Upload Button Icon Add office photos

Aarvi Encon

Compare button icon Compare button icon Compare

Filter interviews by

Aarvi Encon Interview Questions, Process, and Tips

Updated 18 Mar 2025

Top Aarvi Encon Interview Questions and Answers

View all 65 questions

Aarvi Encon Interview Experiences

Popular Designations

64 interviews found

Interview Questionnaire 

1 Question

  • Q1. Fild ke bare me wells ke bare me krismish tree ke bare me kampreser ke bare me

Production Operator Interview Questions asked at other Companies

Q1. What you think about safety and it's important?
View answer (1)

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The process of cross country pipeline project involves planning, designing, construction, testing, and commissioning.

    • Planning and feasibility study

    • Design and engineering

    • Procurement of materials and equipment

    • Construction and installation

    • Testing and commissioning

    • Operation and maintenance

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - 49 CFR Parts 1

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks or defects.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for any leaks or defects.

    • The test also checks the integrity of the pipeline and its ability to withstand the operating pressure.

    • The test is usually conducted before commissioning the pipe...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest involves filling the equipment with water and pressurizing it to check for leaks or defects.

    • Equipment is filled with water and pressurized to a specified level

    • Pressure gauges are used to monitor the pressure

    • The equipment is held at the specified pressure for a set amount of time

    • After the test, the water is drained and the equipment is inspected for leaks or defects

    • Equipment and instruments used include pumps,

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • Surface roughness should be within the specified range for the

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize the pressure inside and outside the casing during installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and casing.

    • It helps to prevent the formation of a vacuum or pressure differential during installation.

    • It also allows for the escape of air or gas trapped in the annular space.

    • Vent pipe should be installed at the highest point of the casing.

    • It shou...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding and how to eliminate them

    • Porosity

    • Incomplete fusion

    • Cracks

    • Undercutting

    • Lack of penetration

    • Contamination

    • Improper electrode storage

    • Proper welding technique and equipment maintenance can eliminate most defects

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS is a welding procedure specification, WQT is a welding qualification test, PQR is a procedure qualification record, and PQT is a performance qualification test.

    • WPS is a document that outlines the welding process to be used for a specific job

    • WQT is a test that ensures the welder is qualified to perform the welding process outlined in the WPS

    • PQR is a record that documents the results of a welding procedure qualificat...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe's internal structure.

    • Disbondment can a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

Top Aarvi Encon Project Quality Engineer Interview Questions and Answers

Q1. What is complete process of cross country pipeline project from starting to ending?
View answer (3)

Project Quality Engineer Interview Questions asked at other Companies

Q1. What is complete process of cross country pipeline project from starting to ending?
View answer (3)

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The complete process of a cross country pipeline project involves planning, design, construction, testing, and commissioning.

    • Planning phase: Identify project objectives, route selection, environmental impact assessment.

    • Design phase: Engineering design, material selection, pipeline alignment.

    • Construction phase: Clearing and grading, trenching, welding and joining, coating and insulation.

    • Testing phase: Hydrostatic testin...

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - Title 49 CFR P

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks and structural integrity.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for leaks or any other defects.

    • The test also checks the structural integrity of the pipeline by measuring the amount of deformation under pressure.

    • The test is usually conduc...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of pressure vessels and pipelines using water pressure.

    • The equipment used for hydrotest includes pumps, hoses, valves, and pressure gauges.

    • The first step is to fill the vessel or pipeline with water and remove any air pockets.

    • The second step is to gradually increase the water pressure to the desired level and hold it for a specified duration.

    • During the test, ...

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • The surface roughness should be within the specified range for

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize pressure and prevent damage to the casing during drilling and installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and the casing.

    • It allows air to escape during installation and equalizes pressure during operation.

    • It prevents damage to the casing due to pressure buildup.

    • It also allows for monitoring of the annular space for leaks or corrosion.

    • Prope...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding include porosity, cracks, incomplete fusion, and distortion.

    • Porosity: caused by gas entrapment in the weld pool. Can be prevented by proper shielding gas and electrode selection.

    • Cracks: caused by high stress or improper cooling. Can be prevented by controlling heat input and using preheat/ post-weld heat treatment.

    • Incomplete fusion: caused by insufficient heat or improper technique. Can be prev...

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS, WQT, PQR, and PQT are all related to welding processes and qualifications.

    • WPS stands for Welding Procedure Specification and outlines the welding process to be used.

    • WQT stands for Welder Qualification Test and is used to qualify a welder's skills.

    • PQR stands for Procedure Qualification Record and documents the results of a welding procedure qualification test.

    • PQT stands for Performance Qualification Test and is use...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe and analyzing the reflected waves.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

Top Aarvi Encon Project Quality Engineer Interview Questions and Answers

Q1. What is complete process of cross country pipeline project from starting to ending?
View answer (3)

Project Quality Engineer Interview Questions asked at other Companies

Q1. What is complete process of cross country pipeline project from starting to ending?
View answer (3)

Mechanical Engineer Interview Questions & Answers

user image Kamal Kant Tiwari

posted on 3 Aug 2021

Interview Questionnaire 

2 Questions

  • Q1. Tell me something about your self?
  • Q2. Apart from your CV tell something that recruiter can't see in your CV.

Top Aarvi Encon Mechanical Engineer Interview Questions and Answers

Q1. 4). How you will measure the clearance for big end bearing ?
View answer (2)

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Aarvi Encon interview questions for popular designations

 Mechanical Engineer

 (8)

 Civil Engineer

 (5)

 Field Engineer

 (3)

 Mechanical Maintenance Engineer

 (2)

 Safety Officer

 (2)

 Senior Civil Engineer

 (2)

 Project Quality Engineer

 (2)

 Senior Engineer

 (1)

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Soil mechanics
  • Q2. Pile foundation
  • Q3. Steel and concrete i.s code
  • Q4. Aggregate testing
  • Q5. Pipeline
  • Q6. Welding , tine, grading, survey etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to basics and be confident make sure u answer in English work on vocab and should have good knowledge about u project u r executing in current job.

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

Get interview-ready with Top Aarvi Encon Interview Questions

Interview Questions & Answers

user image Anonymous

posted on 14 Jul 2021

I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. You will be asked about details of your work responsibility & other works related to the industry.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Hesitate to answer any questions if you don't have any experience or knowledge in any job responsibilities then just be honest & say that & also include what else you learnt apart from your department work.

Interview Questionnaire 

1 Question

  • Q1. My self introduction and asked that what was my previous work expirence ? Some questions asking realted maintenance work that it's.

Maintenance Engineer Interview Questions asked at other Companies

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)

I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Conveyor details
  • Q2. Hammer crusher details
  • Q3. Bearing related
  • Q4. Gearbox related
  • Q5. Use of coupling
  • Ans. 

    Couplings are used to connect two shafts together to transmit power.

    • Couplings are used to compensate for misalignment between two shafts.

    • They can also be used to absorb shock and vibration.

    • Common types of couplings include rigid, flexible, and fluid couplings.

    • Examples of applications include pumps, compressors, and conveyors.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't nervous, answer what you know

Mechanical Maintenance Engineer Interview Questions asked at other Companies

Q1. What is valve and its types What is coupling and it's types Pump and its types What is Backlash Gears and it's types What is least count and least count of vernier and micrometer and how to find it. Which type of pump is centrifugal. What i... read more
View answer (1)

I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Which type of experience in oil and gas?
  • Ans. 

    I have experience in maintenance, repair, and troubleshooting of mechanical equipment in offshore oil and gas platforms.

    • Maintenance and repair of pumps, compressors, and turbines

    • Troubleshooting of hydraulic and pneumatic systems

    • Experience in working with safety protocols and regulations

    • Familiarity with preventive maintenance programs

    • Knowledge of equipment installation and commissioning

    • Experience in working with rotatin...

  • Answered by AI
  • Q2. Do you know multistage pump maintenance?
  • Ans. 

    Yes, I am familiar with multistage pump maintenance.

    • I have experience in disassembling and reassembling multistage pumps.

    • I am knowledgeable in inspecting and replacing worn out parts such as impellers and bearings.

    • I am skilled in aligning the pump and motor shafts to ensure proper operation.

    • I am proficient in troubleshooting and diagnosing issues with multistage pumps.

    • I am familiar with performing routine maintenance t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you any experience oil and gas industry you will be crack this interview easy.

Mechanical Technician Interview Questions asked at other Companies

Q1. 1. During confined space job , what is the role of safety watch ? 2. Alignment method of pump and motor. 3. Different type of Gasket , valves using in plant. 4. Compressor type and trouble shooting of reciprocating compressor.
View answer (2)

I applied via Indeed and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Explanation of the procedure of Piling in what methods? And how much time it will take to complete 01 building in the all aspects
  • Ans. 

    Piling is a construction procedure used to strengthen the foundation of a building. It involves various methods and the time taken depends on several factors.

    • Piling is done using methods like driven piles, bored piles, and auger cast piles.

    • Driven piles involve hammering precast concrete or steel piles into the ground.

    • Bored piles are created by drilling a hole into the ground and filling it with concrete.

    • Auger cast pile...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - First of all We have to capture Self confidence to complete the target in the industry,then only we can survive our ambition in the Life

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Aarvi Encon Interview FAQs

How many rounds are there in Aarvi Encon interview?
Aarvi Encon interview process usually has 1-2 rounds. The most common rounds in the Aarvi Encon interview process are Technical, HR and Resume Shortlist.
How to prepare for Aarvi Encon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aarvi Encon. The most common topics and skills that interviewers at Aarvi Encon expect are Project Management, Javascript, MySQL, Project Control and React.Js.
What are the top questions asked in Aarvi Encon interview?

Some of the top questions asked at the Aarvi Encon interview -

  1. What is complete process of cross country pipeline project from starting to end...read more
  2. Explanation of the procedure of Piling in what methods? And how much time it wi...read more
  3. What is hydrotest of pipeline & what we are checking through this tes...read more
How long is the Aarvi Encon interview process?

The duration of Aarvi Encon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Aarvi Encon Interview Process

based on 68 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

Team Lease Interview Questions
3.9
 • 202 Interviews
Symphoni HR Interview Questions
4.2
 • 20 Interviews
Harita Techserv Interview Questions
3.3
 • 19 Interviews
W3Global Interview Questions
3.7
 • 18 Interviews
Xpheno Interview Questions
3.6
 • 18 Interviews
View all

Aarvi Encon Reviews and Ratings

based on 822 reviews

3.9/5

Rating in categories

3.6

Skill development

3.7

Work-life balance

3.6

Salary

3.2

Job security

3.6

Company culture

3.1

Promotions

3.6

Work satisfaction

Explore 822 Reviews and Ratings
Field Engineer
215 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Mechanical Engineer
152 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Electrical Engineer
79 salaries
unlock blur

₹2.6 L/yr - ₹7.5 L/yr

Inspection Engineer
79 salaries
unlock blur

₹2 L/yr - ₹8 L/yr

Mechanical Technician
52 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Aarvi Encon with

Team Lease

3.9
Compare

Bonace Engineers

4.0
Compare

S2 Infotech

3.6
Compare

US Tech Solutions

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview