Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Crescon Projects & Services Team. If you also belong to the team, you can get access from here

Crescon Projects & Services Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 102 Reviews

Filter interviews by

Crescon Projects & Services ELV Project Engineer Interview Questions and Answers

Updated 31 Jul 2022

Crescon Projects & Services ELV Project Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Types of Fire Alarm Systems with Elaborate explanation.
  • Ans. 

    There are mainly four types of fire alarm systems: Conventional, Addressable, Analog, and Wireless.

    • Conventional fire alarm systems are the most basic and cost-effective systems.

    • Addressable fire alarm systems are more advanced and can pinpoint the exact location of the fire.

    • Analog fire alarm systems are similar to addressable systems but can also detect changes in the environment that may indicate a fire.

    • Wireless fire a...

  • Answered by AI
  • Q2. How to find out device coverages?
  • Ans. 

    Device coverages can be found by analyzing network coverage maps and conducting field tests.

    • Analyze network coverage maps provided by service providers

    • Conduct field tests to determine signal strength and coverage

    • Consider factors such as terrain, building materials, and weather conditions

    • Use specialized tools such as signal meters and spectrum analyzers

    • Consult with experts in the field for guidance and advice

  • Answered by AI
  • Q3. Basics of Fire Sprinkler systems.
  • Q4. What are the steps to follow before commissioning fire alarm panel?
  • Ans. 

    Steps to follow before commissioning fire alarm panel

    • Ensure all devices are installed and wired correctly

    • Verify that the programming is correct and matches the building's layout

    • Perform a full system test to ensure all devices are communicating properly

    • Train building staff on how to operate the system and respond to alarms

    • Obtain necessary permits and approvals from local authorities

    • Ensure all documentation is complete a

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Job location will be in all over India
  • Q2. Salary package questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work. Employees are friendly.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Where do the crack develop in the beam
  • Ans. 

    Cracks in beams typically develop at locations of high stress concentrations or due to external factors like corrosion.

    • Cracks can develop at the supports of the beam where the bending moment is highest.

    • Cracks can also form at locations where there are changes in cross-section or material properties.

    • External factors like corrosion can lead to cracks in beams over time.

    • Cracks may also develop at locations where there are...

  • Answered by AI
  • Q2. Different types of slab concrete testing
  • Ans. 

    Different types of slab concrete testing include slump test, air content test, compressive strength test, and flexural strength test.

    • Slump test measures the consistency and workability of concrete.

    • Air content test determines the amount of air trapped in the concrete mixture.

    • Compressive strength test assesses the ability of concrete to withstand loads.

    • Flexural strength test evaluates the bending strength of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and give your best
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Project management related questions
Round 2 - Technical 

(1 Question)

  • Q1. Project management
Round 3 - HR 

(1 Question)

  • Q1. General HR questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Assignment 

Make a some question.

Round 2 - Group Discussion 

Discus with condidate for how to handle a challenge at site level

Interview Preparation Tips

Interview preparation tips for other job seekers - No advice for any processes for interview
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous company name,
  • Ans. Shapoorji pallonji and company private limited
  • Answered by DARSHAN N
Round 3 - Technical 

(10 Questions)

  • Q1. About the previous project
  • Q2. All civil execution questions
  • Q3. About the mivan shuttering
  • Q4. About the rate analysis
  • Q5. About the bar bending
  • Q6. Current market labour rate and material price
  • Ans. 

    The current market labour rate and material price can vary depending on location, demand, and supply.

    • Labour rates can be influenced by factors such as skill level, experience, and union agreements.

    • Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.

    • It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater

  • Answered by AI
  • Q7. Quality assurance and control
  • Q8. Cast controlling and micro schedule
  • Q9. Project men material tools equipments management
  • Q10. Structural and finishing
Round 4 - Salary  

(3 Questions)

  • Q1. What's your current salary
  • Q2. What's your expectations
  • Q3. How soon can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Assignment 

Details about work responsibilities and Work experience improvement

Round 3 - Technical 

(2 Questions)

  • Q1. Planning strategies, work responsibilities, SAP related questions
  • Q2. What was your achievements in your career
  • Ans. 

    I have achieved significant milestones in my career as a Project Engineer.

    • Successfully completed a complex construction project within the given timeline and budget.

    • Implemented innovative strategies to improve project efficiency and reduce costs.

    • Received recognition for outstanding problem-solving skills and ability to handle challenging situations.

    • Led a team of engineers and technicians to successfully deliver multipl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Relax in interview, be calm, General question will be asked on your experiences
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Sector based questions, similar to job oriented
Round 3 - One-on-one 

(1 Question)

  • Q1. Like case studies, or situational task
Round 4 - HR 

(1 Question)

  • Q1. About personal and professional expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - show best professionalism in order to crack the interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Explain the project lifecycle
  • Ans. 

    The project lifecycle is the series of phases a project goes through from initiation to completion.

    • Initiation: Define project goals, scope, and stakeholders

    • Planning: Create a detailed project plan, schedule, and budget

    • Execution: Implement the project plan and deliver the project

    • Monitoring and Controlling: Track progress, manage changes, and ensure quality

    • Closing: Finalize all project activities and hand off deliverable

  • Answered by AI
  • Q2. What was your role and contribution to the project
  • Q3. What are the contents of model reviews
  • Ans. 

    Model reviews typically include checking for accuracy, completeness, consistency, and compliance with standards.

    • Checking accuracy of dimensions and specifications

    • Ensuring completeness of all required components and features

    • Verifying consistency in design and documentation

    • Confirming compliance with industry standards and regulations

  • Answered by AI
  • Q4. What is the typical deliverables of the different deliverables
  • Ans. 

    The typical deliverables of a project engineer include design drawings, technical specifications, project schedules, cost estimates, and progress reports.

    • Design drawings: detailed plans and schematics for construction or manufacturing

    • Technical specifications: detailed requirements for materials, equipment, and processes

    • Project schedules: timelines for completing tasks and milestones

    • Cost estimates: budget projections fo...

  • Answered by AI
  • Q5. Why this company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and explain what you have worked and do not lie

Skills evaluated in this interview

I applied via Referral and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical and Managerial.
  • Q2. Software Revit and BIM360

Interview Preparation Tips

Interview preparation tips for other job seekers - Good and thoughtful interview. First was with HR and then the head.

Crescon Projects & Services Interview FAQs

How many rounds are there in Crescon Projects & Services ELV Project Engineer interview?
Crescon Projects & Services interview process usually has 2 rounds. The most common rounds in the Crescon Projects & Services interview process are Technical and HR.
What are the top questions asked in Crescon Projects & Services ELV Project Engineer interview?

Some of the top questions asked at the Crescon Projects & Services ELV Project Engineer interview -

  1. What are the steps to follow before commissioning fire alarm pan...read more
  2. How to find out device coverag...read more
  3. Types of Fire Alarm Systems with Elaborate explanati...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Crescon Projects & Services interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
Adani Group Interview Questions
3.9
 • 174 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
View all
Project Engineer
20 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

QA QC Engineer
16 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Safety Officer
14 salaries
unlock blur

₹2.9 L/yr - ₹4.6 L/yr

HR Executive
9 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Senior Project Engineer
7 salaries
unlock blur

₹5.8 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Crescon Projects & Services with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Hindustan Construction Company

4.2
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview