Aarvi Encon Project Quality Engineer Interview Questions, Process, and Tips

Updated 23 Dec 2021

Top Aarvi Encon Project Quality Engineer Interview Questions and Answers

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Q2. What is hydrotest of pipeline & what we are checking through this test?
  • Q3. What is steps of hydrotest & which equipment and instrument we are using?
View all 9 questions

Aarvi Encon Project Quality Engineer Interview Experiences

2 interviews found

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The process of cross country pipeline project involves planning, designing, construction, testing, and commissioning.

    • Planning and feasibility study

    • Design and engineering

    • Procurement of materials and equipment

    • Construction and installation

    • Testing and commissioning

    • Operation and maintenance

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - 49 CFR Parts 1

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks or defects.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for any leaks or defects.

    • The test also checks the integrity of the pipeline and its ability to withstand the operating pressure.

    • The test is usually conducted before commissioning the pipe...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest involves filling the equipment with water and pressurizing it to check for leaks or defects.

    • Equipment is filled with water and pressurized to a specified level

    • Pressure gauges are used to monitor the pressure

    • The equipment is held at the specified pressure for a set amount of time

    • After the test, the water is drained and the equipment is inspected for leaks or defects

    • Equipment and instruments used include pumps,

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • Surface roughness should be within the specified range for the

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize the pressure inside and outside the casing during installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and casing.

    • It helps to prevent the formation of a vacuum or pressure differential during installation.

    • It also allows for the escape of air or gas trapped in the annular space.

    • Vent pipe should be installed at the highest point of the casing.

    • It shou...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding and how to eliminate them

    • Porosity

    • Incomplete fusion

    • Cracks

    • Undercutting

    • Lack of penetration

    • Contamination

    • Improper electrode storage

    • Proper welding technique and equipment maintenance can eliminate most defects

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS is a welding procedure specification, WQT is a welding qualification test, PQR is a procedure qualification record, and PQT is a performance qualification test.

    • WPS is a document that outlines the welding process to be used for a specific job

    • WQT is a test that ensures the welder is qualified to perform the welding process outlined in the WPS

    • PQR is a record that documents the results of a welding procedure qualificat...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe's internal structure.

    • Disbondment can a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The complete process of a cross country pipeline project involves planning, design, construction, testing, and commissioning.

    • Planning phase: Identify project objectives, route selection, environmental impact assessment.

    • Design phase: Engineering design, material selection, pipeline alignment.

    • Construction phase: Clearing and grading, trenching, welding and joining, coating and insulation.

    • Testing phase: Hydrostatic testin...

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - Title 49 CFR P

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks and structural integrity.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for leaks or any other defects.

    • The test also checks the structural integrity of the pipeline by measuring the amount of deformation under pressure.

    • The test is usually conduc...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of pressure vessels and pipelines using water pressure.

    • The equipment used for hydrotest includes pumps, hoses, valves, and pressure gauges.

    • The first step is to fill the vessel or pipeline with water and remove any air pockets.

    • The second step is to gradually increase the water pressure to the desired level and hold it for a specified duration.

    • During the test, ...

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • The surface roughness should be within the specified range for

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize pressure and prevent damage to the casing during drilling and installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and the casing.

    • It allows air to escape during installation and equalizes pressure during operation.

    • It prevents damage to the casing due to pressure buildup.

    • It also allows for monitoring of the annular space for leaks or corrosion.

    • Prope...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding include porosity, cracks, incomplete fusion, and distortion.

    • Porosity: caused by gas entrapment in the weld pool. Can be prevented by proper shielding gas and electrode selection.

    • Cracks: caused by high stress or improper cooling. Can be prevented by controlling heat input and using preheat/ post-weld heat treatment.

    • Incomplete fusion: caused by insufficient heat or improper technique. Can be prev...

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS, WQT, PQR, and PQT are all related to welding processes and qualifications.

    • WPS stands for Welding Procedure Specification and outlines the welding process to be used.

    • WQT stands for Welder Qualification Test and is used to qualify a welder's skills.

    • PQR stands for Procedure Qualification Record and documents the results of a welding procedure qualification test.

    • PQT stands for Performance Qualification Test and is use...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe and analyzing the reflected waves.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

Project Quality Engineer Interview Questions Asked at Other Companies

asked in Aarvi Encon
Q1. What is complete process of cross country pipeline project from s ... read more
asked in Aarvi Encon
Q2. What is hydrotest of pipeline & what we are checking through ... read more
asked in Aarvi Encon
Q3. What is steps of hydrotest & which equipment and instrument w ... read more
asked in Aarvi Encon
Q4. What are the major defects of welding how we element them?
asked in Aarvi Encon
Q5. What instrument using in joint coating process and acceptance cri ... read more

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. If you are experience candidate, you'll be asked process of work you have done. And basic question belongs to your experience.
  • Q2. Keep self confidence while interview.
  • Q3. Your answers should be clear with perfect voice.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep self confidence. Answer step wise. And keep your statement positive.

Interview Questionnaire 

1 Question

  • Q1. 1.Grade of concrete..
  • Ans. 

    The grade of concrete refers to its strength and durability.

    • Concrete is classified into different grades based on its compressive strength.

    • The grade of concrete is denoted by a number followed by the letter 'M' (e.g., M20, M25).

    • The number represents the compressive strength of concrete in megapascals (MPa) after 28 days of curing.

    • Higher grade concrete has higher strength and is used for heavy-duty structures like bridg...

  • Answered by AI

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic knowledge of west heat recovery system project

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of whrs project

I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Whit is the process of water treatment plant and is functional details.

Interview Preparation Tips

Topics to prepare for ManpowerGroup Civil Engineer interview:
  • Civil Engineering
  • Water Supply
  • preparation
  • Sincerely
Interview preparation tips for other job seekers - Always remember that they saw something in you worthy to interview, take the confidence that they chose you out of all the other applicants as a start. You should read your resume by yourself or share the details of your past experience with yourself or give interview calmly and confidently. Without hazration give your best. I am sure my advice is helpful for us.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to current role question
  • Q2. Tell about building coloum and beam size
  • Ans. 

    Column and beam sizes are determined by the load they need to support and the span they need to cover.

    • The size of the column and beam is determined by the load they need to support and the span they need to cover.

    • The material used for the column and beam also affects their size.

    • The size of the column and beam can be calculated using structural engineering software.

    • For example, a 20-foot span with a load of 10,000 pound...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. What will you do if void present in the structure
  • Ans. 

    I will assess the severity of the void and determine the appropriate course of action.

    • Conduct a thorough inspection of the structure to determine the size and location of the void

    • Evaluate the potential impact of the void on the structural integrity of the building

    • Determine the appropriate repair method based on the severity of the void and the type of structure

    • Consult with structural engineers and other experts as need...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall practical based questions related to your work

Skills evaluated in this interview

I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

Shearing site information how to managing safety work and implementation safety at site

Round 2 - HR 

(4 Questions)

  • Q1. Given information about the lowering ?
  • Ans. Before starting work check all legal documents of side boom. all tool TPI certificate available or not oprator have good experience, trained Rigger and supervision as well as maintain safety standards
  • Answered Anonymously
  • Q2. If any person not practice safety so what can you do?
  • Ans. Daily safety noncompliance report submitte to contactor if his not fillfull our safety standards than we are impose penalty
  • Answered Anonymously
  • Q3. Are you connected Audit
  • Ans. 

    Yes, I am connected to audits as a Safety Officer.

    • I have experience conducting safety audits to identify potential hazards and ensure compliance with safety regulations.

    • I am familiar with audit processes and procedures, including documentation and reporting.

    • I have worked closely with auditors to address any safety concerns or deficiencies found during audits.

    • I have implemented corrective actions based on audit findings...

  • Answered by AI
  • Q4. Tell me your salary?

Interview Preparation Tips

Topics to prepare for Team Lease Safety Officer interview:
  • IMS Audit, risk assessment, safe
Interview preparation tips for other job seekers - I like your esteemed organisation his cultural system and good relations with employees Very easily connected with HO and online systems as well as IMS Audit, Risk assessment,
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Equipment related Questions like excavator crane etc

I applied via AmbitionBox and was interviewed in Sep 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical Optical Fibre
  • Q2. Communication Skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Optical Fibre Telecommunication And Project Management And Networking Management All OFC
Contribute & help others!
anonymous
You can choose to be anonymous

Aarvi Encon Interview FAQs

What are the top questions asked in Aarvi Encon Project Quality Engineer interview?

Some of the top questions asked at the Aarvi Encon Project Quality Engineer interview -

  1. What is complete process of cross country pipeline project from starting to end...read more
  2. What is hydrotest of pipeline & what we are checking through this tes...read more
  3. What is steps of hydrotest & which equipment and instrument we are usin...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

JOBS

HDFC Life

No Jobs

INTERVIEWS

Aarvi Encon

No Interviews

INTERVIEWS

Experis IT

No Interviews

INTERVIEWS

Aarvi Encon

No Interviews

INTERVIEWS

Experis IT

No Interviews

JOBS

NovoTree Minds Consulting

No Jobs

INTERVIEWS

Experis IT

No Interviews

INTERVIEWS

Team Lease

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Quess Interview Questions
3.9
 • 406 Interviews
Randstad Interview Questions
3.8
 • 259 Interviews
Team Lease Interview Questions
3.9
 • 200 Interviews
Adecco Group Interview Questions
3.7
 • 87 Interviews
ManpowerGroup Interview Questions
3.8
 • 51 Interviews
Iksula Interview Questions
3.5
 • 27 Interviews
Symphoni HR Interview Questions
4.2
 • 20 Interviews
View all
Field Engineer
196 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
161 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Inspection Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
76 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Technician
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Aarvi Encon with

Quess

3.9
Compare

Team Lease

3.9
Compare

Iksula

3.5
Compare

Randstad

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview