Top ARSS Infrastructure Projects Deputy Project Manager Interview Questions and Answers

  • Q1. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
  • Q2. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
  • Q3. Which one is dependable to design of Rigid Pavement
View all 8 questions

ARSS Infrastructure Projects Deputy Project Manager Interview Experiences

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of cement and density?
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.

    • Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement

    • Density varies based on the type of cement

    • Portland cement is the most common type used in construction projects

  • Answered by AI
  • Q2. Density of sleeper's in one km?
  • Ans. 

    The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.

    • Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.

    • Density of people sleeping outdoors in one km would depend on the location and circumstances.

    • For example, in a homeless encampment, the density of sleepers in one km might be h...

  • Answered by AI

I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Required compaction as per MORTH of dry lean concrete
  • Ans. 

    The required compaction for dry lean concrete is specified by MORTH.

    • MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.

    • The compaction factor for dry lean concrete should be between 0.78 to 0.82.

    • The compaction should be done using a plate vibrator or a needle vibrator.

    • The required compaction can vary depending on the type of dry lean concrete being used.

    • Proper compaction is import...

  • Answered by AI
  • Q2. Which one is dependable to design of Rigid Pavement
  • Ans. 

    The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.

    • Traffic load and volume

    • Subgrade soil conditions

    • Climate and weather conditions

    • Concrete mix design

    • Joint spacing and layout

  • Answered by AI
  • Q3. How much percentage of slope in shoulder
  • Ans. 

    The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.

    • The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.

    • The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.

    • The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...

  • Answered by AI
  • Q4. How much slope in normal camber
  • Ans. 

    The slope in normal camber varies depending on the design and purpose of the structure.

    • Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.

    • The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.

    • For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...

  • Answered by AI
  • Q5. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
  • Ans. 

    The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.

    • The quantity of prime coat depends on the type of bitumen extractor machine used

    • It is important to follow the manufacturer's instructions for the specific machine being used

    • Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed

    • Typically, the quantity of pri...

  • Answered by AI
  • Q6. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
  • Ans. 

    The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.

    • The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.

    • The type of bitumen extractor machine used can affect the quantity of tack coat used.

    • The thickness of the GSB layer can also impact the quantity of tack coat used.

    • W...

  • Answered by AI
  • Q7. Required compaction as per as MORTH of Embankment

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in positive attitude if you know the answer then give it in a politely way, if not then say that I go for thorough study.

Deputy Project Manager Interview Questions Asked at Other Companies

Q1. If contractors not compliance spec. Then what do you want or take ... read more
asked in Worley
Q2. What is the FEED? What is the flow of work in engineering? What i ... read more
Q3. Work experience in Depillaring with continuous miner project, usi ... read more
Q4. What is your area of specialization?Define water cement ratio?Cal ... read more
asked in JSW Steel
Q5. Are you convenient in electrical drawings and layouts

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ek mahine me kitni billing kar loge

Interview Preparation Tips

Interview preparation tips for other job seekers - No one is going to ask technical questions, he only means by billing and only keep billing, you will remain in the company.

I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What's your capacity?
  • Ans. I can manage your site alone and finish the project in time if you provide me manpower and material in time?
  • Answered Anonymously
  • Q2. No any questions
  • Ans. Due to technical person not available at the time of interview...
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Materials and manpower not provided by company and ask for billing amount force fully so I suggest no anyone join ARSS.
THANK YOU

ARSS Infrastructure Projects interview questions for designations

 Project Manager

 (1)

 Civil Site Engineer

 (1)

 Civil Engineer

 (1)

 Site Engineer

 (1)

 Assistant Manager

 (1)

 Electrical Engineer

 (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and character
Round 2 - Technical 

(1 Question)

  • Q1. Experience details

I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tell about to technical knowledge
  • Q2. How mainten safety and quality in project site
  • Ans. 

    Safety and quality in project site are maintained through strict adherence to protocols and standards.

    • Establishing clear safety and quality guidelines

    • Providing regular training to workers on safety and quality protocols

    • Conducting regular inspections and audits to ensure compliance

    • Using appropriate safety equipment and tools

    • Encouraging workers to report any safety or quality concerns

    • Taking immediate action to address an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was normal .tell to everything in pipe line activites in clearly
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Experience Type & Job Responsibility
  • Q2. Regarding Education & Previous Experience
  • Q3. Technical Experience & Knowledge of Past Organization
  • Q4. Salary Negotiations
  • Q5. Finalization of CTC with respect to Posting Order location
  • Ans. 

    Finalizing CTC involves considering various factors like cost of living, market rates, company budget, and employee qualifications.

    • Consider cost of living in the location of posting

    • Compare market rates for similar positions in the area

    • Ensure the CTC fits within the company's budget constraints

    • Take into account the qualifications and experience of the employee

    • Negotiate if necessary to reach a mutually beneficial CTC

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to Improve on Multiple Type of Answer's for Interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. BBS preparation
  • Q2. Drawings related

Interview Preparation Tips

Interview preparation tips for other job seekers - They should work on KSA ( knowledge, skill, attitude) to get dream job.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About job profile on the present
  • Q2. About job profile the overall
Round 3 - One-on-one 

(1 Question)

  • Q1. What is the roles and responsibilities
Round 4 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your strengths and weaknesses?
  • Q3. Share details of your previous job.
  • Q4. Tell me about yourself.
  • Q5. What are the challenges faced

Interview Preparation Tips

Interview preparation tips for other job seekers - Final discussion on being selected

ARSS Infrastructure Projects Interview FAQs

How many rounds are there in ARSS Infrastructure Projects Deputy Project Manager interview?
ARSS Infrastructure Projects interview process usually has 1-2 rounds. The most common rounds in the ARSS Infrastructure Projects interview process are Technical and Resume Shortlist.
What are the top questions asked in ARSS Infrastructure Projects Deputy Project Manager interview?

Some of the top questions asked at the ARSS Infrastructure Projects Deputy Project Manager interview -

  1. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitume...read more
  2. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor ...read more
  3. Which one is dependable to design of Rigid Pavem...read more

Tell us how to improve this page.

ARSS Infrastructure Projects Deputy Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
ARSS Infrastructure Projects Deputy Project Manager Salary
based on 4 salaries
₹9 L/yr - ₹11.4 L/yr
6% less than the average Deputy Project Manager Salary in India
View more details

ARSS Infrastructure Projects Deputy Project Manager Reviews and Ratings

based on 5 reviews

1.6/5

Rating in categories

1.2

Skill development

2.1

Work-life balance

2.1

Salary

1.2

Job security

1.6

Company culture

1.2

Promotions

1.2

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Site Engineer
11 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Accountant
8 salaries
unlock blur

₹2.2 L/yr - ₹4.1 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview