I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
Pile cut off length is the length at which a pile is cut to the required level.
Pile cut off length is determined based on the design requirements and site conditions.
It is important to ensure that the pile is cut off at the correct length to provide adequate support.
Factors such as soil conditions, load requirements, and construction specifications influence the pile cut off length.
Mix design procedure involves determining the proportions of ingredients to produce concrete with desired properties.
Determine the required strength and durability of the concrete
Select suitable materials based on availability and properties
Calculate the proportions of cement, aggregates, water, and admixtures
Perform trial mixes to optimize the mix design
Follow relevant standards and guidelines such as ACI, ASTM, or BS
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Site Engineer
128
salaries
| ₹2.1 L/yr - ₹8.4 L/yr |
Civil Site Engineer
69
salaries
| ₹3.5 L/yr - ₹8.6 L/yr |
Assistant Manager
61
salaries
| ₹4 L/yr - ₹12 L/yr |
Section Engineer
37
salaries
| ₹9 L/yr - ₹22 L/yr |
Quantity Surveyor
37
salaries
| ₹5.3 L/yr - ₹14.5 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon