industries for different processes.

    • Batch reactor - used for small-scale production and reactions that need to be closely monitored

    • Continuous stirred-tank reactor (CSTR) - used for continuous production with constant flow rates

    • Plug flow reactor - used for reactions with high conversion rates and minimal back-mixing

    • Packed bed reactor - used for catalytic reactions and gas-solid...

  • Answered by AI
  • Q2. What is that name of line between dish and maintenance shall
  • Ans. 

    The name of the line between dish and maintenance shall is called the 'center line'.

    • The center line is used in technical drawings to indicate the center of an object or component.

    • It helps in ensuring symmetry and proper alignment of parts during manufacturing and assembly.

    • Examples of where the center line is used include drawings of shafts, cylinders, and symmetrical objects.

  • Answered by AI
Round 2 - Assignment 

Create a new p&I'd with details

Round 3 - Case Study 

Simbol of p&id for pipe line

Draughtsman Interview Questions asked at other Companies

Q1. 3.Have you make Spare parts development of mechanical equipment
View answer (4)

Production Manager Interview Questions & Answers

user image Rupesh c gawas

posted on 30 Jan 2025

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Cost reductions for product and increase sales product
  • Ans. 

    To reduce costs for a product and increase sales, focus on improving efficiency, streamlining processes, negotiating better deals with suppliers, and implementing effective marketing strategies.

    • Identify areas where costs can be reduced without compromising quality

    • Streamline production processes to improve efficiency

    • Negotiate better deals with suppliers to lower costs of raw materials

    • Implement effective marketing strate...

  • Answered by AI

Production Manager Interview Questions asked at other Companies

Q1. Production, Maintenance, Quality and Safety. Out of four, tell me the most important and least important thing for you and why?
View answer (10)

Teva Pharmaceuticals Interview FAQs

How many rounds are there in Teva Pharmaceuticals interview?
Teva Pharmaceuticals interview process usually has 2-3 rounds. The most common rounds in the Teva Pharmaceuticals interview process are Technical, HR and Resume Shortlist.
How to prepare for Teva Pharmaceuticals interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Teva Pharmaceuticals. The most common topics and skills that interviewers at Teva Pharmaceuticals expect are Pharma, Networking, HR, Research and Analytical.
What are the top questions asked in Teva Pharmaceuticals interview?

Some of the top questions asked at the Teva Pharmaceuticals interview -

  1. 1)which refrigeration cycle used in chilling pla...read more
  2. What is Air fuel ratio in boiler how you maintain ...read more
  3. Is any chemical treatment done in Colling tower? Which are th...read more
How long is the Teva Pharmaceuticals interview process?

The duration of Teva Pharmaceuticals interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Teva Pharmaceuticals Interview Process

based on 93 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Hetero Interview Questions
3.9
 • 231 Interviews
Abbott Interview Questions
4.1
 • 150 Interviews
Viatris Interview Questions
4.1
 • 140 Interviews
Piramal Pharma Interview Questions
4.0
 • 93 Interviews
Novo Nordisk Interview Questions
4.1
 • 83 Interviews
Sanofi Interview Questions
4.2
 • 74 Interviews
View all

Teva Pharmaceuticals Reviews and Ratings

based on 1.3k reviews

4.0/5

Rating in categories

3.7

Skill development

4.0

Work-life balance

3.7

Salary

3.8

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 1.3k Reviews and Ratings
Manager Fp&A

Mumbai

5-10 Yrs

Not Disclosed

Sr. Manager - Direct & Indirect Tax

Mumbai

9-14 Yrs

Not Disclosed

Sr Manager HR

Bangalore / Bengaluru

8-13 Yrs

Not Disclosed

Explore more jobs
Executive
104 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Assistant Manager
99 salaries
unlock blur

₹7.4 L/yr - ₹20 L/yr

Regulatory Affairs Associate
84 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Senior Quality Specialist
83 salaries
unlock blur

₹3 L/yr - ₹9.5 L/yr

Senior Executive
80 salaries
unlock blur

₹4.6 L/yr - ₹11.4 L/yr

Explore more salaries
Compare Teva Pharmaceuticals with

Hetero

3.9
Compare

Viatris

4.1
Compare

Abbott

4.1
Compare

Akums Drugs & Pharmaceuticals Limited

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview