Using a soil compactor on GSB & WMM layers with a deadload of 12 tons or above can lead to excessive compaction and potential damage to the layers.
Excessive compaction can result in reduced permeability of the layers, affecting drainage.
The excessive force from the compactor can cause cracking or deformation in the layers.
It may also lead to uneven settlement and structural instability in the pavement.
Proper evaluation...
SMA layer is used in high speed expressways for its superior durability, rut resistance, and fatigue resistance.
SMA (Stone Matrix Asphalt) layer provides superior durability compared to traditional asphalt mixes.
SMA layer has excellent rut resistance, maintaining a smooth surface for high speed traffic.
The high binder content in SMA enhances fatigue resistance, reducing cracking and extending pavement life.
SMA mixtures...
I was interviewed in Jan 2025.
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
I can join your team within two weeks.
I am currently wrapping up my current projects and can transition smoothly within two weeks.
I have no prior commitments that would delay my start date.
I am excited about the opportunity to join your team and contribute to the safety initiatives.
I am available to start immediately if needed.
Apco Infratech interview questions for popular designations
I applied via Referral and was interviewed in Nov 2024. There were 2 interview rounds.
Get interview-ready with Top Apco Infratech Interview Questions
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
No, there is no specific code for Ms pipeline.
There is no specific code designated for Ms pipeline in the mechanical engineering field.
Ms pipeline may refer to a type of pipeline material or construction method, but it does not have a standardized code.
Engineers typically follow industry standards and specifications when designing and constructing pipelines.
A micrometre is a unit of length equal to one millionth of a meter, commonly used for measuring very small distances.
A micrometre is also known as a micron.
It is commonly used in fields such as engineering, physics, and biology for measuring small distances.
One micrometre is equal to 0.001 millimeters or 0.000001 meters.
Examples of objects measured in micrometres include bacteria, cells, and thin films.
Micrometres are ...
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
The overall responsibility for highway work includes overseeing project progress, ensuring quality standards are met, and managing contractor billing.
Oversee project progress to ensure timelines are met
Ensure quality standards are maintained throughout the construction process
Manage contractor billing and ensure accurate invoicing
Coordinate with various stakeholders including engineers, contractors, and government agen...
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Cable tray erection in metro involves installing cable trays to support and protect electrical cables in underground transportation systems.
Ensure proper planning and coordination with other trades to avoid conflicts during installation.
Select appropriate cable tray materials based on the environment and load requirements.
Follow safety regulations and guidelines to prevent accidents during installation.
Consider factors...
Cable laying in tranch & cable tray involves the installation of electrical cables in underground trenches and on cable trays.
Cable laying in tranch involves digging trenches underground to lay cables for electrical connections.
Cable laying in cable tray involves placing cables on trays mounted on walls or ceilings for organized and safe routing.
Proper planning and design are essential for efficient cable laying to ens...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Favourable zone in RCC refers to the region of a reinforced concrete member where the concrete is in compression and the steel is in tension.
Favourable zone is the area where the concrete is able to resist compressive forces effectively.
It is typically located at the top of a beam or slab, where the bending moment is highest.
In this zone, the steel reinforcement helps to resist tensile forces, while the concrete resist...
Lap length is the length of overlap between two reinforcing bars in a concrete structure to ensure proper transfer of loads.
Lap length is important for ensuring the continuity of reinforcement in concrete structures.
It is typically specified in building codes and design standards.
The lap length required depends on factors such as the diameter of the bars, concrete strength, and design loads.
For example, in a beam, the ...
Lapping in reinforcement involves overlapping two reinforcement bars to ensure continuity and strength in the structure.
Lapping is commonly used in construction to connect two reinforcement bars together.
The length of the lap varies depending on the design requirements and the type of reinforcement used.
Proper lapping ensures that the load is transferred effectively between the bars.
Examples of lapping include lap spli
Bearings in bridges help distribute loads and allow for movement due to temperature changes and settlement.
Bearings help distribute the loads from the superstructure to the substructure of the bridge.
They allow for movement of the bridge deck due to temperature changes, wind forces, and settlement of the foundation.
Bearings help reduce stress on the bridge components and prevent damage.
Common types of bearings used in ...
Types of expansion joints include slip joints, bellows joints, and modular joints.
Slip joints allow for movement in one direction only
Bellows joints accommodate movement in multiple directions
Modular joints are made up of separate components that can be replaced individually
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 130 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
₹ 9.23-15.5 LPA
Senior Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Officer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure