Top Aarvi Encon Project Quality Engineer Interview Questions and Answers

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Q2. What is hydrotest of pipeline & what we are checking through this test?
  • Q3. What is steps of hydrotest & which equipment and instrument we are using?
View all 9 questions

Aarvi Encon Project Quality Engineer Interview Experiences

2 interviews found

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The complete process of a cross country pipeline project involves planning, design, construction, testing, and commissioning.

    • Planning phase: Identify project objectives, route selection, environmental impact assessment.

    • Design phase: Engineering design, material selection, pipeline alignment.

    • Construction phase: Clearing and grading, trenching, welding and joining, coating and insulation.

    • Testing phase: Hydrostatic testin...

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - Title 49 CFR P

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks and structural integrity.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for leaks or any other defects.

    • The test also checks the structural integrity of the pipeline by measuring the amount of deformation under pressure.

    • The test is usually conduc...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of pressure vessels and pipelines using water pressure.

    • The equipment used for hydrotest includes pumps, hoses, valves, and pressure gauges.

    • The first step is to fill the vessel or pipeline with water and remove any air pockets.

    • The second step is to gradually increase the water pressure to the desired level and hold it for a specified duration.

    • During the test, ...

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • The surface roughness should be within the specified range for

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize pressure and prevent damage to the casing during drilling and installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and the casing.

    • It allows air to escape during installation and equalizes pressure during operation.

    • It prevents damage to the casing due to pressure buildup.

    • It also allows for monitoring of the annular space for leaks or corrosion.

    • Prope...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding include porosity, cracks, incomplete fusion, and distortion.

    • Porosity: caused by gas entrapment in the weld pool. Can be prevented by proper shielding gas and electrode selection.

    • Cracks: caused by high stress or improper cooling. Can be prevented by controlling heat input and using preheat/ post-weld heat treatment.

    • Incomplete fusion: caused by insufficient heat or improper technique. Can be prev...

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS, WQT, PQR, and PQT are all related to welding processes and qualifications.

    • WPS stands for Welding Procedure Specification and outlines the welding process to be used.

    • WQT stands for Welder Qualification Test and is used to qualify a welder's skills.

    • PQR stands for Procedure Qualification Record and documents the results of a welding procedure qualification test.

    • PQT stands for Performance Qualification Test and is use...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe and analyzing the reflected waves.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is complete process of cross country pipeline project from starting to ending?
  • Ans. 

    The process of cross country pipeline project involves planning, designing, construction, testing, and commissioning.

    • Planning and feasibility study

    • Design and engineering

    • Procurement of materials and equipment

    • Construction and installation

    • Testing and commissioning

    • Operation and maintenance

  • Answered by AI
  • Q2. What are cods and standards follow for laying pipeline?
  • Ans. 

    Various codes and standards are followed for laying pipelines to ensure safety and quality.

    • API 1104 - Welding of Pipelines and Related Facilities

    • ASME B31.4 - Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

    • ASME B31.8 - Gas Transmission and Distribution Piping Systems

    • ISO 13623 - Petroleum and Natural Gas Industries - Pipeline Transportation Systems

    • DOT Pipeline Safety Regulations - 49 CFR Parts 1

  • Answered by AI
  • Q3. What is hydrotest of pipeline & what we are checking through this test?
  • Ans. 

    Hydrotest is a pressure test conducted on pipelines to check for leaks or defects.

    • Hydrotest involves filling the pipeline with water and pressurizing it to a specified level.

    • The pressure is maintained for a specified duration to check for any leaks or defects.

    • The test also checks the integrity of the pipeline and its ability to withstand the operating pressure.

    • The test is usually conducted before commissioning the pipe...

  • Answered by AI
  • Q4. What is steps of hydrotest & which equipment and instrument we are using?
  • Ans. 

    Hydrotest involves filling the equipment with water and pressurizing it to check for leaks or defects.

    • Equipment is filled with water and pressurized to a specified level

    • Pressure gauges are used to monitor the pressure

    • The equipment is held at the specified pressure for a set amount of time

    • After the test, the water is drained and the equipment is inspected for leaks or defects

    • Equipment and instruments used include pumps,

  • Answered by AI
  • Q5. What instrument using in joint coating process and acceptance criteria of surface roughness?
  • Ans. 

    The instrument used in joint coating process is a profile gauge. Acceptance criteria for surface roughness is specified in the project specifications.

    • Profile gauge is used to measure the surface roughness of the joint coating.

    • Acceptance criteria for surface roughness is specified in the project specifications.

    • Surface roughness is measured in microns or mils.

