I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
Top trending discussions
posted on 18 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Building construction process involves planning, designing, permitting, and construction phases.
Planning phase includes site selection, feasibility studies, and budgeting.
Designing phase involves architectural and structural design.
Permitting phase requires obtaining necessary approvals and permits from local authorities.
Construction phase includes site preparation, foundation work, structural framing, and finishing.
Qu...
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For earth...
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
posted on 12 Sep 2023
I applied via Naukri.com and was interviewed before Sep 2022. There were 4 interview rounds.
Qualification details
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, an...
What is Auto CAD and how uses
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
I applied via Company Website and was interviewed in Oct 2021. There were 4 interview rounds.
posted on 19 Jul 2021
A site engineer is responsible for overseeing construction projects and ensuring they are completed according to plans and specifications. A supervisor is a higher-level position that manages and coordinates the work of site engineers and other construction personnel.
Site engineer: responsible for overseeing construction projects, ensuring compliance with plans and specifications
Supervisor: higher-level position that m...
posted on 26 Sep 2022
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
I prioritize efficient progress, worker safety, and effective manpower management.
I closely monitor project timelines and identify areas where progress can be expedited.
I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.
For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...
posted on 18 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Building construction process involves planning, designing, permitting, and construction phases.
Planning phase includes site selection, feasibility studies, and budgeting.
Designing phase involves architectural and structural design.
Permitting phase requires obtaining necessary approvals and permits from local authorities.
Construction phase includes site preparation, foundation work, structural framing, and finishing.
Qu...
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For earth...
based on 2 reviews
Rating in categories
Civil Site Engineer
8
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Supervisor
6
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Civil Engineer
6
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹3.3 L/yr - ₹9 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies