Upload Button Icon Add office photos

Filter interviews by

ARSS Infrastructure Projects Deputy Project Manager Interview Questions, Process, and Tips for Experienced

Updated 18 Aug 2024

Top ARSS Infrastructure Projects Deputy Project Manager Interview Questions and Answers for Experienced

  • Q1. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
  • Q2. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
  • Q3. Which one is dependable to design of Rigid Pavement
View all 8 questions

4 ARSS Infrastructure Projects Deputy Project Manager Interview Experiences for Experienced

12 questions found

Sort by: Popular

Deputy Project Manager Interview Questions

user image Anonymous

posted on 19 Jun 2022

Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 2-4 weeks
Result
Selected  Selected

I applied via Walk-in and was interviewed in Aug 2022.

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Types of cement and density?
  • Q2. Density of sleeper's in one km?

Deputy Project Manager Interview Questions

user image Rehan Masood

posted on 6 Jan 2022

I applied via Naukri.com and was interviewed in Dec 2021.

1 Interview Round

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in positive attitude if you know the answer then give it in a politely way, if not then say that I go for thorough study.

Get interview-ready with top interview questions

Deputy Project Manager Interview Questions

user image Anonymous

posted on 5 Jul 2022

I applied via Walk-in

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (1 Question)

  • Q1. Ek mahine me kitni billing kar loge

Interview Preparation Tips

Interview preparation tips for other job seekers - No one is going to ask technical questions, he only means by billing and only keep billing, you will remain in the company.

Deputy Project Manager Interview Questions

user image Anonymous

posted on 21 Oct 2021

I applied via Company Website and was interviewed in Apr 2021.

1 Interview Round

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Materials and manpower not provided by company and ask for billing amount force fully so I suggest no anyone join ARSS.
THANK YOU

ARSS Infrastructure Projects interview questions for designations

 Project Manager

 (1)

 Civil Site Engineer

 (1)

 Civil Engineer

 (1)

 Site Engineer

 (1)

 Assistant Manager

 (1)

 Electrical Engineer

 (1)

Interview questions from similar companies

Interview experience
3
 Average
Difficulty level
 Easy
Duration
 -
Result
 Not Selected

1 Interview Round

1

Technical Round (3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Q3. How much ur carpent area and buildup area

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. BBS preparation
  • Q2. Drawings related

Interview Preparation Tips

Interview preparation tips for other job seekers - They should work on KSA ( knowledge, skill, attitude) to get dream job.
Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 2-4 weeks
Result
Selected  Selected

I applied via Referral and was interviewed in Jul 2022.

3 Interview Rounds

1

Technical Round (1 Question)

  • Q1. Related to the electro mechanical field.
2

HR Round (1 Question)

  • Q1. Remuneration, benifits, insurance and other facilities.
3

One-on-one Round (1 Question)

  • Q1. Confidence test regarding the position of appointment.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and confident. Don't make arrangements in the unknown fields.

4 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (2 Questions)

  • Q1. About job profile on the present
  • Q2. About job profile the overall
3

One-on-one Round (1 Question)

  • Q1. What is the roles and responsibilities
4

HR Round (5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your strengths and weaknesses?
  • Q3. Share details of your previous job.
  • Q4. Tell me about yourself.
  • Q5. What are the challenges faced

Interview Preparation Tips

Interview preparation tips for other job seekers - Final discussion on being selected

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice site execution method's
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

2 Interview Rounds

1

One-on-one Round (4 Questions)

  • Q1. Brief description of self
  • Q2. Why do you want to leave the present company
  • Q3. What motivates you to join our company
  • Q4. What way you can contribute to our company
2

One-on-one Round (2 Questions)

  • Q1. Your previous company is a TATA Company, then why do you want to leave that and join L&T Construction?
  • Q2. How to manage local problems like local administration, political interference, permissions in a project which is inside a municipal corporation area

ARSS Infrastructure Projects Interview FAQs

How many rounds are there in ARSS Infrastructure Projects Deputy Project Manager interview for experienced candidates?
ARSS Infrastructure Projects interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the ARSS Infrastructure Projects interview process for experienced candidates are Technical and Resume Shortlist.
What are the top questions asked in ARSS Infrastructure Projects Deputy Project Manager interview for experienced candidates?

Some of the top questions asked at the ARSS Infrastructure Projects Deputy Project Manager interview for experienced candidates -

  1. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitume...read more
  2. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor ...read more
  3. Which one is dependable to design of Rigid Pavem...read more

Tell us how to improve this page.

People are getting interviews through

based on 4 ARSS Infrastructure Projects interviews
WalkIn
Company Website
Job Portal
50%
25%
25%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
ARSS Infrastructure Projects Deputy Project Manager Salary
based on 4 salaries
₹9 L/yr - ₹11.4 L/yr
6% less than the average Deputy Project Manager Salary in India
View more details

ARSS Infrastructure Projects Deputy Project Manager Reviews and Ratings

based on 5 reviews

1.6/5

Rating in categories

1.2

Skill development

2.1

Work-Life balance

2.1

Salary & Benefits

1.2

Job Security

1.6

Company culture

1.2

Promotions/Appraisal

1.2

Work Satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Site Engineer
12 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Accountant
8 salaries
unlock blur

₹2.2 L/yr - ₹4.1 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare

Ashoka Buildcon

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview