Filter interviews by
I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.
Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement
Density varies based on the type of cement
Portland cement is the most common type used in construction projects
The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.
Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.
Density of people sleeping outdoors in one km would depend on the location and circumstances.
For example, in a homeless encampment, the density of sleepers in one km might be h...
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
The required compaction for dry lean concrete is specified by MORTH.
MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.
The compaction factor for dry lean concrete should be between 0.78 to 0.82.
The compaction should be done using a plate vibrator or a needle vibrator.
The required compaction can vary depending on the type of dry lean concrete being used.
Proper compaction is import...
The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.
Traffic load and volume
Subgrade soil conditions
Climate and weather conditions
Concrete mix design
Joint spacing and layout
The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.
The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.
The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.
The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...
The slope in normal camber varies depending on the design and purpose of the structure.
Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.
The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.
For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...
The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.
The quantity of prime coat depends on the type of bitumen extractor machine used
It is important to follow the manufacturer's instructions for the specific machine being used
Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed
Typically, the quantity of pri...
The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.
The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.
The type of bitumen extractor machine used can affect the quantity of tack coat used.
The thickness of the GSB layer can also impact the quantity of tack coat used.
W...
I applied via Walk-in
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
ARSS Infrastructure Projects interview questions for designations
Top trending discussions
posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 4 May 2024
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
Safety and quality in project site are maintained through strict adherence to protocols and standards.
Establishing clear safety and quality guidelines
Providing regular training to workers on safety and quality protocols
Conducting regular inspections and audits to ensure compliance
Using appropriate safety equipment and tools
Encouraging workers to report any safety or quality concerns
Taking immediate action to address an...
posted on 7 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
Finalizing CTC involves considering various factors like cost of living, market rates, company budget, and employee qualifications.
Consider cost of living in the location of posting
Compare market rates for similar positions in the area
Ensure the CTC fits within the company's budget constraints
Take into account the qualifications and experience of the employee
Negotiate if necessary to reach a mutually beneficial CTC
Interview experience
based on 5 reviews
Rating in categories
Civil Site Engineer
23
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Site Engineer
11
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Civil Engineer
8
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Accountant
8
salaries
| ₹2.2 L/yr - ₹4.1 L/yr |
Safety Officer
7
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
IRB Infrastructure
Ashoka Buildcon