I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.
Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement
Density varies based on the type of cement
Portland cement is the most common type used in construction projects
The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.
Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.
Density of people sleeping outdoors in one km would depend on the location and circumstances.
For example, in a homeless encampment, the density of sleepers in one km might be h...
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
The required compaction for dry lean concrete is specified by MORTH.
MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.
The compaction factor for dry lean concrete should be between 0.78 to 0.82.
The compaction should be done using a plate vibrator or a needle vibrator.
The required compaction can vary depending on the type of dry lean concrete being used.
Proper compaction is import...
The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.
Traffic load and volume
Subgrade soil conditions
Climate and weather conditions
Concrete mix design
Joint spacing and layout
The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.
The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.
The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.
The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...
The slope in normal camber varies depending on the design and purpose of the structure.
Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.
The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.
For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...
The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.
The quantity of prime coat depends on the type of bitumen extractor machine used
It is important to follow the manufacturer's instructions for the specific machine being used
Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed
Typically, the quantity of pri...
The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.
The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.
The type of bitumen extractor machine used can affect the quantity of tack coat used.
The thickness of the GSB layer can also impact the quantity of tack coat used.
W...
I applied via Walk-in
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
ARSS Infrastructure Projects interview questions for designations
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
Some of the top questions asked at the ARSS Infrastructure Projects Deputy Project Manager interview -
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Civil Site Engineer
23
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Site Engineer
11
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Civil Engineer
8
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Safety Officer
7
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Store Incharge
7
salaries
| ₹2.2 L/yr - ₹3 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon