Filter interviews by
I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.
I appeared for an interview in Apr 2023.
I have been working as a piping engineer for 5 years.
I have 5 years of experience working specifically as a piping engineer.
During this time, I have gained expertise in designing, analyzing, and implementing piping systems.
I have worked on various projects that involved piping design, layout, and maintenance.
I have also collaborated with other engineers and professionals to ensure the successful completion of projects.
Yes, I have experience working on piping in various projects.
I have designed piping systems for industrial plants
I have conducted stress analysis on piping systems
I have worked on troubleshooting and maintenance of piping systems
I appeared for an interview before Mar 2024, where I was asked the following questions.
I have worked on various civil engineering projects, including residential, commercial, and infrastructure developments.
Led the construction of a 200-unit residential complex, overseeing project timelines and budgets.
Managed the design and implementation of a new bridge, improving traffic flow by 30%.
Collaborated with architects on a commercial building project, ensuring compliance with local regulations.
Conducted site...
Pre-Engineering Buildings (PEB) are prefabricated structures designed for quick assembly and cost efficiency.
PEB structures are made from steel and are designed for rapid construction.
They are commonly used for warehouses, factories, and commercial buildings.
PEB systems allow for flexibility in design and can be customized to meet specific needs.
Examples include sports complexes, aircraft hangars, and retail stores.
Quality of construction is ensured through inspections, material testing, adherence to standards, and continuous monitoring.
Conduct regular site inspections to ensure compliance with design specifications.
Perform material tests, such as concrete slump tests, to verify quality.
Review and adhere to building codes and standards relevant to the project.
Implement a quality management system to document and address issues.
En...
My notice period is typically two weeks, allowing for a smooth transition and handover of responsibilities.
Standard notice period in my current role is two weeks.
This timeframe allows me to complete ongoing projects and assist in the transition.
I believe in leaving my responsibilities in good order for my successor.
If needed, I can negotiate a shorter or longer notice period based on project requirements.
Aarvi Encon interview questions for popular designations
Rigid pavement is made of concrete while flexible pavement is made of asphalt. Crust thickness is determined by traffic load and soil type.
Rigid pavement is more durable and has a longer lifespan than flexible pavement.
Flexible pavement is easier and cheaper to repair than rigid pavement.
Crust thickness is determined by factors such as traffic load, soil type, and climate conditions.
High embankment requires a wider for...
Approach slabs are provided for rectification of rigid pavement to ensure smooth transition and prevent damage to the pavement.
Approach slabs are used to provide a smooth transition between the rigid pavement and the adjacent flexible pavement.
They also help to distribute the load from the flexible pavement to the rigid pavement.
Crust thickness details vary for each project depending on factors such as traffic volume, ...
Get interview-ready with Top Aarvi Encon Interview Questions
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 3 interview rounds.
Equipment installation involves setting up machinery and ensuring it operates correctly.
Understanding technical specifications and blueprints
Assembling and connecting components
Testing and troubleshooting
Adhering to safety regulations
Collaborating with other professionals
Examples: installing HVAC systems, manufacturing equipment, or production lines
I applied via Naukri.com and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
Troubleshooting in a plant involves identifying and resolving issues that affect production and efficiency.
Start by gathering information about the problem and its symptoms
Use diagnostic tools and techniques to identify the root cause
Develop and implement a plan to address the issue
Monitor the situation to ensure the solution is effective
Document the problem and solution for future reference
I appeared for an interview before Jan 2022.
Case study on Blending ratio.
Vessel operation procedures involve a set of guidelines and documentation to ensure safe and efficient operations.
Vessel operation procedures include pre-departure checks, navigation procedures, communication protocols, and emergency response plans.
Documentation includes vessel logs, maintenance records, safety checklists, and crew training records.
Procedures and documentation must comply with international maritime re...
Key points to plan for a vessel include route, cargo, crew, fuel, and safety measures.
Determine the most efficient and safe route for the vessel to take
Consider the type and amount of cargo being transported
Ensure the crew is properly trained and equipped for the voyage
Calculate the necessary amount of fuel and provisions for the journey
Implement safety measures such as lifeboats, fire extinguishers, and emergency proc
Stock loss can be calculated by taking the difference between actual stock and recorded stock. Preventive actions include regular stock checks and implementing security measures.
Calculate stock loss by subtracting actual stock from recorded stock
Regularly check stock levels to identify any discrepancies
Implement security measures such as CCTV cameras and security personnel
Train staff on proper stock management procedur...
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
M20 grade of concrete has a compressive strength of 20 N/mm² after 28 days.
M20 grade of concrete is a mix of 1:1.5:3 cement, sand, and aggregate respectively.
It is commonly used for residential and commercial construction.
The compressive strength of M20 grade concrete after 28 days is 20 N/mm².
This strength can be achieved by proper curing and water-cement ratio.
Some of the top questions asked at the Aarvi Encon interview -
The duration of Aarvi Encon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 68 interviews
Interview experience
based on 822 reviews
Rating in categories
Field Engineer
215
salaries
| ₹3.5 L/yr - ₹5 L/yr |
Mechanical Engineer
152
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Electrical Engineer
79
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Inspection Engineer
79
salaries
| ₹2 L/yr - ₹8 L/yr |
Mechanical Technician
52
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Team Lease
Bonace Engineers
S2 Infotech
US Tech Solutions