Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Crescon Projects & Services Team. If you also belong to the team, you can get access from here

Crescon Projects & Services Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Crescon Projects & Services Interview Questions and Answers

Updated 1 Feb 2025
Popular Designations

10 Interview questions

A Junior Quality Engineer was asked 8mo ago
Q. Why is the slump test performed?
Ans. 

The slump test is used to measure the workability of concrete by determining the consistency and flow of the mixture.

  • The slump test helps ensure that the concrete mix has the right amount of water for proper hydration and strength.

  • It is a simple and quick test that involves filling a cone-shaped mold with concrete, then removing the mold to see how much the mixture slumps or settles.

  • The results of the slump test c...

View all Junior Quality Engineer interview questions
A Junior Quality Engineer was asked 8mo ago
Q. What is QA/QC?
Ans. 

QA/QC stands for Quality Assurance/Quality Control. It involves processes and procedures to ensure products or services meet quality standards.

  • QA focuses on preventing defects in the product development process.

  • QC focuses on identifying defects in the finished product.

  • QA/QC involves testing, inspections, audits, and documentation.

  • Examples include software testing, manufacturing inspections, and construction qualit...

View all Junior Quality Engineer interview questions
An ELV Project Engineer was asked
Q. What steps should be followed before commissioning a fire alarm panel?
Ans. 

Steps to follow before commissioning fire alarm panel

  • Ensure all devices are installed and wired correctly

  • Verify that the programming is correct and matches the building's layout

  • Perform a full system test to ensure all devices are communicating properly

  • Train building staff on how to operate the system and respond to alarms

  • Obtain necessary permits and approvals from local authorities

  • Ensure all documentation is compl...

View all ELV Project Engineer interview questions
An ELV Project Engineer was asked
Q. How do you determine device coverage?
Ans. 

Device coverages can be found by analyzing network coverage maps and conducting field tests.

  • Analyze network coverage maps provided by service providers

  • Conduct field tests to determine signal strength and coverage

  • Consider factors such as terrain, building materials, and weather conditions

  • Use specialized tools such as signal meters and spectrum analyzers

  • Consult with experts in the field for guidance and advice

View all ELV Project Engineer interview questions
A Hvac Site Engineer was asked
Q. What are all the refrigeration cycles, and can you explain them?
Ans. 

Refrigeration cycles are processes that remove heat from a space and transfer it elsewhere.

  • The vapor compression cycle is the most common refrigeration cycle used in HVAC systems.

  • The absorption cycle uses a refrigerant that is absorbed into a solution and then released through heat.

  • The steam jet cycle uses steam to create a vacuum and remove heat from a space.

  • The air cycle uses compressed air to cool a space.

  • The t...

View all Hvac Site Engineer interview questions
A Hvac Site Engineer was asked
Q. What types of filters are used in clean room applications, and what are their specifications?
Ans. 

HEPA filters are used in clean room applications with a minimum efficiency of 99.97% for particles as small as 0.3 microns.

  • HEPA filters are commonly used in clean room applications

  • HEPA filters have a minimum efficiency of 99.97% for particles as small as 0.3 microns

  • ULPA filters are also used in some clean room applications and have a minimum efficiency of 99.999% for particles as small as 0.12 microns

View all Hvac Site Engineer interview questions
A Store Incharge was asked 4mo ago
Q. Roles and responsibility of store department
Ans. 

The store department is responsible for managing inventory, ensuring stock levels are maintained, overseeing deliveries, and organizing the layout of the store.

  • Managing inventory to ensure stock levels are maintained

  • Overseeing deliveries and coordinating with suppliers

  • Organizing the layout of the store for efficient customer flow

  • Implementing security measures to prevent theft and loss

  • Training and supervising store...

View all Store Incharge interview questions
Are these interview questions helpful?
A Planning Engineer was asked
Q. Process in Construction
Ans. 

Process in construction refers to the sequence of activities and tasks involved in completing a construction project.

  • Process in construction includes planning, scheduling, procurement, execution, monitoring, and closing out of a project.

  • Each step in the process is crucial for the successful completion of the project.

  • For example, planning involves creating a detailed project plan outlining the scope, schedule, budg...

View all Planning Engineer interview questions
A Service Engineer was asked
Q. Wht is hvac, dx, cooling tower, chiller, fcu, fan type, ahu, pipes
Ans. 

HVAC stands for Heating, Ventilation, and Air Conditioning. DX is Direct Expansion. Cooling tower and chiller are used for cooling. FCU is Fan Coil Unit. AHU is Air Handling Unit. Pipes are used for transporting fluids.

  • HVAC is a system used for heating, ventilation, and air conditioning in buildings.

  • DX is a type of HVAC system that uses direct expansion to cool air.

  • Cooling towers and chillers are used to cool wate...

View all Service Engineer interview questions
An ELV Project Engineer was asked
Q. Types of Fire Alarm Systems with Elaborate explanation.
Ans. 

There are mainly four types of fire alarm systems: Conventional, Addressable, Analog, and Wireless.

  • Conventional fire alarm systems are the most basic and cost-effective systems.

  • Addressable fire alarm systems are more advanced and can pinpoint the exact location of the fire.

  • Analog fire alarm systems are similar to addressable systems but can also detect changes in the environment that may indicate a fire.

  • Wireless f...

View all ELV Project Engineer interview questions

Crescon Projects & Services Interview Experiences

12 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What's is qa/QC .
  • Ans. 

    QA/QC stands for Quality Assurance/Quality Control. It involves processes and procedures to ensure products or services meet quality standards.

    • QA focuses on preventing defects in the product development process.

    • QC focuses on identifying defects in the finished product.

    • QA/QC involves testing, inspections, audits, and documentation.

    • Examples include software testing, manufacturing inspections, and construction quality che...

  • Answered by AI
  • Q2. Why is Slump test
  • Ans. 

    The slump test is used to measure the workability of concrete by determining the consistency and flow of the mixture.

    • The slump test helps ensure that the concrete mix has the right amount of water for proper hydration and strength.

    • It is a simple and quick test that involves filling a cone-shaped mold with concrete, then removing the mold to see how much the mixture slumps or settles.

    • The results of the slump test can in...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Gr infraprojects limited total experience 4.5 year.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Old projects works
  • Q2. Roles and responsibility of store department
  • Ans. 

    The store department is responsible for managing inventory, ensuring stock levels are maintained, overseeing deliveries, and organizing the layout of the store.

    • Managing inventory to ensure stock levels are maintained

    • Overseeing deliveries and coordinating with suppliers

    • Organizing the layout of the store for efficient customer flow

    • Implementing security measures to prevent theft and loss

    • Training and supervising store staf...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Main focus on MEP and HVAC projects
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About education
  • Q2. About last experience
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Are you interested or not for this job & basic questions
Round 3 - One-on-one 

(3 Questions)

  • Q1. Privious company related questions
  • Q2. Your basic salary & work role
  • Q3. Your expectations
Round 4 - One-on-one 

(1 Question)

  • Q1. Job related questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tool test ,clash, details design
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic Question about the Self
Round 3 - Technical 

(3 Questions)

  • Q1. About Project Planning
  • Q2. MSP Critical Path
  • Q3. Process in Construction
  • Ans. 

    Process in construction refers to the sequence of activities and tasks involved in completing a construction project.

    • Process in construction includes planning, scheduling, procurement, execution, monitoring, and closing out of a project.

    • Each step in the process is crucial for the successful completion of the project.

    • For example, planning involves creating a detailed project plan outlining the scope, schedule, budget, a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Self Confident
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Basic about Sprinkler system
  • Q2. Testing and commissioning

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. How much work experience do u have in this field
  • Q2. What is u r current company and u r salary
  • Q3. How much CTC do u expecting
Round 2 - One-on-one 

(3 Questions)

  • Q1. What do u know about HVAC
  • Q2. What r all the refrigeration cycles and explain
  • Ans. 

    Refrigeration cycles are processes that remove heat from a space and transfer it elsewhere.

    • The vapor compression cycle is the most common refrigeration cycle used in HVAC systems.

    • The absorption cycle uses a refrigerant that is absorbed into a solution and then released through heat.

    • The steam jet cycle uses steam to create a vacuum and remove heat from a space.

    • The air cycle uses compressed air to cool a space.

    • The thermo...

  • Answered by AI
  • Q3. What type of filters used in clean room application and the spec of the filters
  • Ans. 

    HEPA filters are used in clean room applications with a minimum efficiency of 99.97% for particles as small as 0.3 microns.

    • HEPA filters are commonly used in clean room applications

    • HEPA filters have a minimum efficiency of 99.97% for particles as small as 0.3 microns

    • ULPA filters are also used in some clean room applications and have a minimum efficiency of 99.999% for particles as small as 0.12 microns

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U can be very calm in the interview ,very well treated ,friendly staffs

QA/QC Manager Interview Questions & Answers

user image Kalaiy Arasan

posted on 5 Jun 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. MIR,GRN,DC,FAT,sat

Interview Preparation Tips

Topics to prepare for Crescon Projects & Services QA/QC Manager interview:
  • QA/QC
Interview preparation tips for other job seekers - testing knowledge should be high

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Line and pump hydraulics? Basic chemical engineering case studies
  • Q2. Line sizing, pump sizing along with some real case studies.

Interview Preparation Tips

Topics to prepare for Crescon Projects & Services Process Engineer interview:
  • Fluid Mechanics
  • Thermodynamics
Interview preparation tips for other job seekers - Keep it simple, make sure what you have shown in your resume be clear about it.

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Crescon Projects & Services?
Ask anonymously on communities.

Crescon Projects & Services Interview FAQs

How many rounds are there in Crescon Projects & Services interview?
Crescon Projects & Services interview process usually has 1-2 rounds. The most common rounds in the Crescon Projects & Services interview process are HR, Technical and One-on-one Round.
How to prepare for Crescon Projects & Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Crescon Projects & Services. The most common topics and skills that interviewers at Crescon Projects & Services expect are MEP, Quality Control, HVAC, Estimation and Estimation Engineering.
What are the top questions asked in Crescon Projects & Services interview?

Some of the top questions asked at the Crescon Projects & Services interview -

  1. What are the steps to follow before commissioning fire alarm pan...read more
  2. What type of filters used in clean room application and the spec of the filt...read more
  3. How to find out device coverag...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.8/5

based on 16 interview experiences

Difficulty level

Easy 17%
Moderate 83%

Duration

Less than 2 weeks 83%
2-4 weeks 17%
View more

Crescon Projects & Services Reviews and Ratings

based on 140 reviews

3.7/5

Rating in categories

3.5

Skill development

3.2

Work-life balance

3.7

Salary

3.6

Job security

3.2

Company culture

3.3

Promotions

3.3

Work satisfaction

Explore 140 Reviews and Ratings
Procurement Engineer - Civil

Chennai

5-10 Yrs

₹ 3-8 LPA

Recruiter - HR

Chennai

1-3 Yrs

Not Disclosed

Explore more jobs
Project Engineer
27 salaries
unlock blur

₹3.3 L/yr - ₹6.5 L/yr

Safety Officer
19 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

QA QC Engineer
16 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Store Incharge
15 salaries
unlock blur

₹3.8 L/yr - ₹7.2 L/yr

Estimation Engineer
10 salaries
unlock blur

₹1.8 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Crescon Projects & Services with

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

4.0
Compare

Ramky Infrastructure

4.2
Compare

B.L. Kashyap & Sons

3.7
Compare
write
Share an Interview