Upload Button Icon Add office photos

Brigade Group

Compare button icon Compare button icon Compare

Filter interviews by

Brigade Group QA Engineer Interview Questions and Answers

Updated 20 Jul 2023

Brigade Group QA Engineer Interview Experiences

1 interview found

QA Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Jul 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Sequence of finishing works and explanation of how you do one finishing activity
  • Q2. Workflow and specifications of project
  • Ans. 

    The workflow and specifications of a project involve understanding the steps and requirements for completing a task.

    • Understand the project goals and objectives

    • Identify the tasks and subtasks involved

    • Define the requirements and specifications

    • Create a timeline and assign responsibilities

    • Test and validate the project deliverables

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and notice period and personal details

Interview Preparation Tips

Interview preparation tips for other job seekers - Process and systems needs to be on fingertips and material specifications and work flow sequences to be thorough.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What the sampling frequency for private density test in per square meter?
  • Ans. 

    The sampling frequency for private density test per square meter depends on the type of test being conducted.

    • The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.

    • For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Alu-from
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Aptitude Test 

Self introduction, previous experience of working.

Round 2 - One-on-one 

(2 Questions)

  • Q1. Shear force diagram and bending moment diagram.
  • Ans. 

    Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.

    • Shear force diagram is a graph of shear force plotted against the length of the beam.

    • Bending moment diagram is a graph of bending moment plotted against the length of the beam.

    • Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...

  • Answered by AI
  • Q2. Consumption of material as per IS code.
  • Ans. 

    Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.

    • Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.

    • It includes factors such as type of material, dimensions, quality standards, and wastage allowances.

    • For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you leaving from previous company?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for a new challenge to further develop my skills and knowledge.

    • Interested in exploring new opportunities for career advancement.

    • Seeking a company with a better cultural fit or work-life balance.

    • Want to work on more innovative projects or in a different industry.

    • Previous company downsized or restructured, leading to job loss.

  • Answered by AI
  • Q2. How you built our company as standard level.
  • Ans. 

    I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.

    • Implemented best practices in engineering processes and project management

    • Fostered a culture of continuous improvement through regular training and feedback sessions

    • Ensured alignment with industry standards and certifications such as ISO, ASME, or API

    • Regul...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing activities
  • Q2. Types of paints, tiles.
  • Ans. 

    Types of paints and tiles commonly used in construction projects.

    • Types of paints: acrylic, latex, oil-based, enamel, spray paint

    • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions will be asked based on your past experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself?
  • Q2. Past experience and academic
  • Q3. Software related-AutoCAD and Revit
  • Q4. What is Copy Monitor?
  • Ans. 

    Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

    • It allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

    • It can also be used to monitor changes to parame...

  • Answered by AI
  • Q5. How do you link Revit models?
  • Ans. 

    Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

    • Open the host model and go to the 'Insert' tab.

    • Click on 'Link Revit' and select the model to be linked.

    • Choose the appropriate settings for the link, such as positioning and visibility.

    • Repeat the process for any additional models to be linked.

    • Save the host model to ensure the links are maintained.

  • Answered by AI
Round 3 - Assignment 

They gave an architectural model to create a structural model

Round 4 - HR 

(3 Questions)

  • Q1. Why are you changing the company?
  • Q2. What is your expectation?
  • Q3. Will you work for the same salary which you are getting for previous company?

Interview Preparation Tips

Topics to prepare for Sobha Senior Engineer interview:
  • software knowledge
  • REVIT Structure
  • AutoCAD
Interview preparation tips for other job seekers - it is like a government job.. if you like gossips and all you have to consider this company

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

Brigade Group Interview FAQs

How many rounds are there in Brigade Group QA Engineer interview?
Brigade Group interview process usually has 3 rounds. The most common rounds in the Brigade Group interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Brigade Group QA Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 130 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
View all
Brigade Group QA Engineer Salary
based on 9 salaries
₹4.9 L/yr - ₹7.6 L/yr
5% more than the average QA Engineer Salary in India
View more details

Brigade Group QA Engineer Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

5.0

Skill development

4.4

Work-life balance

3.8

Salary

4.8

Job security

4.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 6 Reviews and Ratings
Deputy Manager
158 salaries
unlock blur

₹5.4 L/yr - ₹13 L/yr

Senior Engineer
92 salaries
unlock blur

₹4.2 L/yr - ₹8.6 L/yr

Project Engineer
76 salaries
unlock blur

₹3.8 L/yr - ₹7.6 L/yr

Project Manager
47 salaries
unlock blur

₹9.7 L/yr - ₹18.2 L/yr

Manager
45 salaries
unlock blur

₹8.2 L/yr - ₹23 L/yr

Explore more salaries
Compare Brigade Group with

Sobha

3.8
Compare

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Surya Roshni

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview