i
Crescon Projects & Services
Filter interviews by
QA/QC stands for Quality Assurance/Quality Control. It involves processes and procedures to ensure products or services meet quality standards.
QA focuses on preventing defects in the product development process.
QC focuses on identifying defects in the finished product.
QA/QC involves testing, inspections, audits, and documentation.
Examples include software testing, manufacturing inspections, and construction quality che
The slump test is used to measure the workability of concrete by determining the consistency and flow of the mixture.
The slump test helps ensure that the concrete mix has the right amount of water for proper hydration and strength.
It is a simple and quick test that involves filling a cone-shaped mold with concrete, then removing the mold to see how much the mixture slumps or settles.
The results of the slump test can in...
Crescon Projects & Services interview questions for popular designations
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Process in construction refers to the sequence of activities and tasks involved in completing a construction project.
Process in construction includes planning, scheduling, procurement, execution, monitoring, and closing out of a project.
Each step in the process is crucial for the successful completion of the project.
For example, planning involves creating a detailed project plan outlining the scope, schedule, budget, a...
I applied via Referral and was interviewed in Aug 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Refrigeration cycles are processes that remove heat from a space and transfer it elsewhere.
The vapor compression cycle is the most common refrigeration cycle used in HVAC systems.
The absorption cycle uses a refrigerant that is absorbed into a solution and then released through heat.
The steam jet cycle uses steam to create a vacuum and remove heat from a space.
The air cycle uses compressed air to cool a space.
The thermo...
HEPA filters are used in clean room applications with a minimum efficiency of 99.97% for particles as small as 0.3 microns.
HEPA filters are commonly used in clean room applications
HEPA filters have a minimum efficiency of 99.97% for particles as small as 0.3 microns
ULPA filters are also used in some clean room applications and have a minimum efficiency of 99.999% for particles as small as 0.12 microns
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
I applied via Job Portal and was interviewed before Feb 2022. There were 2 interview rounds.
HVAC stands for Heating, Ventilation, and Air Conditioning. DX is Direct Expansion. Cooling tower and chiller are used for cooling. FCU is Fan Coil Unit. AHU is Air Handling Unit. Pipes are used for transporting fluids.
HVAC is a system used for heating, ventilation, and air conditioning in buildings.
DX is a type of HVAC system that uses direct expansion to cool air.
Cooling towers and chillers are used to cool water tha...
Top trending discussions
Interview experience
based on 101 reviews
Rating in categories
Project Engineer
20
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
QA QC Engineer
16
salaries
| ₹2 L/yr - ₹6 L/yr |
Safety Officer
14
salaries
| ₹2.9 L/yr - ₹4.6 L/yr |
HR Executive
9
salaries
| ₹2 L/yr - ₹4 L/yr |
Senior Project Engineer
7
salaries
| ₹5.8 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
GMR Group