I applied via Company Website and was interviewed in Sep 2021. There were 3 interview rounds.
The cost expenditure per sqm without materials depends on various factors such as location, skill level of labor, project complexity, and market conditions.
The cost expenditure per sqm without materials can vary significantly depending on the location. Labor costs tend to be higher in urban areas compared to rural areas.
The skill level of labor also affects the cost. Highly skilled laborers may charge more for their se...
BBS (Bar Bending Schedule) is prepared by calculating the number of bars required for reinforcement and their lengths.
Calculate the number of bars required for reinforcement
Calculate the length of each bar
Prepare a detailed list of all the bars required for the project
Ensure that the BBS is accurate and meets the design requirements
Use software tools like AutoCAD, Excel, etc. to prepare the BBS
Review and verify the BBS
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 6 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 20 Jun 2024
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
posted on 27 Jun 2024
Some of the top questions asked at the Aparna Constructions and Estates Assistant Manager QS interview -
based on 1 review
Rating in categories
Assistant Engineer
194
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
105
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF