Upload Button Icon Add office photos

Brigade Group

Compare button icon Compare button icon Compare

Filter interviews by

Brigade Group Graduate Engineer Interview Questions and Answers

Updated 28 Jun 2024

Brigade Group Graduate Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jun 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Was a multi section multiple choice

Round 2 - HR 

(2 Questions)

  • Q1. Why did you choose civil
  • Ans. 

    I chose civil engineering because of my passion for designing and building structures that improve communities.

    • Passion for designing and building structures

    • Interest in improving communities

    • Enjoy problem-solving and working with numbers

    • Inspired by iconic civil engineering projects like the Golden Gate Bridge

  • Answered by AI
  • Q2. How do you feel about working at site
  • Ans. 

    I am excited about working at site as it provides hands-on experience and the opportunity to see projects come to life.

    • I enjoy being in a dynamic environment where I can apply my engineering knowledge in real-world scenarios

    • I am comfortable with physical work and being outdoors

    • I am eager to learn from experienced professionals on site and gain practical skills

    • I understand the importance of safety protocols and will pri

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Types of doors etc
  • Ans. 

    Types of doors include swing doors, sliding doors, revolving doors, and folding doors.

    • Swing doors open on hinges like a traditional door.

    • Sliding doors move horizontally along a track.

    • Revolving doors have multiple panels that rotate around a central axis.

    • Folding doors consist of multiple panels that fold to open or close.

    • Other types include pocket doors, barn doors, and French doors.

  • Answered by AI
  • Q2. Tyoe of loads etc
  • Ans. 

    Different types of loads that engineers need to consider include dead loads, live loads, wind loads, snow loads, seismic loads, and dynamic loads.

    • Dead loads are the permanent loads on a structure, such as the weight of the building itself and fixed equipment.

    • Live loads are temporary loads caused by occupants, furniture, and other movable objects.

    • Wind loads are forces exerted by wind on a structure, which can vary based...

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. Tell me more on your seminar
  • Ans. 

    I presented a seminar on sustainable engineering practices in construction industry.

    • Researched various sustainable construction materials and techniques

    • Discussed the importance of reducing carbon footprint in construction projects

    • Highlighted case studies of successful sustainable construction projects

    • Engaged the audience in a Q&A session to discuss further insights

  • Answered by AI
  • Q2. Question on forces on building

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Aptitude Test 

Self introduction, previous experience of working.

Round 2 - One-on-one 

(2 Questions)

  • Q1. Shear force diagram and bending moment diagram.
  • Ans. 

    Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.

    • Shear force diagram is a graph of shear force plotted against the length of the beam.

    • Bending moment diagram is a graph of bending moment plotted against the length of the beam.

    • Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...

  • Answered by AI
  • Q2. Consumption of material as per IS code.
  • Ans. 

    Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.

    • Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.

    • It includes factors such as type of material, dimensions, quality standards, and wastage allowances.

    • For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you leaving from previous company?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for a new challenge to further develop my skills and knowledge.

    • Interested in exploring new opportunities for career advancement.

    • Seeking a company with a better cultural fit or work-life balance.

    • Want to work on more innovative projects or in a different industry.

    • Previous company downsized or restructured, leading to job loss.

  • Answered by AI
  • Q2. How you built our company as standard level.
  • Ans. 

    I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.

    • Implemented best practices in engineering processes and project management

    • Fostered a culture of continuous improvement through regular training and feedback sessions

    • Ensured alignment with industry standards and certifications such as ISO, ASME, or API

    • Regul...

  • Answered by AI

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What the sampling frequency for private density test in per square meter?
  • Ans. 

    The sampling frequency for private density test per square meter depends on the type of test being conducted.

    • The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.

    • For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Alu-from

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing activities
  • Q2. Types of paints, tiles.
  • Ans. 

    Types of paints and tiles commonly used in construction projects.

    • Types of paints: acrylic, latex, oil-based, enamel, spray paint

    • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions will be asked based on your past experience.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself?
  • Q2. Past experience and academic
  • Q3. Software related-AutoCAD and Revit
  • Q4. What is Copy Monitor?
  • Ans. 

    Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

    • It allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

    • It can also be used to monitor changes to parame...

  • Answered by AI
  • Q5. How do you link Revit models?
  • Ans. 

    Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

    • Open the host model and go to the 'Insert' tab.

    • Click on 'Link Revit' and select the model to be linked.

    • Choose the appropriate settings for the link, such as positioning and visibility.

    • Repeat the process for any additional models to be linked.

    • Save the host model to ensure the links are maintained.

  • Answered by AI
Round 3 - Assignment 

They gave an architectural model to create a structural model

Round 4 - HR 

(3 Questions)

  • Q1. Why are you changing the company?
  • Q2. What is your expectation?
  • Q3. Will you work for the same salary which you are getting for previous company?

Interview Preparation Tips

Topics to prepare for Sobha Senior Engineer interview:
  • software knowledge
  • REVIT Structure
  • AutoCAD
Interview preparation tips for other job seekers - it is like a government job.. if you like gossips and all you have to consider this company

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

Brigade Group Interview FAQs

How many rounds are there in Brigade Group Graduate Engineer interview?
Brigade Group interview process usually has 4 rounds. The most common rounds in the Brigade Group interview process are One-on-one Round, Aptitude Test and HR.
What are the top questions asked in Brigade Group Graduate Engineer interview?

Some of the top questions asked at the Brigade Group Graduate Engineer interview -

  1. Types of doors ...read more
  2. Tyoe of loads ...read more
  3. Question on forces on build...read more

Tell us how to improve this page.

Brigade Group Graduate Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 131 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
Puravankara Interview Questions
3.7
 • 19 Interviews
Gaurs Group Interview Questions
4.0
 • 18 Interviews
View all

Brigade Group Graduate Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

3.0

Salary

5.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
159 salaries
unlock blur

₹5.4 L/yr - ₹13 L/yr

Senior Engineer
92 salaries
unlock blur

₹4.2 L/yr - ₹8.6 L/yr

Project Engineer
75 salaries
unlock blur

₹3.8 L/yr - ₹7.6 L/yr

Project Manager
47 salaries
unlock blur

₹9.7 L/yr - ₹18.2 L/yr

Manager
45 salaries
unlock blur

₹8.2 L/yr - ₹23 L/yr

Explore more salaries
Compare Brigade Group with

Sobha

3.8
Compare

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Surya Roshni

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview