H.G. Infra Engineering Planning Engineer Interview Questions and Answers

Updated 23 Jan 2025

H.G. Infra Engineering Planning Engineer Interview Experiences

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is S- Curv in Primavera ?
  • Ans. 

    S-Curve in Primavera is a graphical representation of project progress over time.

    • S-Curve shows the planned and actual progress of a project.

    • It helps in visualizing the project's performance and identifying any deviations from the plan.

    • The curve is shaped like an 'S' due to the gradual increase in progress at the beginning and end, with a steeper slope in the middle.

    • The x-axis represents time, and the y-axis represents ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is which you are looking for in our organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be crisp to your answer and tell the truth what is correct rest will be taken care
Interview experience
-
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2018. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Salary Expectation?
  • Q2. How early you can join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare job specific answers

I was interviewed in Jan 2022.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What about you privious experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Working on WBS and ACE for civil construction
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via LinkedIn and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. Time limited schedule vs Resource limited schedule
  • Ans. 

    Time limited schedule focuses on completing the project within a specific deadline while resource limited schedule focuses on utilizing available resources efficiently.

    • Time limited schedule is ideal for projects with strict deadlines

    • Resource limited schedule is ideal for projects with limited resources

    • Time limited schedule may require additional resources to meet the deadline

    • Resource limited schedule may require extend...

  • Answered by AI
  • Q2. How Float affects schedule?
  • Ans. 

    Float is the amount of time an activity can be delayed without affecting the project end date.

    • Float helps in identifying critical and non-critical activities in a project schedule.

    • Activities with zero float are critical and must be completed on time to avoid project delays.

    • Activities with positive float can be delayed without affecting the project end date.

    • Activities with negative float indicate that the project end da...

  • Answered by AI
  • Q3. Free Float vs Total Float
  • Ans. 

    Free float is the amount of time an activity can be delayed without delaying the early start of the next activity. Total float is the amount of time an activity can be delayed without delaying the project end date.

    • Free float is specific to an activity and is calculated by subtracting the early start of the next activity from the early finish of the current activity.

    • Total float is the difference between the project end ...

  • Answered by AI
  • Q4. What are the steps to develop a complete schedule in Primavera?
  • Ans. 

    Developing a complete schedule in Primavera involves several steps.

    • Define project scope and objectives

    • Break down the project into smaller tasks and activities

    • Determine the sequence of activities and their dependencies

    • Estimate the duration of each activity

    • Assign resources to each activity

    • Create a network diagram

    • Enter the data into Primavera software

    • Review and adjust the schedule as needed

  • Answered by AI
  • Q5. Differences between Prospective and Retrospective DA
  • Ans. 

    Prospective DA is done before a project starts while retrospective DA is done after the project is completed.

    • Prospective DA is done to identify potential risks and plan mitigation strategies.

    • Retrospective DA is done to evaluate the effectiveness of risk mitigation strategies and identify areas for improvement.

    • Prospective DA is proactive while retrospective DA is reactive.

    • Examples of prospective DA include risk assessme...

  • Answered by AI
  • Q6. Productivity rates for current project
  • Ans. 

    Productivity rates for the current project are within the expected range.

    • Productivity rates are being monitored regularly

    • The team is meeting the project deadlines

    • Efficient use of resources is being ensured

    • No major delays or setbacks have been reported

  • Answered by AI
  • Q7. Schedule Comparison in P6
  • Ans. 

    Schedule Comparison in P6

    • Schedule comparison in P6 involves comparing two or more schedules to identify differences and similarities

    • This can be done using the 'Compare Project' feature in P6

    • Users can compare schedules based on activities, resources, WBS, and more

    • The comparison results can be viewed in a report format or as a Gantt chart

    • This feature is useful for identifying changes in the schedule and analyzing the imp

  • Answered by AI
  • Q8. Basic concept of Primavera

Interview Preparation Tips

Topics to prepare for Consulting Engineers Group Junior Planning Engineer interview:
  • Primavera
  • Delay Analysis
Interview preparation tips for other job seekers - If the Client is taking the Interview then you have to have a moderate to advance level understanding of Primavera and Delay Analysis

I applied via LinkedIn and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is Balance Budget?
  • Ans. 

    A balanced budget is a financial plan where income equals expenses, resulting in no deficit or surplus.

    • A balanced budget ensures that a company or government does not spend more than it earns.

    • It requires careful planning and monitoring of income and expenses.

    • A balanced budget can help maintain financial stability and prevent debt accumulation.

    • Examples of balanced budgets include when a government's total revenue matche...

  • Answered by AI
  • Q2. What is MIS? and how it prepare.
  • Ans. 

    MIS stands for Management Information System. It is a computer-based system that provides information for decision-making.

    • MIS collects, processes, and stores data from various sources.

    • It generates reports and provides analysis to support decision-making.

    • MIS can be used in various industries such as healthcare, finance, and manufacturing.

    • Examples of MIS software include SAP, Oracle, and Microsoft Dynamics.

    • MIS can help o...

  • Answered by AI
  • Q3. What is Cashflow? what are the use of it?
  • Ans. 

    Cashflow is the movement of money in and out of a business. It is used to track and manage financial resources.

    • Cashflow is the net amount of cash and cash equivalents that flow in and out of a business.

    • It is important for businesses to manage their cashflow to ensure they have enough funds to pay their bills and invest in growth.

    • Cashflow can be positive (more money coming in than going out) or negative (more money goin...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Ahluwalia Contracts India Senior Planning Engineer interview:
  • cashflow
  • MIS
  • Budgeting
  • Scheduling
  • Master Scheduling
Interview preparation tips for other job seekers - You have to prepare for Cashflow,MIS, Balance Baudget. Zero Budget etc.

I applied via Referral and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basic question asked in interview.
  • Q2. What is the weight of steel, grade of concrete, productivity of equipment
  • Ans. 

    The weight of steel, grade of concrete, and productivity of equipment depend on the specific project requirements and design.

    • The weight of steel varies depending on the type and size of the steel used in the project.

    • The grade of concrete is determined by the strength and durability required for the project.

    • The productivity of equipment depends on the type and size of the equipment used, as well as the skill level of th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge of civil
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Site location work

Interview Preparation Tips

Interview preparation tips for other job seekers - Construction experience is necessary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is which you are looking for in our organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be crisp to your answer and tell the truth what is correct rest will be taken care

H.G. Infra Engineering Interview FAQs

How many rounds are there in H.G. Infra Engineering Planning Engineer interview?
H.G. Infra Engineering interview process usually has 1 rounds. The most common rounds in the H.G. Infra Engineering interview process are Technical.
What are the top questions asked in H.G. Infra Engineering Planning Engineer interview?

Some of the top questions asked at the H.G. Infra Engineering Planning Engineer interview -

  1. Rob and Rub full f...read more
  2. Types of gir...read more

Tell us how to improve this page.

H.G. Infra Engineering Planning Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
H.G. Infra Engineering Planning Engineer Salary
based on 12 salaries
₹4 L/yr - ₹6.5 L/yr
29% less than the average Planning Engineer Salary in India
View more details

H.G. Infra Engineering Planning Engineer Reviews and Ratings

based on 7 reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

4.5

Salary

4.2

Job security

4.0

Company culture

4.3

Promotions

3.7

Work satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
118 salaries
unlock blur

₹4.2 L/yr - ₹13.2 L/yr

Senior Engineer
93 salaries
unlock blur

₹4.1 L/yr - ₹8.7 L/yr

Assistant Engineer
76 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Engineer
66 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Structural Engineer
64 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare H.G. Infra Engineering with

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview