Filter interviews by
I applied via Monster and was interviewed before Sep 2023. There was 1 interview round.
RCC stands for Reinforced Cement Concrete, a composite material used in construction for its strength and durability.
RCC is a combination of concrete and steel reinforcement bars, providing tensile strength to the structure.
It is commonly used in the construction of buildings, bridges, dams, and other structures.
The steel reinforcement bars are placed within the concrete to resist tension forces.
RCC structures are desi...
Top trending discussions
posted on 30 Dec 2024
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
posted on 22 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
Any civil engineer work 12 year experience
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
posted on 24 Jun 2024
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
posted on 11 Mar 2024
posted on 8 Oct 2022
I was interviewed before Oct 2021.
Interview experience
based on 1 review
Rating in categories
Site Engineer
10
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Supervisor
6
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Project Manager Civil
5
salaries
| ₹8.6 L/yr - ₹12.2 L/yr |
Civil Engineer
5
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Civil Site Supervisor
5
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies