Cable tray erection in metro involves installing cable trays to support and protect electrical cables in underground transportation systems.
Ensure proper planning and coordination with other trades to avoid conflicts during installation.
Select appropriate cable tray materials based on the environment and load requirements.
Follow safety regulations and guidelines to prevent accidents during installation.
Consider factors...
Cable laying in tranch & cable tray involves the installation of electrical cables in underground trenches and on cable trays.
Cable laying in tranch involves digging trenches underground to lay cables for electrical connections.
Cable laying in cable tray involves placing cables on trays mounted on walls or ceilings for organized and safe routing.
Proper planning and design are essential for efficient cable laying to ens...
Top trending discussions
posted on 20 Aug 2024
posted on 27 Dec 2024
posted on 12 Oct 2023
I applied via LinkedIn and was interviewed in Sep 2023. There were 3 interview rounds.
Technical questions
I applied via Walk-in and was interviewed in Mar 2023. There were 4 interview rounds.
The Loto system stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again during maintenance or servicing.
Loto system involves locking the energy-isolating devices with individual lockout devices to prevent the machine from being turned on
Tagout involves placing a tag on the locked device to indicate that it should not be operated
Employees workin...
posted on 8 Jan 2024
SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.
SFRA stands for Sweep Frequency Response Analysis.
It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.
The test helps in identifying mechanical and electrical faults in the transformer windings.
SFRA test results can be compared with baseline me...
I was interviewed in Jul 2022.
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects incl...
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 4 interview rounds.
The process for a project involves planning, design, implementation, testing, and commissioning.
Define project scope and objectives
Create a project plan with timelines and milestones
Design the system or product
Procure necessary materials and equipment
Implement the design and build the system or product
Test the system or product to ensure it meets requirements
Commission the system or product for use
Provide ongoing suppo...
posted on 14 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Online interview and shared my experience.
Interview experience
Assistant Manager
127
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Senior Engineer
121
salaries
| ₹4.2 L/yr - ₹11.1 L/yr |
Structural Engineer
94
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹7 L/yr |
Store Officer
84
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure