I applied via LinkedIn and was interviewed in Nov 2022. There were 2 interview rounds.
Time limited schedule focuses on completing the project within a specific deadline while resource limited schedule focuses on utilizing available resources efficiently.
Time limited schedule is ideal for projects with strict deadlines
Resource limited schedule is ideal for projects with limited resources
Time limited schedule may require additional resources to meet the deadline
Resource limited schedule may require extend...
Float is the amount of time an activity can be delayed without affecting the project end date.
Float helps in identifying critical and non-critical activities in a project schedule.
Activities with zero float are critical and must be completed on time to avoid project delays.
Activities with positive float can be delayed without affecting the project end date.
Activities with negative float indicate that the project end da...
Free float is the amount of time an activity can be delayed without delaying the early start of the next activity. Total float is the amount of time an activity can be delayed without delaying the project end date.
Free float is specific to an activity and is calculated by subtracting the early start of the next activity from the early finish of the current activity.
Total float is the difference between the project end ...
Developing a complete schedule in Primavera involves several steps.
Define project scope and objectives
Break down the project into smaller tasks and activities
Determine the sequence of activities and their dependencies
Estimate the duration of each activity
Assign resources to each activity
Create a network diagram
Enter the data into Primavera software
Review and adjust the schedule as needed
Prospective DA is done before a project starts while retrospective DA is done after the project is completed.
Prospective DA is done to identify potential risks and plan mitigation strategies.
Retrospective DA is done to evaluate the effectiveness of risk mitigation strategies and identify areas for improvement.
Prospective DA is proactive while retrospective DA is reactive.
Examples of prospective DA include risk assessme...
Productivity rates for the current project are within the expected range.
Productivity rates are being monitored regularly
The team is meeting the project deadlines
Efficient use of resources is being ensured
No major delays or setbacks have been reported
Schedule Comparison in P6
Schedule comparison in P6 involves comparing two or more schedules to identify differences and similarities
This can be done using the 'Compare Project' feature in P6
Users can compare schedules based on activities, resources, WBS, and more
The comparison results can be viewed in a report format or as a Gantt chart
This feature is useful for identifying changes in the schedule and analyzing the imp
Top trending discussions
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
To check waterproofing area, follow these procedures
Inspect the surface for cracks or gaps
Ensure proper slope for drainage
Apply primer before waterproofing
Use appropriate waterproofing material
Check for leaks after application
Perform regular maintenance
Examples: bituminous coating, polyurethane coating, cementitious coating
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
IS code for concrete cube casting is IS 516:1959
IS 516:1959 is the code for methods of tests for strength of concrete
It specifies the procedure for making and curing concrete test specimens
The standard size of the cube for casting is 150mm x 150mm x 150mm
The cubes are casted in three layers and each layer is compacted 25 times using a standard tamping rod
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
Site Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
TCE
AECOM
Jacobs Engineering Group
WSP