    • Surface roughness should be within the specified range for the

  • Answered by AI
  • Q6. What is role of vent pipe in cased crossing?
  • Ans. 

    Vent pipe is used to equalize the pressure inside and outside the casing during installation of pipelines.

    • Vent pipe is installed in the annular space between the carrier pipe and casing.

    • It helps to prevent the formation of a vacuum or pressure differential during installation.

    • It also allows for the escape of air or gas trapped in the annular space.

    • Vent pipe should be installed at the highest point of the casing.

    • It shou...

  • Answered by AI
  • Q7. What are the major defects of welding how we element them?
  • Ans. 

    Major defects in welding and how to eliminate them

    • Porosity

    • Incomplete fusion

    • Cracks

    • Undercutting

    • Lack of penetration

    • Contamination

    • Improper electrode storage

    • Proper welding technique and equipment maintenance can eliminate most defects

  • Answered by AI
  • Q8. What is difference between WPS, WQT, PQR, PQT?
  • Ans. 

    WPS is a welding procedure specification, WQT is a welding qualification test, PQR is a procedure qualification record, and PQT is a performance qualification test.

    • WPS is a document that outlines the welding process to be used for a specific job

    • WQT is a test that ensures the welder is qualified to perform the welding process outlined in the WPS

    • PQR is a record that documents the results of a welding procedure qualificat...

  • Answered by AI
  • Q9. How to check disbondment in cold bend pipe ?
  • Ans. 

    Disbondment in cold bend pipe can be checked using visual inspection, ultrasonic testing, and radiography.

    • Visual inspection can detect disbondment on the surface of the pipe.

    • Ultrasonic testing can detect disbondment in the pipe wall by sending high-frequency sound waves through the pipe.

    • Radiography can detect disbondment by using X-rays or gamma rays to create an image of the pipe's internal structure.

    • Disbondment can a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview schedule with IOCL bhopal. They are asking basic questions from cross country pipeline project. Asking about code & standards ( like ASME, API & ASNT etc.) And measuring instrument which we are using on site. Basics about welding and it's defects.

Project Quality Engineer Interview Questions Asked at Other Companies

asked in Aarvi Encon
Q1. What is complete process of cross country pipeline project from s ... read more
asked in Aarvi Encon
Q2. What is hydrotest of pipeline & what we are checking through ... read more
asked in Aarvi Encon
Q3. What is steps of hydrotest & which equipment and instrument w ... read more
asked in Aarvi Encon
Q4. What are the major defects of welding how we element them?
asked in Aarvi Encon
Q5. What instrument using in joint coating process and acceptance cri ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self
  • Ans. 

    I am a detail-oriented Quality Controller with a strong background in ensuring product quality and compliance.

    • Experienced in conducting quality inspections and audits

    • Skilled in identifying and resolving quality issues

    • Knowledgeable in quality control processes and procedures

    • Strong attention to detail and accuracy

    • Excellent communication and problem-solving skills

  • Answered by AI

Quality Assurance Interview Questions & Answers

Team Lease user image Shital Santosh Badgujar

posted on 15 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Introduction, study background
  • Q2. Experience related.

Interview Preparation Tips

Interview preparation tips for other job seekers - typing speed and confidence matter.

Aarvi Encon Interview FAQs

What are the top questions asked in Aarvi Encon Project Quality Engineer interview?

Some of the top questions asked at the Aarvi Encon Project Quality Engineer interview -

  1. What is complete process of cross country pipeline project from starting to end...read more
  2. What is hydrotest of pipeline & what we are checking through this tes...read more
  3. What is steps of hydrotest & which equipment and instrument we are usin...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Quess Interview Questions
3.9
 • 406 Interviews
Randstad Interview Questions
3.8
 • 259 Interviews
Team Lease Interview Questions
3.9
 • 200 Interviews
Adecco Group Interview Questions
3.7
 • 87 Interviews
ManpowerGroup Interview Questions
3.8
 • 51 Interviews
Iksula Interview Questions
3.5
 • 27 Interviews
Symphoni HR Interview Questions
4.2
 • 20 Interviews
View all
Field Engineer
196 salaries
unlock blur

₹3.6 L/yr - ₹5 L/yr

Mechanical Engineer
161 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Inspection Engineer
79 salaries
unlock blur

₹2 L/yr - ₹8 L/yr

Electrical Engineer
76 salaries
unlock blur

₹2.8 L/yr - ₹8.2 L/yr

Mechanical Technician
52 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Aarvi Encon with

Quess

3.9
Compare

Team Lease

3.9
Compare

Iksula

3.5
Compare

Randstad

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview