Upload Button Icon Add office photos

Filter interviews by

ARSS Infrastructure Projects Project Manager Interview Questions and Answers

Updated 15 Jul 2021

ARSS Infrastructure Projects Project Manager Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Regarding my past work experience.
  • Q2. Regarding well foundation & pile foundations.
  • Q3. Regarding other RCC structural activities.

Interview Preparation Tips

Interview preparation tips for other job seekers - What they asked, I replied accordingly. The interview experience was good.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Civil work regarding
  • Q2. I am ready for civil and structural.

Interview Preparation Tips

Interview preparation tips for other job seekers - Presently I' m working in ahluwalia contract India limited. I am working there in dental now. When are u calling me for interview , I am ready for interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What you had done, how much experience you have.
  • Ans. I told i have 15 years of Power sector experience with EPC,ONM, Overhauling, NEW SITE MOBILIZATION.
  • Answered Anonymously
Round 3 - HR 

(2 Questions)

  • Q1. Are you ready to relocate Karnataka
  • Ans. I said yes I will relocate
  • Answered Anonymously
  • Q2. When you will join
  • Ans. I said after issuing of offer letter I will join.
  • Answered Anonymously

I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About previous projects
  • Q2. Old project and civil related

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare on projects old working projects
All over india posting
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. About previous Experiences and product Knowledge.

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Self introduction & present working environment
  • Q2. Why looking for a change
  • Q3. Suitable for any place in India
Round 3 - Technical 

(1 Question)

  • Q1. Based on CV mentioned experience work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident during self introduction.
Please mention what you had done in your career but do not included those things that not done by you
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding Contracts and claim management
Round 2 - Assignment 

3 cases and its analysis in the claim managent perspective

Round 3 - HR 

(1 Question)

  • Q1. General discussion and future plan

Interview Preparation Tips

Topics to prepare for ITD Cementation India Assistant Manager interview:
  • Honesty
  • good listening
  • good analysing risks

ARSS Infrastructure Projects Interview FAQs

How to prepare for ARSS Infrastructure Projects Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ARSS Infrastructure Projects. The most common topics and skills that interviewers at ARSS Infrastructure Projects expect are Project Management, AutoCAD, Budgeting, Civil Engineering and Civil Project Management.
What are the top questions asked in ARSS Infrastructure Projects Project Manager interview?

Some of the top questions asked at the ARSS Infrastructure Projects Project Manager interview -

  1. Regarding other RCC structural activitie...read more
  2. Regarding well foundation & pile foundation...read more

Tell us how to improve this page.

ARSS Infrastructure Projects Project Manager Salary
based on 6 salaries
₹8.4 L/yr - ₹12 L/yr
35% less than the average Project Manager Salary in India
View more details

ARSS Infrastructure Projects Project Manager Reviews and Ratings

based on 5 reviews

3.5/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

2.5

Salary

2.7

Job security

2.5

Company culture

2.6

Promotions

2.7

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Site Engineer
11 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Store Incharge
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview