Filter interviews by
Failures of building can be due to various reasons such as poor construction, natural disasters, or lack of maintenance.
Poor construction practices leading to structural weaknesses
Natural disasters like earthquakes, hurricanes, or floods
Lack of regular maintenance causing deterioration over time
Technical aspects of building involve understanding structural design, materials, construction methods, and building codes.
Understanding structural design principles such as load-bearing capacity and stability
Knowledge of different building materials and their properties
Familiarity with construction methods and techniques
Adherence to building codes and regulations to ensure safety and compliance
I applied via Referral and was interviewed in May 2023. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in May 2023. There was 1 interview round.
Brigade Group interview questions for popular designations
I was interviewed in Oct 2023.
Get interview-ready with Top Brigade Group Interview Questions
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
Tile, plastering and Mivan procedures are construction techniques used in building construction.
Tile procedure involves laying tiles on a surface using adhesive and grout.
Plastering procedure involves applying a layer of plaster on walls and ceilings to create a smooth surface.
Mivan procedure involves using aluminium formwork to create walls, slabs, columns, beams, etc. in a building.
All these procedures require skille...
I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.
The workflow and specifications of a project involve understanding the steps and requirements for completing a task.
Understand the project goals and objectives
Identify the tasks and subtasks involved
Define the requirements and specifications
Create a timeline and assign responsibilities
Test and validate the project deliverables
I applied via Campus Placement and was interviewed before Jun 2023. There were 4 interview rounds.
Was a multi section multiple choice
Types of doors include swing doors, sliding doors, revolving doors, and folding doors.
Swing doors open on hinges like a traditional door.
Sliding doors move horizontally along a track.
Revolving doors have multiple panels that rotate around a central axis.
Folding doors consist of multiple panels that fold to open or close.
Other types include pocket doors, barn doors, and French doors.
Different types of loads that engineers need to consider include dead loads, live loads, wind loads, snow loads, seismic loads, and dynamic loads.
Dead loads are the permanent loads on a structure, such as the weight of the building itself and fixed equipment.
Live loads are temporary loads caused by occupants, furniture, and other movable objects.
Wind loads are forces exerted by wind on a structure, which can vary based...
Top trending discussions
Interview experience
based on 374 reviews
Rating in categories
Deputy Manager
150
salaries
| ₹5.2 L/yr - ₹13.2 L/yr |
Senior Engineer
89
salaries
| ₹4.2 L/yr - ₹8.6 L/yr |
Project Engineer
77
salaries
| ₹3.4 L/yr - ₹7.9 L/yr |
Project Manager
51
salaries
| ₹9.7 L/yr - ₹18 L/yr |
Manager
45
salaries
| ₹8.2 L/yr - ₹23 L/yr |
Prestige Group
Sobha
DLF
Godrej Properties