Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Crescon Projects & Services Team. If you also belong to the team, you can get access from here

Crescon Projects & Services Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Crescon Projects & Services Service Engineer Interview Questions and Answers

Updated 22 Feb 2023

Crescon Projects & Services Service Engineer Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Wht is hvac, dx, cooling tower, chiller, fcu, fan type, ahu, pipes
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning. DX is Direct Expansion. Cooling tower and chiller are used for cooling. FCU is Fan Coil Unit. AHU is Air Handling Unit. Pipes are used for transporting fluids.

    • HVAC is a system used for heating, ventilation, and air conditioning in buildings.

    • DX is a type of HVAC system that uses direct expansion to cool air.

    • Cooling towers and chillers are used to cool water tha...

  • Answered by AI
  • Q2. Electrical lv hv volt current ampere rating

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join here worst working environment. Management don't no...

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to cad and design

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be flexible in ur approach.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. On site working
  • Q2. Site Executions , Planning, Working on RDSI
Round 3 - HR 

(2 Questions)

  • Q1. What's salary for providing
  • Q2. Some documents are sub contractor's

I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Details of precast structures (Segment)
  • Ans. 

    Precast structures are pre-made concrete elements used in construction.

    • Precast segments are manufactured off-site and transported to the construction site for assembly.

    • They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.

    • Precast segments can be designed to fit specific project requirements, reducing construction time and costs.

    • They offer high durability and strength, and...

  • Answered by AI
  • Q2. Which method use for segment casting?
  • Ans. 

    Segment casting can be done using various methods depending on the material and application.

    • One method is sand casting, where a mold is created using sand and the molten metal is poured into it.

    • Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.

    • Die casting is a method where molten metal is forced into a mold under high pressure.

    • Continuous casting is u...

  • Answered by AI
  • Q3. Grade of concrete.
  • Ans. 

    Grade of concrete refers to its strength and durability.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • The number represents the compressive strength of concrete in megapascals (MPa).

    • Common grades of concrete include M10, M20, M30, etc.

    • Higher grade concrete has higher strength and durability.

    • For example, M20 grade concrete has a compressive strength of 20 MPa.

  • Answered by AI
  • Q4. Design mix of concrete.
  • Ans. 

    Design mix of concrete refers to the proportion of materials used in making concrete.

    • Design mix is determined based on the strength and durability requirements of the concrete.

    • The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.

    • The proportions of each material are specified in terms of weight or volume.

    • For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...

  • Answered by AI
  • Q5. Method of segment casting.
  • Ans. 

    Segment casting is a method of casting concrete segments for tunnel lining.

    • Segments are cast in a factory and transported to the tunnel site.

    • Segments are then assembled to form a complete tunnel lining.

    • This method is commonly used in tunnel construction projects.

    • It allows for faster construction and better quality control.

    • Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of autocad, bbs, excel and word.

Skills evaluated in this interview

I applied via Walk-in

Round 1 - Group Discussion 

About your job, location, CTC

Round 2 - HR 

(2 Questions)

  • Q1. Gdjjdnksnd shgxkdjx vhkdkxnx
  • Q2. Years of experience & expectex salary facility provided by company

Interview Preparation Tips

Interview preparation tips for other job seekers - Always ready for technical knowledge from your site
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the construction procedure
  • Ans. 

    Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.

    • Planning and designing the project

    • Obtaining necessary permits

    • Site preparation and excavation

    • Foundation construction

    • Framing and structural work

    • Installation of utilities and systems

    • Finishing touches such as painting and flooring

    • Final inspections and approvals

  • Answered by AI
  • Q2. What's is the beam lapping position
  • Ans. 

    Beam lapping position refers to the location where two beams overlap or intersect in a structural element.

    • Beam lapping position is important for ensuring structural integrity and load-bearing capacity.

    • Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.

    • Proper beam lapping position is determined by engineering calculations and design specifications.

  • Answered by AI
  • Q3. What is the tile procedure
  • Ans. 

    The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.

    • The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.

    • It is commonly used in graphic design software to create seamless textures or backgrounds.

    • The size and shape of the tiles can be adjusted to achieve different visual effects.

    • Examples of tile ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About the previous projects & work procedures.
Round 2 - HR 

(1 Question)

  • Q1. Salary Discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief about my work experience
  • Ans. I explained my experience in Highways & structures
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - NEC ltd is wonderful company and excellent working culture.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1. Diff. Type Flow Meter Concept 2. Temperature Compensation in thermocouple 3. SPI modules 4. Level Mesurment
Round 3 - HR 

(1 Question)

  • Q1. Personal Questions about salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Basics about things worked should be clear and prepared before interview

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked about previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about what u know

Crescon Projects & Services Interview FAQs

How many rounds are there in Crescon Projects & Services Service Engineer interview?
Crescon Projects & Services interview process usually has 2 rounds. The most common rounds in the Crescon Projects & Services interview process are Resume Shortlist and Technical.
What are the top questions asked in Crescon Projects & Services Service Engineer interview?

Some of the top questions asked at the Crescon Projects & Services Service Engineer interview -

  1. Wht is hvac, dx, cooling tower, chiller, fcu, fan type, ahu, pi...read more
  2. Electrical lv hv volt current ampere rat...read more

Tell us how to improve this page.

Crescon Projects & Services Service Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more
Project Engineer
23 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Safety Officer
16 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

QA QC Engineer
15 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Senior Project Engineer
9 salaries
unlock blur

₹6.3 L/yr - ₹7.5 L/yr

HR Executive
9 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare Crescon Projects & Services with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

Ramky Infrastructure

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview