I applied via Referral and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basic question asked in interview.
  • Q2. What is the weight of steel, grade of concrete, productivity of equipment
  • Ans. 

    The weight of steel, grade of concrete, and productivity of equipment depend on the specific project requirements and design.

    • The weight of steel varies depending on the type and size of the steel used in the project.

    • The grade of concrete is determined by the strength and durability required for the project.

    • The productivity of equipment depends on the type and size of the equipment used, as well as the skill level of th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge of civil

Interview questions from similar companies

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Interview Questionnaire 

    2 Questions

    • Q1. Causes of accident
    • Ans. 

      Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

      • Human error: Mistakes or negligence by individuals involved in the project.

      • Equipment failure: Malfunction or breakdown of machinery or tools.

      • Environmental conditions: Adverse weather, natural disasters, or other external factors.

      • Lack of safety measures: Insufficient safety protocols o...

    • Answered by AI
    • Q2. 1. Unsufficient maintenance of machinery.
    • Ans. 

      Insufficient maintenance of machinery can lead to breakdowns and production delays.

      • Regular maintenance schedules should be established and followed.

      • Proper training should be provided to operators and maintenance personnel.

      • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

      • Examples: oil changes, lubrication, cleaning, calibration, inspections.

      • Failure to maintain...

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident only

    I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Tell us how would you behave in a difficult situation with a client
    • Q2. Why do you want to work with us

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Study the questions prior the interview. Relax ad think before questions

    Interview Questionnaire 

    1 Question

    • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently
    Interview experience
    4
    Good
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Technical 

    (2 Questions)

    • Q1. Outer dia of HDPE pipe and specifications
    • Ans. 

      The outer diameter of HDPE pipe varies based on the intended use and specifications.

      • HDPE pipes are available in a range of sizes from 16mm to 2000mm.

      • The outer diameter of HDPE pipe is typically larger than the inner diameter.

      • The thickness of the pipe wall also varies based on the intended use and pressure requirements.

      • HDPE pipes are commonly used for water supply, gas distribution, and sewage systems.

    • Answered by AI
    • Q2. Work process how to handle contractor and local people how to exicute SOP
    • Ans. 

      To handle contractors and local people, we follow a structured process and execute SOPs.

      • We establish clear communication channels with contractors and local people.

      • We ensure that all parties understand the project goals and objectives.

      • We provide training and support to contractors and local people on the SOPs.

      • We monitor and evaluate the performance of contractors and local people regularly.

      • We address any issues or conc...

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident
    Interview experience
    5
    Excellent
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - One-on-one 

    (3 Questions)

    • Q1. Asked technical questions
    • Q2. What is the bulk modulus
    • Ans. 

      Bulk modulus is a measure of a material's resistance to compression under pressure.

      • It is a measure of a material's compressibility

      • It is defined as the ratio of change in pressure to the fractional volume compression

      • It is used in the study of elasticity and fluid mechanics

      • Examples of materials with high bulk modulus include diamond and steel

      • Examples of materials with low bulk modulus include rubber and foam

    • Answered by AI
    • Q3. Why there is G constant during bulling of sand
    • Ans. 

      G constant is required during sand bulking to account for the change in volume due to the presence of air voids.

      • G constant is used to calculate the volume of sand when it is in a loose state.

      • The presence of air voids in sand causes it to increase in volume, which is known as bulking.

      • The amount of bulking depends on the moisture content and the type of sand.

      • G constant is determined experimentally by comparing the volume...

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Offer ketter was received after 3 months, lost all hopes during thse three montha so started searching for another job and got selected in foreign

    Interview Questionnaire 

    1 Question

    • Q1. Technical question

    I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

    Interview Questionnaire 

    1 Question

    • Q1. All question based on past work experiences.

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

    I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

    Interview Questionnaire 

    1 Question

    • Q1. About the background

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Please have good job knowledge

    Patel Engineering Interview FAQs

    What are the top questions asked in Patel Engineering Project Planning Engineer interview?

    Some of the top questions asked at the Patel Engineering Project Planning Engineer interview -

    1. What is the weight of steel, grade of concrete, productivity of equipme...read more
    2. Basic question asked in intervie...read more

    Tell us how to improve this page.

    Patel Engineering Project Planning Engineer Salary
    based on 4 salaries
    ₹6.5 L/yr - ₹7 L/yr
    At par with the average Project Planning Engineer Salary in India
    View more details

    Patel Engineering Project Planning Engineer Reviews and Ratings

    based on 1 review

    5.0/5

    Rating in categories

    5.0

    Skill development

    5.0

    Work-life balance

    4.0

    Salary

    5.0

    Job security

    5.0

    Company culture

    5.0

    Promotions

    5.0

    Work satisfaction

    Explore 1 Review and Rating
    Project Engineer
    140 salaries
    unlock blur

    ₹4 L/yr - ₹9.9 L/yr

    Assistant Manager
    75 salaries
    unlock blur

    ₹5.5 L/yr - ₹13.4 L/yr

    Civil Engineer
    63 salaries
    unlock blur

    ₹2.9 L/yr - ₹6.6 L/yr

    Mechanical Engineer
    43 salaries
    unlock blur

    ₹1.8 L/yr - ₹7.2 L/yr

    Surveyor
    34 salaries
    unlock blur

    ₹2.4 L/yr - ₹6.6 L/yr

    Explore more salaries
    Compare Patel Engineering with

    L&T Construction

    4.0
    Compare

    Simplex Infrastructures

    3.4
    Compare

    ITD Cementation India

    4.3
    Compare

    Ashoka Buildcon

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview