i
Crescon Projects & Services
Filter interviews by
QA/QC stands for Quality Assurance/Quality Control. It involves processes and procedures to ensure products or services meet quality standards.
QA focuses on preventing defects in the product development process.
QC focuses on identifying defects in the finished product.
QA/QC involves testing, inspections, audits, and documentation.
Examples include software testing, manufacturing inspections, and construction quality che
The slump test is used to measure the workability of concrete by determining the consistency and flow of the mixture.
The slump test helps ensure that the concrete mix has the right amount of water for proper hydration and strength.
It is a simple and quick test that involves filling a cone-shaped mold with concrete, then removing the mold to see how much the mixture slumps or settles.
The results of the slump test can in...
The store department is responsible for managing inventory, ensuring stock levels are maintained, overseeing deliveries, and organizing the layout of the store.
Managing inventory to ensure stock levels are maintained
Overseeing deliveries and coordinating with suppliers
Organizing the layout of the store for efficient customer flow
Implementing security measures to prevent theft and loss
Training and supervising store staf
Crescon Projects & Services interview questions for popular designations
Get interview-ready with Top Crescon Projects & Services Interview Questions
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Process in construction refers to the sequence of activities and tasks involved in completing a construction project.
Process in construction includes planning, scheduling, procurement, execution, monitoring, and closing out of a project.
Each step in the process is crucial for the successful completion of the project.
For example, planning involves creating a detailed project plan outlining the scope, schedule, budget, a...
I applied via Referral and was interviewed in Aug 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Refrigeration cycles are processes that remove heat from a space and transfer it elsewhere.
The vapor compression cycle is the most common refrigeration cycle used in HVAC systems.
The absorption cycle uses a refrigerant that is absorbed into a solution and then released through heat.
The steam jet cycle uses steam to create a vacuum and remove heat from a space.
The air cycle uses compressed air to cool a space.
The thermo...
HEPA filters are used in clean room applications with a minimum efficiency of 99.97% for particles as small as 0.3 microns.
HEPA filters are commonly used in clean room applications
HEPA filters have a minimum efficiency of 99.97% for particles as small as 0.3 microns
ULPA filters are also used in some clean room applications and have a minimum efficiency of 99.999% for particles as small as 0.12 microns
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
based on 15 interviews
Interview experience
based on 117 reviews
Rating in categories
Project Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Project Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
GMR Group